• Data Access
  • Your Email  
  • Your Email  
Keep me signed in.
Forgot your password?
Close
  • Forgot Your Password?
  • Enter the email you signed up with and we'll email it to you.
  • Your Email  
Close
Back
MDO
Mining Data Solutions
  • Home
  • Database
  • Subscribe
  • Sign In
  • Sign In
China
Songjiagou Operation (Songjiagou Mine, Songjiagou North Mine)

This page is not tailored to
devices with screen width under 750 px.
 Location:
37 km S from Yantai, China

  Address:
Qiansongjiao Village, Wanggezhuang Town, Muping District
Yantai City, Shandong Province
China
264106
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in China
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Costs & Financials
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StageProduction
Mine TypeOpen Pit & Underground
Commodities
  • Gold
Mining Method
  • Truck & Shovel / Loader
  • Blast Hole Stoping
  • Shrinkage stoping
  • Backfill
Production Start...


Owners

Source: p. 4
CompanyInterestOwnership
Yantai Dahedong Processing Co. Ltd. (operator) 25 % Indirect
Majestic Gold Corp. 75 % Indirect
Majestic holds its 75% interest in SJG Project through its 94% owned subsidiary SINOGOLD Resources Holdings Group Co. Ltd. (“SINOGOLD”) indirectly. The remaining 25% of SJG Project is held by Yantai Dahedong Processing Co. Ltd.

Contractors

Subscription required - Subscription is required.


Deposit Type

  • Vein / narrow vein
  • Breccia pipe / Stockwork
  • Mesothermal


Summary:

The eastern Shandong (“Jiaodong”) gold district is divided from west to east into the Zhaoyuan- Yexian, Qixia, and Muping-Rushan gold belts. The Songjiagou Property is located within the MupingRushan gold belt situated in the eastern part of the Jiaobei Terrane, which contains about 20% of the gold reserves of the Shandong Peninsula. Gold mineralization is characterized as either vein-filling or as disseminated structures/stockwork.

Project area. A ductile shear zone and ductile brittle fault zone are major geological structures in the area. Major magmatic activity is represented by monzonite granite. Other veins include diabase, diorite, hornblende porphyrite, and lamprophyre.

Palaeoproterozoic metamorphic rocks of the Jingshan Group are mainly distributed to the north of the Project area near Tanjia village, and are comprised of biotite granulite, graphite-bearing gneiss, leucogranulite, and marble. These strata generally dip southeast with angles varying from 15° to 50°.

Cretaceous-age rocks are predominately represented by the Lisishan Formation, part of the Laiyang Group and comprised of conglomerate and sandstone. The Lisishan Formation in the Project area has an overall northeast strike and dips southeast with an angle of 20° to 40°. The formation is dividable into two conformably contacted sections according to the clast size. The first section of Lisishan Formation consists of relatively larger clasts with grain sizes of about 3 cm – ........


Mining Methods

  • Truck & Shovel / Loader
  • Blast Hole Stoping
  • Shrinkage stoping
  • Backfill


Summary:

Open pit
Mining inventory is loaded by excavator and then transported to the processing plant by truck.

In order to effectively control the grade and match excavator capacities, block sizes in the resource model were set at 10 m × 10 m × 5 m. Two benches were combined into one during optimization, and the final bench heihgt is 10 m.

Underground
The Songjiagou underground mine is situated approximately 405 metres northeast of the Company’s existing open pit operation. The formed concrete portal entrance provides access to a spiral ramp whose dimensions are 4.5 × 4.0 metres at a slope gradient ranging from 10-15% with the exception of curved portions which are slopped at 5% for safety reasons.

The ramp is sized to facilitate the use of trackless mining equipment including ore haulage to the surface process plant. The ramp was collared at an elevation of 80 meters a.s.l (above sea level) and is designed to achieve a total length of 2,075 meters in the first phase of development.

Underground mining operations are highly mechanized and include high efficiency, rapid- penetrating, hydraulic jumbo drills for development work, rotary drilling equipment employing extension steel for inclined medium and longer holes, 20 tonne dump trucks for ore haulage to surface via the ramp, and electric scrapers to facilitate ore recovery and loading in work areas.

The Company employs a mix of mining methods which are based on mini ........


Crushing and Grinding
Source: Subscription required

- subscription is required.


Processing

Flow Sheet: Subscription required

Summary:

- subscription is required.


Production:

CommodityUnits2021202020192018
Gold oz  ......  Subscription required  ......  Subscription required  ......  Subscription required29,160
All production numbers are expressed as metal in concentrate.
Subscription required - Subscription is required.

Operational Metrics:

Metrics2021202020192018
Ore tonnes mined  ......  Subscription required  ......  Subscription required1,504,425 t1,420,620 t
Tonnes milled  ......  Subscription required  ......  Subscription required1,316,343 t1,471,565 t
Daily milling capacity  ......  Subscription required  ......  Subscription required7,400 t
Subscription required - Subscription is required.

Reserves at January 19, 2016:
Open pit: cut-off grade is 0.30 g/t Au.
Underground: cut-off 0.80 g/t Au.

CategoryOreTypeTonnage CommodityGrade
Indicated In-Situ (OP) 26.6 Mt Gold 1.4 g/t
Inferred In-Situ (OP) 23.4 Mt Gold 1.45 g/t
Inferred In-Situ (UG) 5.6 Mt Gold 2.6 g/t

Commodity Production Costs:

CommodityUnits2021202020192018
Total cash costs (sold) Gold USD  ......  Subscription required  ......  Subscription required  ......  Subscription required 651 / oz  
All-in sustaining costs (sold) Gold USD  ......  Subscription required  ......  Subscription required  ......  Subscription required 774 / oz  
Subscription required - Subscription is required.

Financials:

Units2021202020192018
Sustaining costs M USD  ......  Subscription required  ......  Subscription required  ......  Subscription required 0.2  
Capital expenditures M USD  ......  Subscription required  ......  Subscription required  ......  Subscription required 14.5  
Revenue M USD  ......  Subscription required  ......  Subscription required  ......  Subscription required 33.8  
Gross profit M USD  ......  Subscription required  ......  Subscription required  ......  Subscription required 13  
Pre-tax Income M USD  ......  Subscription required  ......  Subscription required 10.9  
After-tax Income M USD  ......  Subscription required  ......  Subscription required  ......  Subscription required 6.9  
EBITDA M USD  ......  Subscription required  ......  Subscription required  ......  Subscription required 14.2  
Subscription required - Subscription is required



Heavy Mobile Equipment:

Subscription required - Subscription is required.


Corporate Filings & Presentations:

DocumentYear
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2020
................................... Subscription required 2020
Financial Review 2018
Financial Review 2017
Technical Report 2016
Subscription required - Subscription is required.

Subscription required - Subscription is required.

Terms of Use Privacy Policy © 2017-2023 MDO Data Online Inc.