Mining Intelligence and Sales Leads
Canada

Foster Creek Mine

Click for more information

Categories

Summary

Mine TypeIn-Situ
StatusActive
Commodities
  • Bitumen
Mining Method
  • Steam-assisted gravity drainage (SAGD)
Production Start... Lock
SnapshotThe Foster Creek project is a long-established in-situ oil sands development.

The property produces bitumen using steam-assisted gravity drainage (SAGD) technology.

Foster Creek was among the first large-scale commercial SAGD projects in Canada and has been developed in a phased and modular manner, allowing for continuous operational optimization and expansion.

The Foster Creek Optimization project was completed ahead of schedule in late November 2025, with four new steam generators, water treatment and de-oiling units, and new well pads brought online.

Owners

SourceSource
CompanyInterestOwnership
Cenovus Energy Inc. (operator) 100 % Indirect
Foster Creek leases and facilities is 100% owned and operated by Cenovus Energy Inc.

Deposit type

  • Sedimentary
  • Sandstone hosted

Summary:

Foster Creek produces from the McMurray formation, with a reservoir depth of up to 550 metres.

The McMurray Formation is a succession of sands and shale deposited in a fluvial estuarine environment that developed in a major valley that was cut into Devonian-aged limestone. Sands were deposited in tide-influenced channels and the McMurray Formation is variably saturated with water, bitumen and natural gas. Bitumen from the McMurray Formation has an average API gravity of approximately 8 degrees.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Fleet data has not been reported.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Commodity Production

Annual Bitumen production is eatimated based on daily production: 196.0 Mbbls/d (2024), 186.3 Mbbls/d (2023), 191.0 Mbbls/d (2022), 179.9 Mbbls/d (2021), 163.2 Mbbls/d (2020).
CommodityUnits20242023202220212020
Bitumen k barrels  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe

Production Costs

CommodityUnits2024202320222021
Operating margin Bitumen CAD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe

Mine Financials

Units20242023202220212020
Revenue M CAD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Sales margin M CAD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Jan 21, 2026
....................... Subscription required ....................... Subscription required Subscription required Jan 21, 2026
....................... Subscription required ....................... Subscription required Subscription required Jan 22, 2026
....................... Subscription required ....................... Subscription required Subscription required Jan 22, 2026
....................... Subscription required ....................... Subscription required Subscription required Jan 21, 2026
....................... Subscription required ....................... Subscription required Subscription required Jan 22, 2026
....................... Subscription required ....................... Subscription required Subscription required Jan 21, 2026
....................... Subscription required ....................... Subscription required Subscription required Jan 21, 2026

Workforce

Aerial view:

Lock

- subscription is required.