Overview
Stage | Production |
Mine Type | Underground |
Commodities |
|
Mining Method |
- Resue mining
- Shrinkage stoping
- Cemented backfill
|
Production Start | ...  |
Mine Life | 2034 |
Source:
p. 8
Yangtze Mining Ltd. (“Yangtze Mining”) was incorporated on February 11, 2002, under the laws of the BVI. It holds a 100% interest in Yangtze Mining (H.K.) Ltd. (“Yangtze Mining HK”). Yangtze Mining HK holds a 95% interest in Guangdong Found Mining Co. Ltd. (“Guangdong Found”), a company incorporated on October 26, 2008 under the laws of the People’s Republic of China, that holds a 100% interest in the silver, lead and zinc exploration permits on the project in Gaocheng (the “GC Mine” or “Gaocheng”) in Guangdong Province. In October 2018, Silvercorp Metals (China) Inc., a wholly-owned subsidiary of the Company, acquired an additional 4% interest in Guangdong Found, and as a result, the Company now beneficially owns a 99% interest in Guangdong Found.
Contractors
- Subscription is required.
Deposit Type
- Mesothermal
- Vein / narrow vein
Summary:
The poly-metallic mineralization of the GC deposit belongs to the mesothermal vein infill style of deposit and exhibits the following characteristics:
• The mineralization occurs as veins which are structurally controlled within broader alteration zones. The alteration can reach more than a few metres along the faults distributing in both hangingwall and footwall.
• The veins have a sharp contact with the host rocks and steeply dip at angles between 60 – 85°.
In general, the Ag-Zn-Pb mineralization occurs along the strike of the faults. The veins have true widths varying from just over 0.1 m to over 10 m. They have been traced for over 1,250 m along strike, and approximately 550 m down dip.
Ag-Zn-Pb mineralization at the GC deposit can be divided into two types: primary and oxidized. The primary mineralization is mainly composed of galena-sphalerite-silver minerals which occur sparsely, as disseminations, veinlets and lumps. Primary mineralization accounts for 95% of the entire Mineral Resource. Oxide mineralization occurs on and near the surface.
Mineralized veins in the GC area occur in relatively permeable fault-breccia zones. These zones are extensively oxidized from the surface to depths of about 40 m. Veins in this zone exhibit open space and boxwork lattice textures resulting from the leaching and oxidation of sulphide minerals. Secondary minerals present in varying amounts in this zone include kaolinite, hematite, and l ........

Mining Methods
- Resue mining
- Shrinkage stoping
- Cemented backfill
Summary:
Mining has been conducted in two stages that are horizontally defined by mine sections and vertically by elevations, with a general description as follows:
1 Stage 1: +150 mRL to -50 mRL between local Mine Sections 10 to 36 for development and 12 to 32 for production - west side of project.
2 Stage 2: +100 mRL to -50 mRL between Mine Sections 36 to 54 for development and 32 to 54 for production. From -50 m RL to -300 mRL between Mine Sections 12 to 50 for both development and production.
Stage 1 essentially targeted bringing the project into production as soon as practicable using mobile rubber-tired diesel-powered equipment (development jumbo, loader, and truck) with surface declines access down to -50 mRL.
Stage 2 development from -50 mRL down to -300 mRL employs conventional tracked equipment (battery powered locomotives, rail cars, electric rocker shovels and pneumatic handheld drills) via a surface shaft access.
Selective stoping methods - shrinkage and resuing - are employed with stope production drilling conducted with pneumatic jackleg drilling. In-stope rock movement is by gravity to draw points or hand-carting to steel-lined passes.
Stage 1 production mucking used load-haul-dump loaders (LHD) with trucks hauling ore to the surface ROM stockpile, and ore was re-handled from the ROM stockpile to the primary crusher feed bin using a ROM front-end-loader (FEL).
Stage 2 and ongoing product ........

Source:

- subscription is required.
Flow Sheet:
Summary:

- subscription is required.
Reserves at December 31, 2020:
Mineral Resource are reported at a silver equivalent (AgEq) cut-off grade of 105 g/t AgEg.
Mineral Reserve:
• Full breakeven cut-off grades: Shrinkage = 215 g/t AgEq: Resuing = 275 g/t AgEq.
• Marginal material cut-off grade: Shrinkage = 185 g/t AgEq; Resuing = 250 g/t AgEq.
Category | Tonnage | Commodity | Grade | Contained Metal |
Proven & Probable
|
4.131 Mt
|
Silver
|
94 g/t
|
12,483 koz
|
Proven & Probable
|
4.131 Mt
|
Lead
|
1.5 %
|
135 M lbs
|
Proven & Probable
|
4.131 Mt
|
Zinc
|
3.2 %
|
293 M lbs
|
Measured & Indicated
|
10.033 Mt
|
Silver
|
82 g/t
|
26,363 koz
|
Measured & Indicated
|
10.033 Mt
|
Lead
|
1.2 %
|
265 M lbs
|
Measured & Indicated
|
10.033 Mt
|
Zinc
|
2.8 %
|
619 M lbs
|
Inferred
|
8.441 Mt
|
Silver
|
87 g/t
|
23,562 koz
|
Inferred
|
8.441 Mt
|
Lead
|
1 %
|
195 M lbs
|
Inferred
|
8.441 Mt
|
Zinc
|
2.4 %
|
442 M lbs
|
Corporate Filings & Presentations:
- Subscription is required.
- Subscription is required.