Mining Intelligence and News
United States

South Hallsville No. 1 (Sabine) Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusClosing / Closed
Commodities
  • Coal (thermal)
Mining Method
  • Dragline
  • Truck & Shovel / Loader
Production Start... Lock
SnapshotAll production from the South Hallsville No. 1 (Sabine) is delivered to Southwestern Electric Power Company's Henry W. Pirkey Plant. SWEPCO is an American Electric Power company. As a result of the early retirement of the Pirkey Plant, Sabine ceased deliveries in March 2023 and final reclamation began on April 1, 2023. Reclamation is expected to be complete by 2037.

Owners

SourceSource
CompanyInterestOwnership
American Electric Power Company, Inc. 100 % Indirect
Southwestern Electric Power Company (a wholly-owned subsidiary of American Electric Power Company, Inc.) controls all of the reserves within the Sabine (South Hallsville No. 1) Mine.

Contractors

Lock

- subscription is required.

Deposit type

  • Sedimentary

Summary:

Type of Mine: Surface Lignite
Coal Formation: Wilcox Formation
Average Seam Thickness: 3 feet
Average Depth: 85 feet

Average Coal Quality (As received):
Heat Content - 6,448 BTUs/lb
Sulfur - 0.79%
Ash - 18.2%
Moisture - 32%

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Summary:

Production

CommodityUnits20222021202020192018201720162015
Coal (thermal) tons  ....  Subscribe  ....  Subscribe  ....  Subscribe3,138,8923,501,8453,838,8064,186,6583,640,237
Heat ContentBTU/lb6,4486,453
Sulfur%0.791.29
All production numbers are expressed as ROM coal.

Operational metrics

Metrics20222021202020192018201720162015
Coal tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe3,138,892 tons3.5 M tons3.84 M tons4.19 M tons3.64 M tons

Production Costs

Commodity production costs have not been reported.

Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Jul 7, 2023

Total WorkforceYear
...... Subscription required 2022
...... Subscription required 2021
...... Subscription required 2020
...... Subscription required 2019
...... Subscription required 2018
...... Subscription required 2017
...... Subscription required 2016
...... Subscription required 2015
...... Subscription required 2014
...... Subscription required 2013
...... Subscription required 2012
...... Subscription required 2011

Aerial view:

Lock

- subscription is required.