• Data Access
  • Your Email  
  • Your Email  
Keep me signed in.
Forgot your password?
Close
  • Forgot Your Password?
  • Enter the email you signed up with and we'll email it to you.
  • Your Email  
Close
Back
MDO
Mining Data Solutions
  • Home
  • Database
  • Subscribe
  • Sign In
  • Sign In
Australia
Thalanga Operation

This page is not tailored to
devices with screen width under 750 px.
 Location:
65 km SW from Charters Towers, Queensland, Australia

  Address:
PO Box 1248
Charters Towers
Queensland, Australia
4820
Phone  ...  Subscription required
EmailEmail
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in Australia
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Costs & Financials
  • Fleet
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StageProduction
Mine TypeOpen Pit & Underground
Commodities
  • Copper
  • Lead
  • Zinc
  • Gold
  • Silver
Mining Method
  • Truck & Shovel / Loader
  • Longhole stoping
  • Cemented backfill
  • Backfill
Production Start...
Mine Life10 years (as of Jan 1, 2021)
Thalanga Operations consists of a 650ktpa capacity processing plant. Thalanga Operations commenced production from the West 45 deposit in 2017. Ore for the Thalanga Operation is currently being sourced from the Far West underground mine, with plans to develop the Liontown deposit to extend the operational life of Thalanga.


Owners

Source: p. 12
CompanyInterestOwnership
Red River Resources Ltd. 100 % Indirect
Red River’s foundation asset is the Thalanga Base Metal Operation in Northern Queensland.

Contractors

Subscription required - Subscription is required.


Deposit Type

  • VMS


Summary:

The Thalanga Operation is located in the highly prospective Cambro-Ordovician Mt Windsor Volcanic Belt which contains a number of known polymetallic (copper-lead-zinc +/- gold-silver) volcanic hosted massive sulphide (VHMS) deposits and gold deposits.

The West 45 deposit is located 1.7km west of the Thalanga Plant and it is ~1.4km by unsealed road from the portal to the run of mine (ROM) ore pad.

The Far West deposit is located ~500m from the ROM pad at the Plant, to the west of and directly adjacent to the historically mined Thalanga West deposit. Far West sits within existing mining leases. Much like West 45, Far West is a VHMS deposit which is of polymetallic nature and contains zinc, lead, copper, gold and silver.

The Waterloo deposit is located approximately 40km to the SSW of Charters Towers and ~50km east from the Thalanga mine. As with the West 45 and Far West deposits, Waterloo is a VHMS deposit which contains zinc, lead, copper, gold and silver. Red River intends to mine Waterloo and truck the ore to the Thalanga Plant for processing.

The Liontown polymetallic volcanogenic hosted massive sulphide deposit is located 40km southwest of Charters Towers in North Queensland. It is accessed by the Flinders Highway and the Gregory Developmental Road. Red River acquired the Liontown Project in 2014 with the acquisition of the Thalanga Base Metal Operations.

Mineralisation in the Liontown Horizon is developed in the bas ........


Mining Methods

  • Truck & Shovel / Loader
  • Longhole stoping
  • Cemented backfill
  • Backfill


Summary:

Red River acquired the Thalanga Operation in 2014 and commenced production from the West 45 deposit in 2017. Production from West 45 ceased in 2020 and ore for the Thalanga Operation is currently being sourced from the Far West underground mine, with plans to develop the Liontown deposit to extend the operational life of Thalanga. As per West 45, Far West will be mined using long hole stoping (LHS), based on the advice provided by the independent technical consultant, Mining One. This method is well suited to a resource with the dip, width and desired production rate of Far West. Stope backfill will be a combination of cemented rock fill (CRF) and unconsolidated waste rock fill, which enables a high recovery of ore, removing the need to leave pillars within the orebody, and also utilising the waste rock. Total Far West UG capital development in FY20 was 2,446m for the period (954m lateral capital development, 1,131m decline development and 361m vertical capital development). Total development for the period was 4,270m (including operating development of 1,824m). Red River has commenced development activities at Liontown, with the intention to commence mining at Liontown in FY23. Project development activities commenced at the Liontown Project during the period of 2020. Red River is focusing on an open pit / UG development for the Liontown Project with a conceptual mine life of 10+ years. During the period of 2020, historic tailings from Liontown were processed at Th ........


Crushing and Grinding
Source: Subscription required

- subscription is required.


Processing

Source: Subscription required

Summary:

- subscription is required.


Production:
During the quarter 2020, approximately 13,000 tonnes of historic gold tailings were reclaimed from the Liontown Project site, trucked to Thalanga Operations and processed through the mill to produce 475 DMT tonnes of gold concentrate grading 62.3 g/t Au, 197 g/t Ag and 12.8% Cu.

CommodityProductUnits20222021202020192018
Copper Concentrate kt  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required1.5
Lead Concentrate kt  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required
Zinc Payable metal M lbs  ......  Subscription required  ......  Subscription required  ......  Subscription required
Zinc Concentrate kt  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required
Gold Concentrate kt  ......  Subscription required
Subscription required - Subscription is required.

Operational Metrics:

Metrics20222021202020192018
Ore tonnes mined  ......  Subscription required  ......  Subscription required  ......  Subscription required383 kt248 kt
Tonnes processed  ......  Subscription required  ......  Subscription required  ......  Subscription required407 kt228 kt
Annual processing capacity  ......  Subscription required  ......  Subscription required  ......  Subscription required650 kt650 kt
Subscription required - Subscription is required.

Reserves at June 30, 2022:

CategoryTonnage CommodityGrade
Probable 437 kt Copper 1.1 %
Probable 437 kt Lead 1.4 %
Probable 437 kt Zinc 4.4 %
Probable 437 kt Gold 0.2 g/t
Probable 437 kt Silver 38 g/t
Probable 437 kt Zinc Equivalent 10.4 %
Total Resource 5,973 kt Copper 0.9 %
Total Resource 5,973 kt Lead 1.8 %
Total Resource 5,973 kt Zinc 6.7 %
Total Resource 5,973 kt Gold 0.9 g/t
Total Resource 5,973 kt Silver 35 g/t
Total Resource 5,973 kt Zinc Equivalent 13.6 %

Commodity Production Costs:

CommodityUnits20222021202020192018
C1 cash costs Zinc USD  ......  Subscription required†  ......  Subscription required†  ......  Subscription required†  ......  Subscription required† 0.55 / lb†  
C2 total cash costs Zinc USD  ......  Subscription required†  ......  Subscription required†  ......  Subscription required†  ......  Subscription required† 0.99 / lb†  
C3 fully allocated costs Zinc USD  ......  Subscription required†  ......  Subscription required†  ......  Subscription required†  ......  Subscription required† 1.23 / lb†  
† Net of By-Product.
Subscription required - Subscription is required.

Financials:

Units20222021202020192018
Revenue M AUD  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required 51.1  
EBITDA M AUD  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required 11.8  
Subscription required - Subscription is required



Heavy Mobile Equipment as of June 24, 2021:
HME TypeModelQuantityLeased or
Contractor
Drill ....................... Subscription required ....................... Subscription required Leased
Drill jumbo (two boom) ....................... Subscription required ....................... Subscription required Leased
Grader ....................... Subscription required ....................... Subscription required Leased
Loader ....................... Subscription required ....................... Subscription required Leased
Truck (haul) ....................... Subscription required ....................... Subscription required Leased
Subscription required - Subscription is required.

Mine Management:

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Feb 10, 2023
....................... Subscription required ....................... Subscription required Subscription required Feb 10, 2023
....................... Subscription required ....................... Subscription required Subscription required Sep 20, 2022
Subscription required - Subscription is required.

Staff:

EmployeesContractorsTotal WorkforceYear
Subscription required Subscription required Subscription required 2022
Subscription required Subscription required Subscription required 2021
Subscription required Subscription required Subscription required 2020

Corporate Filings & Presentations:

DocumentYear
Annual Report 2022
Corporate Presentation 2022
Quarterly Report 2022
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2019
................................... Subscription required 2019
Annual Report 2018
Quarterly Report 2018
Annual Report 2017
Press Release 2017
Press Release 2015
Subscription required - Subscription is required.

Subscription required - Subscription is required.

Terms of Use Privacy Policy © 2017-2023 MDO Data Online Inc.