Overview
Stage | Production |
Mine Type | Open Pit & Underground |
Commodities |
|
Mining Method |
- Truck & Shovel / Loader
- Dragline
- Bord-and-pillar
|
Production Start | ...  |
Mine Life | 2029 |
Source:
p. 1,2
Seriti Resources Holdings Proprietary Ltd. acquired the Kriel mine from Anglo American in March 2018.
Seriti Resources Holdings Pty Ltd (‘Seriti’) is a broad based, 91% black owned and controlled South African mining company co- owned by four black anchor shareholders, Masimong Group, Thebe Investments, Zungu Investments (Zico) and Community Investment Holdings (CIH). Seriti Coal Community Employee, and Management Trusts own 10% of the Seriti Resources Holdings Pty Ltd.
Seriti, through its operating subsidiary, Seriti Coal Pty Ltd, operates three large- scale, opencast and underground thermal coal mines namely, New Vaal, New Denmark and Kriel Collieries.
Contractors
- Subscription is required.
Summary:
The Highveld Coalfield in the Mpumalanga Province of South Africa is situated on the northern part of the main Karoo Basin. The Karoo Supergroup can be divided into the Dwyka, Ecca, Beaufort, Stormberg and Drakensberg Groups.
The Highveld Coalfield is underlain by a thin sequence of Dwyka and Middle Ecca strata lying on an undulating floor composed of felsites, granites, and diabase associated with the Bushveld Complex.
The Vryheid Formation of the Ecca Group, where the coal occurs, conformably overlies the tillite with minor conglomerates, sandstones, shales and coal. In the Highveld (and Witbank) coal fields, the glacial deposits of the Dwyka Group are directly overlain by rocks of the Vryheid formation, as the Pietermaritzburg formation is absent in these coal fields. The overlying Volksrust Formation is also either not developed or completely eroded away in the central Mpumalanga coal fields.
Pre-Karoo dolerites have greatly intruded the geological sequence of the Highveld Coalfield. There are two main dolerite sills in the coalfield, with more extensive thinner sills 1.5 m to 15 m thick. Where a dolerite sill has intruded, the seam is faulted, resulting in a vertical throw ranging from 6 to 25 m.
A major dolerite sill of up to 14 m is generally situated below the No. 2 seam in the Pit 4, 23 and 23 extension areas.
The basin depth is approximately 300 m, with the coal zone approximately 70 m thick. Five major coal se ........

Mining Methods
- Truck & Shovel / Loader
- Dragline
- Bord-and-pillar
Summary:
The colliery uses mechanised bord-and-pillar methods to mine the underground operation, and its opencast operation uses draglines as well as truck-and-shovels.
Board and pillar mining is typically used for flat or gently dipping bedded ores or coal seams. Once the coal seam has been accessed, the ore is mined utilising a regular grid of mining tunnels and involves progressively excavating panels into the coal seam whilst leaving behind pillars of coal to support the mine. The coal is then removed in a regular pattern while the rooms are mined out through the tunnels by drill and blast methods or a Continuous Miner and deposited onto a conveyor. The open chambers remaining following coal removal is referred to as a stope. The remaining coal contained within the pillars may be won at closure by a retreating system, starting at the farthest point from the stope access, allowing the roof to collapse and fill in the stope. This allows a greater recovery as less ore is left behind in pillars.
The coal is mined from the Number 4 Seam (No 4 Seam), while the Number 2 Seam (No 2 Seam) and Number 5 Seam (No 5 Seam) are classified as low potential Coal Resources. Annual production is in the order of 5 Mtpa.
Production:
Kriel mine was acquired from Anglo American in March 2018 by Seriti Resources Holdings Proprietary Ltd.
As a result 2018 full year production numbers have not been reported.
Starting from 2020 Seriti Resources reports average annual production of 5 Mt.
Commodity | Units | 2020 * | 2019 | 2017 | 2016 | 2015 |
Coal (thermal)
|
Mt
| ...... * | ......  | 5.4 | 6.3 | 6.2 |
All production numbers are expressed as ROM coal.
* Average annual production reported in 2020
- Subscription is required.
Operational Metrics:
Metrics | 2019 |
Raw coal annual capacity
| 5 Mt |
Reserves at December 31, 2017:
Category | OreType | Tonnage | Commodity |
Proven
|
In-Situ (OP)
|
1.7 Mt
|
Coal (thermal)
|
Proven
|
In-Situ (UG)
|
4.7 Mt
|
Coal (thermal)
|
Probable
|
In-Situ (UG)
|
16 Mt
|
Coal (thermal)
|
Proven & Probable
|
In-Situ (OP)
|
1.7 Mt
|
Coal (thermal)
|
Proven & Probable
|
In-Situ (UG)
|
20.8 Mt
|
Coal (thermal)
|
Proven & Probable
|
Total
|
22.5 Mt
|
Coal (thermal)
|
Measured & Indicated
|
In-Situ (OP)
|
59 Mt
|
Coal (thermal)
|
Measured & Indicated
|
In-Situ (UG)
|
75.5 Mt
|
Coal (thermal)
|
Measured & Indicated
|
Total
|
134.5 Mt
|
Coal (thermal)
|
Heavy Mobile Equipment as of August 12, 2021: