Overview
Status | Closing / Closed |
Mine Type | Open Pit |
Commodities |
- Coal (metallurgical)
- Coal (PCI)
|
Mining Method |
|
Mine Life | 2020 |
As planned, Cardinal River Operations in Alberta completed its final production in the second quarter and began transitioning to closure in the second half of 2020. |
Source:
p. 64
Contractors
- Subscription is required.
Summary:
All of Teck’s coal mines are conventional open pit operations and are designed to operate on a continuous basis, 24 hours per day, 365 days per year.
Source:
Summary:

- subscription is required.
Production:
Commodity | Units | 2017 | 2016 |
Coal (metallurgical)
|
Mt
| 1.3 | 1.3 |
All production numbers are expressed as clean coal.
Operational Metrics:
Metrics | 2019 | 2018 | 2017 | 2016 | 2015 | 2014 |
Annual mining capacity
| 2 Mt | 2 Mt | 2 Mt | 2 Mt | 2 Mt | 2 Mt |
Coal washing plant annual capacity
| 3.5 Mt of clean coal | 3.5 Mt of clean coal | 3.5 Mt of clean coal | 3.5 Mt of clean coal | 3 Mt of clean coal | 3 Mt of clean coal |
Reserves at December 31, 2019:
Category | Tonnage | Commodity |
Proven
|
1,200 kt
|
Coal (metallurgical)
|
Probable
|
200 kt
|
Coal (metallurgical)
|
Proven & Probable
|
1,400 kt
|
Coal (metallurgical)
|
Measured
|
33,600 kt
|
Coal (metallurgical)
|
Measured
|
1,500 kt
|
Coal (PCI)
|
Indicated
|
2,500 kt
|
Coal (metallurgical)
|
Indicated
|
300 kt
|
Coal (PCI)
|
Inferred
|
500 kt
|
Coal (metallurgical)
|