Overview
Stage | Production |
Mine Type | Underground |
Commodities |
|
Mining Method |
|
Processing |
|
Source:
p. 45,315
Company | Interest | Ownership |
Peabody Energy, Inc.
|
100 %
|
Indirect
|
Peabody Gateway North Mining LLC
(operator)
|
100 %
|
Direct
|
Summary:
Underground mine utilizing continuous miner to extract thermal coal.
The mine operates five days a week, year-round, with three production shifts per day on 2.5 supersection units that extract coal from the Herrin No. 6 seam. The coal goes from the mine via beltline to temporary storage and then travels by overland belt 1.4 miles to the preparation plant.
Source:
Summary:
The preparation plant cleans the coal using heavy media cyclones. After cleaning, it is stored in a 10,000-ton silo and a 100,000-ton above-ground storage and loadout facility before shipping to customers.
Production:
Commodity | Units | 2021 | 2020 | 2019 | 2018 | 2017 | 2016 | 2015 |
Coal (thermal)
|
M tons
| ......  | ......  | ......  | 3.1 | 2.5 | 1.8 | 1.8 |
Heat Content | BTU/lb | | 10,900 | 10,900 | 10,900 | 10,900 | 10,800 | 10,800 |
All production numbers are expressed as clean coal.
- Subscription is required.
Reserves at December 31, 2021:
Category | Tonnage | Commodity |
Proven
|
36 M tons
|
Coal (thermal)
|
Probable
|
5 M tons
|
Coal (thermal)
|
Proven & Probable
|
41 M tons
|
Coal (thermal)
|
Commodity Production Costs:
| Commodity | Units | 2015 |
Cash costs
|
Coal (thermal)
|
USD
|
28.2 / ton
|
Financials:
| Units | 2015 |
Sustaining costs
|
M USD
|
2
|
Growth Capital
|
M USD
|
22.7
|
EBITDA
|
M USD
|
18.4
|
HME Type | Quantity | Ref. Date |
Bolter
|
.......................
|
Jan 15, 2016
|
Continuous Miner
|
.......................
|
Dec 31, 2020
|
Scoop Tram
|
.......................
|
Jan 15, 2016
|
Truck (haul)
|
.......................
|
Jan 15, 2016
|
- Subscription is required.
Corporate Filings & Presentations:
- Subscription is required.
Aerial view:
- Subscription is required.