Overview
Stage | Production |
Mine Type | Open Pit |
Commodities |
|
Mining Method |
|
Mine Life | 10.5 years (as of Jan 1, 2020) |
The mine is focused on the resuscitation of its underground operations which will bring consistency and stability to the ore grades as the mine’s resources are primarily underground. |
Source:
p. 4
On 1 June 2017, the Group through its wholly owned subsidiary, RioGold (Private) Limited acquired 100% of the voting shares of Palatial Gold Investments (Private) Limited an unlisted company which owns Dalny Mine Complex, a mining operation based in Chakari mining area, in the province of Mashonaland West, Zimbabwe.
Contractors
- Subscription is required.
Summary:
Dalny currently relies on near the surface open pitable ores which have lower grades that culminate in low production volumes. The medium to long term plan for the Mine is to complete the dewatering and resuscitation of its underground shafts in order to access the higher grade ore that is deposited underground.
Production:
Commodity | Units | 2021 | 2020 | 2019 | 2018 |
Gold
|
kg
| ......  | ......  | ......  | 442 |
- Subscription is required.
Reserves at December 31, 2020:
Category | Tonnage | Commodity | Grade | Contained Metal |
Proven
|
237,454 t
|
Gold
|
4.94 g/t
|
1,173 kg
|
Probable
|
274,328 t
|
Gold
|
4.65 g/t
|
1,276 kg
|
Proven & Probable
|
511,782 t
|
Gold
|
4.78 g/t
|
2,449 kg
|
Measured
|
641,715 t
|
Gold
|
7.2 g/t
|
4,620 kg
|
Indicated
|
1,006,656 t
|
Gold
|
4.59 g/t
|
4,625 kg
|
Inferred
|
531,481 t
|
Gold
|
3.7 g/t
|
1,967 kg
|
- Subscription is required.