Overview
Stage | Feasibility |
Mine Type | Underground |
Commodities |
|
Mine Life | 5 years (as of Jan 1, 2021) |
The Bloemhoek Project DFS, which involves accessing a portion of the SOFS project towards the north of No. 3 Shaft, and would extend the No. 3 Shaft LoM by five years, was concluded in 2021, but has not yet been approved for execution. |
Source:
p. 8
Wholly-owned and managed projects in study phase include Bloemhoek, De Bron Merriespruit and Beisa. Bloemhoek and De Bron Merriespruit are both gold projects, which form part of the Southern Free State (SOFS) exploration project area.
Contractors
- Subscription is required.
Summary:
Clear patterns of mineralisation, characterised by a highly channelised fluvial depositional environment, can be distinguished.
Expected mineral extraction is estimated to be at depths varying between 450m and 2,500m below surface and will focus on shallow gold/uranium deposits comprising the BXR/VS5, AAR, B and Leader Reefs.
Reserves at December 31, 2021:
Category | Tonnage | Commodity | Grade | Contained Metal |
Indicated
|
27.4 Mt
|
Gold
|
4.7 g/t
|
4.2 M oz
|
Inferred
|
0.9 Mt
|
Gold
|
4.9 g/t
|
0.1 M oz
|
Corporate Filings & Presentations:
- Subscription is required.
- Subscription is required.