Overview
Status | Closing / Closed |
Mine Type | Open Pit |
Commodities |
|
Mining Method |
|
Production Start | ...  |
September 30, 2020 - Advanced Emissions Solutions (“AES”) announced its intent to close the Marshall Mine. Caddo Creek entered into a contract with a subsidiary of AES to perform the required mine reclamation. The reclamation at Caddo Creek is expected to be substantially complete during the first half of 2022.
Full reclamation of the Marshall Mine is expected to be completed by 2030. |
Source:
p. 2
On September 30, 2020, Cabot Norit Americas, Inc. (“Cabot Norit”), a wholly-owned subsidiary of Cabot Corporation, and ADA Carbon Solutions (Operations) LLC (“ADACS”), a wholly-owned subsidiary of Advanced Emissions Solutions, Inc. (“ADES”), entered into a purchase and sale agreement for the sale, for a nominal amount, to ADACS of all of Cabot Norit’s membership interest in Marshall Mine LLC, which owns a lignite mine in Marshall, Texas (the “Marshall Mine”).
September 30, 2020 - Caddo Creek Resources Company LLC, a subsidiary of North American Coal Corporation, has entered into a contract to perform the mine reclamation.
Contractors
- Subscription is required.
Summary:
Type of Mine: Surface Lignite
Coal Formation/Coal Seam: Wilcox Formation A Seam
Average Seam Thickness: 3.1 feet
Average Depth: 62 feet
Average Coal Quality (As received):
Heat Content - 7,152 BTUs/lb
Sulfur - 0.54%
Ash - 9.17%
Moisture - 34%
Summary:
Mining Method: dragline operation with 1 dragline.
General description
Overburden, the material between the surface of the land and the coal seam, is removed using draglines, dozers and/or trucks and shovels, including electric rope shovels. Coal is then extracted and loaded onto haul trucks using surface miners, excavators, dozers, scrapers, backhoes and other machinery and equipment. Coal is taken to a stockpile or delivered directly to customers via conveyor or short haul rail. After mining, draglines and/or trucks and shovels are used to backfill the overburden that was removed at the beginning of the process to allow for site reclamation.
Production:
Commodity | Units | 2020 | 2019 | 2018 | 2017 | 2016 | 2015 |
Coal (thermal)
|
tons
| ......  | ......  | 185,097 | 240,240 | 213,647 | 210,573 |
Heat Content | BTU/lb | | 7,152 | | | | |
Sulfur | % | | 0.54 | | | | |
All production numbers are expressed as ROM coal.
- Subscription is required.
Operational Metrics:
Metrics | 2020 | 2019 | 2018 | 2017 | 2016 | 2015 |
Coal tonnes mined
| ......  | 185,718 tons | 185,097 tons | 240,240 tons | 213,647 tons | 210,573 tons |
- Subscription is required.
Reserves at December 31, 2019:
Category | Tonnage | Commodity |
Proven & Probable
|
19.2 M tons
|
Coal (thermal)
|
- Subscription is required.