• Data Access
  • Your Email  
  • Your Email  
Keep me signed in.
Forgot your password?
Close
  • Forgot Your Password?
  • Enter the email you signed up with and we'll email it to you.
  • Your Email  
Close
Back
MDO
Mining Data Solutions
  • Home
  • Database
  • Subscribe
  • Sign In
  • Sign In
South Africa
Kangala Colliery Mine

This page is not tailored to
devices with screen width under 750 px.
 Location:
5 km S from Delmas, South Africa

  Address:
467 Muckleneuk St, Brooklyn
Pretoria
South Africa
0181
Fax+27 10 900 2082
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in South Africa
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Production
  • Reserves
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StageProduction
Mine TypeOpen Pit
Commodities
  • Coal (thermal)
Mining Method
  • Truck & Shovel / Loader
Mine Life1 years (as of Jan 1, 2019)
Current LoM 1 year with the potential to exceed 20 years when including the Eloff Project and Middelbult extensions.


Owners & OPERATOR

Source:
CompanyInterestOwnership
Universal Coal and Energy Holdings South Africa (Pty) Ltd (operator) 70.5 % Direct
Universal Coal operates 70.5% of the project while BEE (Black Economic Empowerment) partner Mountain Rush owns the remaining 29.5%.

Deposit Type

  • Sedimentary


Summary:

According to the geology excerpt from the Eloff MWP (Exxaro Coal Central, 2016), the region consists of the following pre-Karoo lithologies, i.e. granite basement rocks of Archean age, quartzite of the Witwatersrand Supergroup, lava of the Ventersdorp Supergroup, dolomite (Malmani Subgroup), chert, quartzite and shale from the Pretoria Group (Transvaal Supergroup). These are overlain in places by the Karoo Supergroup which consists of diamictite (tillite) of the Dwyka Group followed by sandstone, shale, mudstone and coal of the Vryheid Formation.

Local geology of the project area, indicating that the site is underlain by lithologies of the Vryheid Formation (Ecca Group), localized dolerite intrusions and younger alluvium. The Vryheid Formation consists of beds of soft, dark grey sandy shale, which alternates with thick beds of yellow to white cross-bedded sandstone and grit with a few coal seams.


Mining Methods

  • Truck & Shovel / Loader


Summary:


Crushing and Grinding


Processing



Production:

CommodityProductUnits202020192018
Coal (thermal) Clean coal kt  ......  Subscription required  ......  Subscription required  ......  Subscription required
Coal (thermal) ROM coal kt  ......  Subscription required  ......  Subscription required  ......  Subscription required
Subscription required - Subscription is required.


Reserves at December 1, 2019:

CategoryTonnage Commodity
Proven 28,296 kt Coal (thermal)
Measured 51.33 Mt Coal (thermal)
Indicated 15.03 Mt Coal (thermal)
Inferred 32.33 Mt Coal (thermal)


Heavy Mobile Equipment:

Mine Management:

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Mar 18, 2020
Subscription required - Subscription is required.

Staff:

EmployeesYear
Subscription required 2019

Corporate Filings & Presentations:

DocumentYear
................................... Subscription required 2020
................................... Subscription required 2019
................................... Subscription required 2018
Subscription required - Subscription is required.

Aerial view:

Subscription required - Subscription is required.

Terms of Use Privacy Policy © 2020 MDO Data Online Inc.