Vickery Extension Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusActive
Commodities
  • Coal (metallurgical)
  • Coal (thermal)
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotThe Gunnedah open-cut mines consist of Tarrawonga, Werris Creek, and Vickery.

The first production from the Vickery Extension project commenced in Q4 FY24 with ramping up in FY25. At full ramp-up, early mining Vickery is expected to produce ~ 1.2-1.3 Mtpa.

Direct haulage of coal from Vickery to the Gunnedah CHPP is a part of the early mining activities.

Feasibility works are ongoing for the full-scale project.

In FY25, Whitehaven Coal will commence construction of a water pipeline connecting the Tarrawonga and Vickery mines.

Owners

SourceSource
CompanyInterestOwnership
Whitehaven Coal Ltd. 100 % Indirect
Vickery Extension project is owned by Vickery Coal Pty Ltd, a subsidiary of Whitehaven Coal Ltd.

Contractors

Lock

- subscription is required.

Deposit type

  • Sedimentary

Summary:

The Vickery Extension Project is located within the Gunnedah Basin, which contains sedimentary rocks, including coal measures, of Permian and Triassic age.

Stratiform bituminous coal deposit of Cisuralian (early Permian) age. Gently folded multiple coal seams, with dips generally less than 10°. Regional dip generally to the southeast. Deposit intersected by 5 major normal faults, and 7 smaller normal faults Igneous intrusions are present and affected areas are excluded from the resource determination process.

Regionally, there are two coal-bearing sequences in the Gunnedah Basin, namely:
-Early Permian Bellata Group (comprising the Maules Creek sub-basin and Mullaley sub-basin, separated by the Boggabri Ridge);
-Late Permian Black Jack Group.

The Project coal resource is located within the Maules Creek sub-basin of the Early Permian Bellata Group. The target coal seams are contained within the Maules Creek Formation. The Maules Creek Formation is the primary coal bearing unit and consists of conglomerate, coal, lithic sandstone and mudstones.

Below the Maules Creek Formation are the Goonbri and Leard Formations, which are basal units of the Gunnedah Basin sedimentary sequence and unconformably overlie the Boggabri Volcanics. The Goonbri Formation typically contains pyritic sandstone, siltstone and inferior coal seams.

Project area, including the target coal seams within the open cut extent, as follows:
- Tralee Seam;
- Gundawarra Seam;
- Welkeree Seam;
- Kurrumbede Seam;
- Shannon Harbour Seam (upper and lower seams);
- Stratford Seam (upper and lower seams);
- Bluevale Seam (upper and lower seams); and
- Cranleigh Seam (upper, middle and lower seams).

Individual coal seams range in thickness from approximately 0.5 m to greater than 3 m.

Two major fault structures are located within the Project region, namely the Boggabri Thrust (to the west of the Project) and the Mooki Thrust (to the east of the Project). There are also a number of minor faults across the Project mining area.

Dimensions
The extent of the potential Vickery open cut resource area is about 10 km northsouth by 6 km west-east, from the base of weathering (about 30 m below surface) to a maximum depth of 300 m. The potential underground resource area is about 10 km north-south by 5 km west-east, to a maximum depth of 600 m.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

Early mining at Vickery commenced in the June quarter of 2024 with ROM production of 0.1Mt, which will continue to ramp up through FY25.
CommodityUnits2024
Coal (metallurgical & thermal) bcm  ....  Subscribe
All production numbers are expressed as ROM coal. ^ Guidance / Forecast.

Operational metrics

Metrics20242023
Coal tonnes mined  ....  Subscribe
Waste  ....  Subscribe  ....  Subscribe
Reject  ....  Subscribe  ....  Subscribe
^ Guidance / Forecast.

Production Costs

Commodity production costs have not been reported.

Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNamePhoneProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Oct 2, 2024
....................... Subscription required ....................... Subscription required ........... Subscription required Subscription required Oct 2, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 8, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 2, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 2, 2024

Total WorkforceYear
...... Subscription required 2019

Aerial view:

Lock

- subscription is required.