Overview
Stage | Production |
Mine Type | Underground |
Commodities |
|
Mining Method |
|
Processing |
- Flotation
- Dense media separation
|
East Tennessee consists of a processing plant and three underground zinc mines: Young, Coy and Immel. Ore from the three mines is processed into zinc concentrate at the Young mine site.
Publication of the Half Year Results 2019 are now being rescheduled to Friday 29 November 2019 |
Source:
Trafigura Group Pte Ltd. (“Trafigura”), a market leader in the global commodities industry, has today become the majority owner of the operating business of Nyrstar, a global multi-metals business.
Summary:
East Tennessee Mines are comprised of three operating mines: Coy, Immel and Young, located approximately 30 kilometres north-east of Knoxville, Tennessee. Zinc mineralisation occurs in Mississippi Valley Type (‘MVT’) deposits as open-space fillings of breccias and fractures within limestones and dolomites.
Processing
- Flotation
- Dense media separation
Source:
Summary:
Ore from the three mines is processed into zinc concentrate at the Young mine site. The East Tennessee zinc mine complex has a close association with Nyrstar’s Clarksville smelter.
Recoveries & Grades:
Commodity | Parameter | 2018 | 2017 | 2016 | 2015 | 2014 | 2013 |
Zinc
|
Recovery Rate, %
| ......  | ......  | ......  | ......  | ......  | ......  |
Zinc
|
Head Grade, %
| 3.6 | 3.48 | 3.61 | 3.57 | 3.53 | 3.71 |
- Subscription is required.
Production:
Commodity | Product | Units | 2018 | 2017 | 2016 | 2015 | 2014 | 2013 |
Zinc
|
Metal in concentrate
|
kt
| ......  | 66 | 62 | 64 | 63 | 71 |
Zinc
|
Concentrate
|
kt
| ......  | 107 | 101 | 104 | 101 | 113 |
- Subscription is required.
Operational Metrics:
Metrics | 2018 | 2017 | 2016 | 2015 | 2014 | 2013 |
Tonnes milled
| ......  | ......  | 1,829 kt of ore | 1,985 kt of ore | 1,955 kt of ore | 2,019 kt of ore |
- Subscription is required.
Reserves at December 31, 2018:
Category | Tonnage | Commodity | Grade |
Proven
|
0.34 Mt
|
Zinc
|
3.3 %
|
Probable
|
5.27 Mt
|
Zinc
|
4.4 %
|
Proven & Probable
|
5.61 Mt
|
Zinc
|
4.4 %
|
Measured
|
0.45 Mt
|
Zinc
|
3.5 %
|
Indicated
|
7.04 Mt
|
Zinc
|
4.4 %
|
Measured & Indicated
|
7.49 Mt
|
Zinc
|
4.3 %
|
Inferred
|
24.41 Mt
|
Zinc
|
3.7 %
|
Operating Costs:
| Units | 2018 | 2017 | 2016 | 2015 |
Direct operating costs ($/t milled)
|
USD
| 38 | 40 | 38 | 42 |
Mine Management:
Job Title | Name | Profile | Ref. Date |
.......................
|
.......................
|
|
Sep 21, 2020
|
.......................
|
.......................
|
|
Sep 21, 2020
|
.......................
|
.......................
|
|
Sep 21, 2020
|
.......................
|
.......................
|
|
Sep 21, 2020
|
.......................
|
.......................
|
|
Sep 21, 2020
|
.......................
|
.......................
|
|
Sep 21, 2020
|
.......................
|
.......................
|
|
Sep 21, 2020
|
.......................
|
.......................
|
|
Sep 21, 2020
|
.......................
|
.......................
|
|
Sep 21, 2020
|
.......................
|
.......................
|
|
Sep 21, 2020
|
- Subscription is required.
Staff:
Employees | Year |
|
2017
|
Corporate Filings & Presentations:
- Subscription is required.
Aerial view:
- Subscription is required.