• Data Access
  • Your Email  
  • Your Email  
Keep me signed in.
Forgot your password?
Close
  • Forgot Your Password?
  • Enter the email you signed up with and we'll email it to you.
  • Your Email  
Close
Back
MDO
Mining Data Solutions
  • Home
  • Database
  • Subscribe
  • Sign In
  • Sign In
Tanzania
Singida Project

This page is not tailored to
devices with screen width under 750 px.
 Location:
55 km SE from Singida, Tanzania

  Project Contacts:
202, 2nd Floor, Renaissance Plaza, Plot No. 498, Haile Selassie Road
Masaki
Tanzania
Phone  ...  Subscription required
Fax+255-22-2925151
EmailEmail
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in Tanzania
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Costs & Financials
  • Fleet
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StageConstruction
Mine TypeOpen Pit
Commodities
  • Gold
Mining Method
  • Truck & Shovel / Loader
Production Start...
Mine Life7 years (as of Jan 1, 2021)


Owners

Source:
CompanyInterestOwnership
Shanta Gold Ltd. 100 % Indirect
One of the mining licences is wholly owned by Shanta Mining Company Ltd (SMCL); a portion of another is owned 90% by Shanta with the balance held in a Joint Venture with GL Jossue & JB Joel Limited. The third licence is held by the Joint Venture in the same proportion.

Ownership of the prospecting licences is 100% with Shanta Mining.

Contractors

Subscription required - Subscription is required.


Deposit Type

  • Metamorphic


Summary:

The geology of the Singida area is dominated by the Tanzanian granite-gneiss craton. Poorly exposed greenstone remnants were identified within the granite gneiss terrain during mapping by the Geological Survey of Tanzania (Haidutov 1976). These greenstones comprise an intercalated sedimentary and volcanic sequence with similarities to the Nyanzian Supergroup (System) of the Lake Victoria Goldfields.

The volcanic rocks encountered are predominantly basaltic lava and localised hypabyssal diorite/microdiorite intrusives. Meta-sedimentary rocks consist mainly of metaquartzitic lithologies, with subordinate siltstones, mudstones and banded ferruginous chert also encountered. The orientation of the layering is generally parallel to the basement foliation. Isoclinal folding is also evident.

The Nyanzian lithologies are generally metamorphosed to greenschist- and lower-amphibolite facies with localised occurrences of upper amphibolite grade. Post tectonic granite intrusives are common throughout the area.

Gold mineralisation is associated with penetrative brittle-ductile, steeply dipping, quartz veined shear zones that generally approximate the strike of lithological contacts.

The area south of Singida is exceptionally flat lying with little relief except for the granite intrusives that form prominent tors. Weathered overburden profiles are dominated by Neogene transported pedogenic gravels and related soils. Black Cotton soils (Mbuga) occu ........


Mining Methods

  • Truck & Shovel / Loader


Summary:

Mining activities at Singida will utilize conventional open-pit mining methods.


Crushing and Grinding
Source: Subscription required


Processing

Source: Subscription required

Summary:

- subscription is required.


Projected Production:

CommodityUnitsAvg. AnnualLOM
Gold oz 32,000221,000

Operational Metrics:

Metrics
Daily milling rate  ......  Subscription required
Stripping / waste ratio  ......  Subscription required
Ore tonnes mined, LOM  ......  Subscription required
Total tonnes mined, LOM  ......  Subscription required
Tonnes milled, LOM  ......  Subscription required
Plant annual capacity  ......  Subscription required
* According to 2020 study.
Subscription required - Subscription is required.

Reserves at May 26, 2020:
Probable reserves Cut-off grade is 0.75 g/t Au.

CategoryTonnage CommodityGradeContained Metal
Probable 2,514 kt Gold 3 g/t 243 koz
Measured 1,632 kt Gold 3.39 g/t 179 koz
Indicated 4,024 kt Gold 2.36 g/t 305 koz
Inferred 6,150 kt Gold 2.12 g/t 418 koz
Total Resource 11,806 kt Gold 2.38 g/t 904 koz

Commodity Production Costs:

CommodityUnitsAverage
Total cash costs Gold USD  ......  Subscription required&nbs
All-in sustaining costs (AISC) Gold USD  ......  Subscription required&nbs
Assumed price Gold USD  ......  Subscription required&nbs
* According to 2020 study / presentation.
Subscription required - Subscription is required.

Operating Costs:

Units2020
OP mining costs ($/t milled) USD 38 *
Processing costs ($/t milled) USD  ......  Subscription required
G&A ($/t milled) USD  ......  Subscription required
Total operating costs ($/t milled) USD  ......  Subscription required
* According to 2020 study.
Subscription required - Subscription is required.

2020 Study Costs and Valuation Metrics :

MetricsUnitsLOM Total
Pre-Production capital costs $M USD  ......  Subscription required
Sustaining CapEx $M USD  ......  Subscription required
Total CapEx $M USD  ......  Subscription required
OP OpEx $M USD  ......  Subscription required
Processing OpEx $M USD 49
G&A costs $M USD 14
Total OpEx $M USD  ......  Subscription required
Royalty payments $M USD  ......  Subscription required
Gross revenue (LOM) $M USD  ......  Subscription required
EBITDA (LOM) $M USD  ......  Subscription required
Pre-tax Cash Flow (LOM) $M USD  ......  Subscription required
After-tax Cash Flow (LOM) $M USD  ......  Subscription required
After-tax NPV @ 8% $M USD  ......  Subscription required
After-tax IRR, %  ......  Subscription required
After-tax payback period, years  ......  Subscription required
Subscription required - Subscription is required.


Proposed Heavy Mobile Equipment as of December 2, 2020:
HME TypeModel
Bulldozer ....................... Subscription required
....................... Subscription required ....................... Subscription required
....................... Subscription required ....................... Subscription required
....................... Subscription required ....................... Subscription required
....................... Subscription required ....................... Subscription required
....................... Subscription required ....................... Subscription required
Subscription required - Subscription is required.

Mine Management:

Job TitleNamePhoneProfileRef. Date
....................... Subscription required ....................... Subscription required ....................... Subscription required Subscription required Nov 16, 2022
....................... Subscription required ....................... Subscription required Subscription required Nov 16, 2022
....................... Subscription required ....................... Subscription required Subscription required Nov 16, 2022
Subscription required - Subscription is required.

Staff:

EmployeesYear
Subscription required 2020

Corporate Filings & Presentations:

DocumentYear
Corporate Presentation 2022
Corporate Presentation 2022
Half-year Report 2022
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2020
Feasibility Study Report 2018
Subscription required - Subscription is required.

Subscription required - Subscription is required.

Terms of Use Privacy Policy © 2017-2023 MDO Data Online Inc.