Blue Creek Project

This page is not tailored to
devices with screen width under 750 px.
 Location:
36 km NW from Brookwood, Alabama, United States

  Project Contacts:
16243 Highway 216
Brookwood
Alabama, United States
35444
Phone  ...  Subscription required
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in United States
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Costs & Financials
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StageConstruction
Mine TypeUnderground
Commodities
  • Coal (metallurgical)
Mining Method
  • Longwall
  • Continuous
Mine Life50 years (as of Jan 1, 2020)
Blue Creek is one of the last remaining large-scale untapped premium High Vol A met coal mines in the U.S.


Owners & OPERATOR

Source:
CompanyInterestOwnership
Frontier-Kemper Constructors, Inc. (operator)
Warrior Met Coal Inc. 100 % Indirect
Frontier-Kemper Constructors has been awarded a contract valued at approximately $63.7 million by Warrior Met Coal for the Blue Creek Energy Mine No. 1 project in Tuscaloosa County, Alabama, USA. The scope of work includes the excavation and construction of the mine shaft, mine slope, slope hoist and service hoist.

Deposit Type

  • Sedimentary


Summary:

The project targets the Mary Lee coal seam which has an average thickness of 5.2m.

Blue Creek mine will produce a premium High Vol A met coal that is characterized by lowsulfur and high coke strength after reaction (CSR).

The ash content of the coal is 9.10%, while the sulphur content is as low as 0.70%.

Blue Creek mine contains approximately 103.0 million metric tons of recoverable reserves. The recoverable reserves can be increased to over 170 million metric tons by acquiring adjacent reserves as well.


Mining Methods

  • Longwall
  • Continuous


Summary:

The Blue Creek development will be a single longwall mine and is expected to have the capacity to produce an average of 4.3 million short tons per annum of premium High-Vol A met coal over the first ten years of production. It is one of the last remaining large-scale untapped premium High Vol A met coal mines in the U.S.

Blue Creek is expected to have a mine life of approximately 50 years assuming a single longwall operation.

Based on the current schedule, Warrior expects first development tons from continuous miner units to occur in the third quarter of 2023 with the longwall scheduled to start up in the second quarter of 2025.


Crushing and Grinding


Processing


Summary:

The coal will be cleaned at the coal preparation plant.


Projected Production:

CommodityUnitsAvg. Annual
Coal (metallurgical) M tons 4.3
All production numbers are expressed as clean coal.


Reserves at December 31, 2019:

CategoryTonnage Commodity
Proven 64,309 kt Coal (metallurgical)
Probable 38,733 kt Coal (metallurgical)
Proven & Probable 103,042 kt Coal (metallurgical)

Commodity Production Costs:

CommodityUnitsAverage
All-in costs Coal (metallurgical) USD  ......  Subscription required *
Assumed price Coal (metallurgical) USD  ......  Subscription required *
* According to 2020 study / presentation.
Subscription required - Subscription is required.

2020 Study Costs and Valuation Metrics :

MetricsUnitsLOM Total
Initial CapEx $M USD  ......  Subscription required
Equipment leasing costs $M USD  ......  Subscription required
After-tax NPV @ 10% $M USD  ......  Subscription required
After-tax IRR, %  ......  Subscription required
After-tax payback period, years  ......  Subscription required
Subscription required - Subscription is required.

Heavy Mobile Equipment:

Mine Management:

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Nov 10, 2020
Subscription required - Subscription is required.


Corporate Filings & Presentations:

DocumentYear
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2019
Subscription required - Subscription is required.

Subscription required - Subscription is required.

Terms of Use Privacy Policy © 2020 MDO Data Online Inc.