Tanzania
Lindi Jumbo Project

This page is not tailored to
devices with screen width under 750 px.
 Location:
85 W from Lindi, Tanzania

  Project Contacts:
3rd Floor, Capetown Fish Market, Building Plot No 179/180. Block "B" Msasani Village, Kinondoni
Dar es Salaam
Tanzania
EmailEmail
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in Tanzania
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Costs & Financials
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StageConstruction
Mine TypeOpen Pit
Commodities
  • Graphite
Mining Method
  • Truck & Shovel / Loader
Production Start...
Mine Life24 years (as of Jan 1, 2019)
Construction of the Lindi Jumbo graphite mine in Tanzania has been ongoing since first mobilisation in late 2021.
Latest NewsWalkabout Resources announces reduction in EPC commitments     February 24, 2023


Owners

Source: p. 6,42
CompanyInterestOwnership
Walkabout Resources Ltd. 100 % Indirect

Contractors

Subscription required - Subscription is required.


Deposit Type

  • Metamorphic


Summary:

The project area is situated in the Usagaran of the Mozambique belt and consists of graphitic gneisses and schists interpreted to occur along the flanks of various anti- and synforms in the area with the lithological units dipping at between 15 and 50 degrees to the NW and SE.


Mining Methods

  • Truck & Shovel / Loader


Summary:

Weathered ore and waste will be excavated using a hydraulic shovel and loaded onto dump trucks for hauling out of the pit. Fresh ore and waste will be drilled and blasted before being loaded and hauled in a similar manner.

In order to achieve a high-grade feed to the mill, three discrete ore streams are mined, a low-grade stream (0% to 10% TGC material), a medium grade stream (10% to 20% TGC material) and a high-grade stream (+20% TGC ore). The low-grade material with a grade of around 6% TGC is stockpiled alongside the pit and not transported to the mill. This ore can be available for later treatment, blending or be sold to other parties.


Crushing and Grinding


Processing

Flow Sheet: Subscription required

Summary:

- subscription is required.


Projected Production:

CommodityUnitsAvg. Annual
Graphite kt 40
All production numbers are expressed as concentrate.

Operational Metrics:

Metrics
Annual milling rate 230 kt *
* According to 2019 study.

Reserves at March 7, 2019:
A cut-off of 10% TGC has been used for the Mineral Resource estimate.

CategoryTonnage CommodityGradeContained Graphite
Proven 2.54 Mt Graphite 19.3 % 489,000 t
Probable 2.97 Mt Graphite 16.7 % 498,000 t
Proven & Probable 5.51 Mt Graphite 17.9 % 987,000 t
Measured 6.5 Mt Graphite 12.1 % 781,800 t
Indicated 8.4 Mt Graphite 10.5 % 887,300 t
Inferred 26.9 Mt Graphite 10.5 % 2,837,600 t
Total Resource 41.8 Mt Graphite 10.8 % 4,506,700 t

Commodity Production Costs:

CommodityUnitsAverage
Site cash costs (produced) Graphite USD  ......  Subscription required&nbs
Cash costs Graphite USD  ......  Subscription required&nbs
Assumed price Graphite USD  ......  Subscription required&nbs
* According to 2019 study / presentation.

2019 Study Costs and Valuation Metrics :

MetricsUnitsLOM Total
Pre-Production capital costs $M USD  ......  Subscription required
Total CapEx $M USD  ......  Subscription required
Total OpEx $M USD  ......  Subscription required
Gross revenue (LOM) $M USD  ......  Subscription required
Operating margin, %  ......  Subscription required
EBITDA (LOM) $M USD  ......  Subscription required
Pre-tax NPV @ 10% $M USD  ......  Subscription required
After-tax NPV @ 10% $M USD  ......  Subscription required
Pre-tax IRR, %  ......  Subscription required
After-tax IRR, %  ......  Subscription required
After-tax payback period, years  ......  Subscription required
Subscription required - Subscription is required.


Heavy Mobile Equipment:

Mine Management:

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Oct 19, 2022
....................... Subscription required ....................... Subscription required Subscription required Dec 7, 2022
Subscription required - Subscription is required.

Staff:

Total WorkforceYear
Subscription required 2019

Corporate Filings & Presentations:

DocumentYear
Annual Report 2022
Corporate Presentation 2022
................................... Subscription required 2021
................................... Subscription required 2019
................................... Subscription required 2019
Feasibility Study Report 2017
Subscription required - Subscription is required.

News:

NewsDate
Walkabout Resources announces reduction in EPC commitments February 24, 2023