• Data Access
  • Your Email  
  • Your Email  
Keep me signed in.
Forgot your password?
Close
  • Forgot Your Password?
  • Enter the email you signed up with and we'll email it to you.
  • Your Email  
Close
Back
MDO
Mining Data Solutions
  • Home
  • Database
  • Subscribe
  • Sign In
  • Sign In
Australia
Newlands Mine

This page is not tailored to
devices with screen width under 750 px.
 Location:
133 km W from Mackay, Queensland, Australia

  Address:
Newlands Access Road via Glenden
Queensland, Australia
4743
Phone  ...  Subscription required
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in Australia
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Fleet
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StageProduction
Mine TypeOpen Pit
Commodities
  • Coal (metallurgical & thermal)
Mining Method
  • Truck & Shovel / Loader
  • Dragline
Production Start...
Mine Life1 years (as of Jan 1, 2021)


Owners

Source: p. 1
CompanyInterestOwnership
Glencore plc. 100 % Indirect
Glencore Coal Queensland Pty Limited (operator) 100 % Direct
Newlands Coal is 100% owned and managed by Glencore Coal Queensland.

Contractors

Subscription required - Subscription is required.


Deposit Type

  • Sedimentary


Summary:

The Bowen Basin contains much of the known Permian coal resources in Queensland, including virtually all of the known mineable prime coking coal.

Coal accumulation in the Bowen Basin occurred in a wide variety of depositional environments and the coal measures reflect this diversity, with variation in seam thickness, lateral continuity and coal quality.

Coal-bearing strata occur within several geological formations in the Bowen Basin. Deposits of economic importance are restricted to four groups, ranging from Early Permian (Group I) to Late Permian (Group IV) in age.

IV Late Permian.
This is the most diverse group in terms of coal quality and also the most widely distributed within the basin. Although the rank and quality of Group IV coals vary greatly, they are characterised by their comparatively greatly, they are characterised by their comparatively low levels of sulphur. They are of major economic importance as a source of both metallurgical and thermal coals (Mines: Newlands, Eastern Creek, Suttor Creek).

III Late Permian
Group III coals include major deposits of high grade coking coal, which are mined by open-cut (Wollombi).


Mining Methods

  • Truck & Shovel / Loader
  • Dragline


Summary:

The Newlands consists of three distinct mining operations, these being: the main deposit, which includes an open cut mine and the coal handling and processing plant (CHPP) within existing mining leases, the Eastern Creek open cut mine, the Suttor Creek open cut mine and the Wollombi open cut mine.

The Wollombi pit contains 4 mineable coal seams, which range from 2.6 to 9.6m (8.5 to 31.5 ft) in thickness, at a depth of up to 180 metres (591 ft) and utilizes a truck and shovel fleet, consisting of predominantly 3x Leibherr 996 Excavators for waste removal. The Suttor Creek pit is a conventional strip mining pit, which contains both a Marion 8750 and a Bucyrus Erie 1370 for removal of overburden.


Crushing and Grinding


Processing

Source: Subscription required

Summary:

- subscription is required.


Production:

CommodityUnits2021202020192018201720162015
Coal (metallurgical & thermal) t  ......  Subscription required  ......  Subscription required  ......  Subscription required5,523,0005,645,0005,652,0005,840,000
All production numbers are expressed as clean coal.
Subscription required - Subscription is required.


Reserves at December 31, 2021:

CategoryTonnage CommodityMarketable Coal
Proven 2 Mt Coal (thermal) 2 Mt
Proven 1 Mt Coal (hard coking) 0.7 Mt
Probable 0.8 Mt Coal (thermal) 0.7 Mt
Probable 1 Mt Coal (hard coking) 0.8 Mt
Measured 310 Mt Coal (thermal)
Indicated 140 Mt Coal (thermal)
Inferred 400 Mt Coal (thermal)


Pipelines
TypeMaterialDiameterLengthDescription


Heavy Mobile Equipment:
HME TypeModelSizeQuantityLeased or
Contractor
Ref. Date
Dozer Leased Apr 15, 2021
Dozer (crawler) ....................... Subscription required ....................... Subscription required Mar 1, 2019
Dragline ....................... Subscription required ....................... Subscription required Mar 1, 2019
Drill ....................... Subscription required Mar 1, 2019
Excavator Leased Apr 15, 2021
Grader ....................... Subscription required Mar 1, 2019
Loader (FEL) Leased Apr 15, 2021
Truck (dump) Leased Apr 15, 2021
Truck (haul) ....................... Subscription required 160 t ....................... Subscription required Leased Apr 15, 2021
Truck (water) ....................... Subscription required Mar 1, 2019
Subscription required - Subscription is required.

Mine Management:

Job TitleNamePhoneEmailProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Aug 4, 2022
....................... Subscription required ....................... Subscription required ....................... Subscription required ....................... Subscription required Subscription required Aug 2, 2022
....................... Subscription required ....................... Subscription required Subscription required Aug 2, 2022
....................... Subscription required ....................... Subscription required Subscription required Aug 2, 2022
Subscription required - Subscription is required.

Staff:

EmployeesTotal WorkforceYear
Subscription required 2021
Subscription required 2020
Subscription required 2019

Corporate Filings & Presentations:

DocumentYear
Other 2022
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2019
Annual Report 2018
Year-end Mineral Reserves 2018
Annual Report 2017
Annual Report 2016
Annual Report 2015
Fact Sheet 2015
Other 2013
Other 2008
Other 2007
Other 2006
Subscription required - Subscription is required.

Subscription required - Subscription is required.

Terms of Use Privacy Policy © 2017-2023 MDO Data Online Inc.