CST Coal Canada Limited (CST Coal) commenced mining in the West Extension pit phase of No.8 Mine in July of 2018 and mined this area in 2 periods from 2018 to May, 2020, and from November 2021 to now.
There are three underground resource areas (No.9, No.12 South B2 and No.12 South A, and five open pit resource areas (No.8 Mine, No.2 Surface, No.9 Surface, No.12 North Surface and No.16 Surface), within the CST Coal Property boundary.
The entire No.8 Mine reserve area is covered by a Mine Permit. |