Overview
Stage | Feasibility |
Mine Type | Open Pit |
Commodities |
|
Mining Method |
|
Processing |
|
Mine Life | 24 years (as of Jan 1, 2019) |
Summary:
The project area is situated in the Usagaran of the Mozambique belt and consists of graphitic gneisses and schists interpreted to occur along the flanks of various anti- and synforms in the area with the lithological units dipping at between 15 and 50 degrees to the NW and SE.
Summary:
Weathered ore and waste will be excavated using a hydraulic shovel and loaded onto dump trucks for hauling out of the pit. Fresh ore and waste will be drilled and blasted before being loaded and hauled in a similar manner.
In order to achieve a high-gradefeed to the mill, three discrete ore streams are mined, a low-grade stream (0% to 10% TGC material), a medium grade stream (10% to 20% TGC material) and a high grade stream (+20% TGC ore). The low-grade material with a grade of around 6% TGC is stockpiled alongside the pit and not transported to the mill. This ore can be available for later treatment, blending or be sold to other parties.
Flow Sheet:
Summary:
The proposed flowsheet consists of the following primary activities:
- ROM Bin and Apron Feeder
- Crushing - a primary jaw crusher and secondary cone crusher.
- Drum Scrubber with Trommel Screen (Trommel Screen Oversize to Secondary Crushing)
- Milling – a primary rod mill.
- Sequential Rougher/Scavenger Flotation
- Regrind cleaner flotation – four stages of concentrate attrition regrinding and cleaner flotation.
- Filtration and concentrate drying.
- Screening of final product concentrate.
- Bagging of concentrate.
Recoveries & Grades:
Commodity | Parameter | Avg. LOM |
Graphite
|
Head Grade, %
| 17.9 |
Graphite
|
Concentrate Grade, %
| ......  |
- Subscription is required.
Projected Production:
Commodity | Units | Avg. Annual |
Graphite
|
kt
| 40 |
All production numbers are expressed as concentrate.
Operational Metrics:
Metrics | |
Annual milling rate
| ......  |
* According to 2019 study.
- Subscription is required.
Reserves at March 7, 2019:
Category | Tonnage | Commodity | Grade | Contained Graphite |
Proven
|
2.54 Mt
|
Graphite
|
19.3 %
|
489,000 t
|
Probable
|
2.97 Mt
|
Graphite
|
16.7 %
|
498,000 t
|
Proven & Probable
|
5.51 Mt
|
Graphite
|
17.9 %
|
987,000 t
|
Measured
|
6.5 Mt
|
Graphite
|
12.1 %
|
781,800 t
|
Indicated
|
8.4 Mt
|
Graphite
|
10.5 %
|
887,300 t
|
Inferred
|
26.9 Mt
|
Graphite
|
10.5 %
|
2,837,600 t
|
Total Resource
|
41.8 Mt
|
Graphite
|
10.8 %
|
4,506,700 t
|