Centurion (North Goonyella) Mine

Click for more information

Categories

Overview

Mine TypeUnderground
StageRestarting
Commodities
  • Coal (metallurgical)
Mining Method
  • Longwall
  • Continuous
Project Timeline... Lock
Mine Life... Lock
SnapshotThe Centurion mine (formerly known as North Goonyella, renamed in December 2023) was in operation until September 2018, when a fire halted operations in the mine.

In late 2022, Peabody initiated the redevelopment of the Centurion mine. Development coal in April 2024 and sale of product coal targeted for H2 2024 (~100kt). Longwall operations are expected to commence in 2026. As of December 31, 2023, all required licenses and permits are in place for all activities for the operation of Centurion.

Centurion Mine will extract coal from the Goonyella Middle seam with future plans to extend into the Goonyella Lower B2 (GLB2) seam. Centurion Coking coal is a premium Hard Coking Coal (PHCC).
Latest NewsPeabody celebrates first Centurion shipment     December 18, 2024

Owners

SourceSource
CompanyInterestOwnership
Peabody Energy, Inc. 100 % Indirect
The Centurion Mine is owned by Centurion Coal Mining Pty Ltd.

Centurion Coal Mining Pty Ltd. is a wholly owned subsidiary of Peabody Energy Australia Pty Ltd. with the overall parent company being Peabody Energy Corporation.

Contractors

Lock

- subscription is required.

Deposit type

  • Sedimentary

Summary:

The Centurion Mine lies on the Collinsville Shelf on the western margin of the Bowen Basin in Central Queensland. The regional stratigraphy of the area comprises the Permian Blackwater Group which comprises three coal bearing sequences, the Moranbah Coal Measures (MCM), the Fort Cooper Coal Measures (FCCM), and the Rangal Coal Measures (RCM, it also contains the Triassic Group sediments (Rewan and Clematis) and Tertiary sequences. The Centurion Mine lease covers the subcrops of the Moranbah and Fort Cooper Coal Measure sequences. The Permian strata were overlain by Triassic Rewan Group and Clematis Group sediments, however in the Centurion area the Triassic sediments have all been removed and a large unconformity exists between the Permian and Tertiary sediments. The main seams of economic interest are the Goonyella Middle and Goonyella Lower B2.

The coal seams of interest (GM and GLB2 seams) occur within the Permian Moranbah Coal Measures in a structurally complex zone on the Collinsville Shelf in the northern Bowen Basin in central Queensland, Australia. The stratigraphy gently dips between 4 and 5 degrees towards the northeast and the GM seam averages 6.1m thick. The GM and GLB2 seams are considered medium volatile bituminous by the ASTM Classification of Coal.

The Moranbah coal measures occur within a cyclic fluviatile clastic depositional system, that consists of regular fining up sequences of lithic sandstones, siltstones, and mudstones to coal, then coarsening up sequences in the opposite manner.

The coal deposit type of the Centurion mine is considered to have a moderate geologic complexity based on the following factors:
• The Goonyella Middle and Goonyella Lower B2 seams are laterally continuous and can be correlated across the property with the use of geophysical logs, interburden thicknesses, and seam thicknesses.
• The seams are gently dipping with some seam splitting experienced within the Goonyella Lower seams.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

CommodityUnits2018201720162015Avg. AnnualLOM
Coal (hard coking) Mt 1.33.11.22.43.518
Sulfur%12700127001270012700
All production numbers are expressed as clean coal.

Operational metrics

Metrics
ROM coal, LOM  ....  Subscribe
Hourly processing capacity  ....  Subscribe
Annual mining rate  ....  Subscribe
* According to 2023 study.

Production Costs

CommodityUnitsAverage
Cash costs Coal (hard coking) USD
Assumed price Coal (hard coking) USD  ....  Subscribe
* According to 2023 study / presentation.

Operating Costs

CurrencyAverage
Total operating costs ($/t processed) USD  ....  Subscribe
* According to 2023 study.

Project Costs

MetricsUnitsLOM Total
Total CapEx $M USD  ......  Subscribe
After-tax NPV @ 11% $M USD  ......  Subscribe

Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Mar 7, 2024
....................... Subscription required ....................... Subscription required Subscription required Mar 7, 2024
....................... Subscription required ....................... Subscription required Subscription required Mar 7, 2024
....................... Subscription required ....................... Subscription required Subscription required Mar 7, 2024
....................... Subscription required ....................... Subscription required Subscription required Mar 7, 2024

EmployeesYear
...... Subscription required 2023
...... Subscription required 2018

Aerial view:

Lock

- subscription is required.