Mining Intelligence and News
Zimbabwe

Cam & Motor Mine

Click for more information

Categories

Summary

Mine TypeOpen Pit
StatusActive
Commodities
  • Gold
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotCam & Motor Mine uses the latest technology in the processing of “stubborn” gold – a biological oxidation plant, the only one in Zimbabwe and the second-largest in Africa.

As of 2024, RioZim seeks to put a lasting solution to the power supply challenges at Cam mine, through provision of adequate and reliable back up power generators, which are essential to reduce plant downtime in times of power cuts.

In 2024, production halted at Cam & Motor due to persistent mill break downs. Cam operated on one mill throughout the year after the second mill was decommissioned, which constrained plant availability due to reduced milling capacity and lack of redundancy.

The installation of a second mill is a priority to restore the mine’s design capacity.

Owners

SourceSource
CompanyInterestOwnership
RioZim Ltd. 100 % Indirect
RioGold (Private) Ltd. (operator) 100 % Direct
RioZim operates the Cam & Motor gold mine in Kadoma.

Contractors

Lock

- subscription is required.

Deposit type

  • Vein / narrow vein
  • Sandstone hosted
  • Magmatic

Summary:

Midlands Greenstone Belt is:
1) the largest of all the Archean Greenstone Belts in Zimbabwe (located at the Centre of Zimbabwe).
2) the most productive gold belt (>400 tonnes Au mined to date) in Zimbabwe and stretches for 150km with average width of 50km (altitude varies from 900-1300m above sea level.

Stretches from Kwekwe to Kadoma, touching the Gweru greenstone belt to the south and the Chegutu greenstone belt to the north.

Midlands Greenstone Belt comprises of the following Litho-stratigraphic units:
a) Rhodesdale Granitoid Gneiss Complex;
b) Greenstone Belt Metavolcanics lithologies (Bulawayan);
c) Shamvaian Sediments;
d) Tonalitic granitoid plutons and other major felsic intrusions.

Motor Deposit Orebody Characteristics:
- General North-South trending;
- Dip 70 degrees west;
- Plunges 65 degrees southwest;
- Average width 15-20m;
- Orebody structurally and lithologically controlled;
- Gold mineralised units include meta-basalts, sandstones, black shale and quartz veins.

Cam and Motor Main Lithological Units:
1. Metavolcanics (Metabasalts, Metadolerites);
2. Metasediments (Sandstones, greywacke, arkose);
3. Black shale sediments with intercalations of sandstone in places;
4. Quartz veins;
5. Ferricretes (grits);
6. Conglomerates.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Commodity Production

Production halted at Cam & Motor (Cam) due to persistent mill break downs.
CommodityUnits2024202320222021202020192018201720162015
Gold kg  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe738758974856450

Operational metrics

Metrics2017
Daily milling capacity 2,500 t
Daily processing capacity 200 t
Annual ore mining rate 540 kt

Production Costs

Commodity production costs have not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Aug 12, 2025
....................... Subscription required ....................... Subscription required Subscription required Aug 12, 2025

Workforce

EmployeesYear
...... Subscription required 2022

Aerial view:

Lock

- subscription is required.