Australia
Finniss (Grants) Project

This page is not tailored to
devices with screen width under 750 px.
 Location:
30 km SW from Darwin, Northern Territory, Australia

  Project Contacts:
Level 1, 366 King William Street
Adelaide
South Australia, Australia
5000
Phone  ...  Subscription required
EmailEmail
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in Australia
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Costs & Financials
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StagePermitting
Mine TypeOpen Pit
Commodities
  • Lithium
Mining Method
  • Truck & Shovel / Loader
Processing
  • Gravity separation
  • Flotation
  • Dense media separation
Mine Life2 years (as of Jan 1, 2018)
Latest NewsCore receives key government approval for Finniss     January 13, 2021


Owners & OPERATOR

Source: p. 2
CompanyInterestOwnership
Primero Group Ltd. (operator)
Core Lithium Ltd. 100 % Direct

Deposit Type

  • Pegmatite


Summary:

The Finniss Lithium Project (Grants and BP33 Lithium Deposits) is hosted within a rare element pegmatite that is a member of the Bynoe Pegmatite Field. The Bynoe Pegmatite Field is situated 15km south of Darwin and extends for up to 70km in length and 15 km in width. Over 100 pegmatites are known within clustered groups or as single bodies. Individual pegmatites vary in size from a few metres wide and tens of metres long up to larger bodies tens of metres wide and hundreds of metres long.

The pegmatites are predominantly hosted within the early Proterozoic metasedimentary lithologies of the Burrell Creek Formation and are usually conformable to the regional schistosity. The Bynoe pegmatites are classified as LCT (Lithium-Caesium-Tantalum) type and are believed to have been derived from the ~ 1845 Ma S-Type Two Sisters Granite which outcrops to the west.

Fresh pegmatite is composed of coarse spodumene, quartz, albite, microcline and muscovite (in decreasing order of abundance). Spodumene, a lithium-bearing pyroxene (LiAl(SiO3)2), is the predominant lithium- bearing phase and displays a diagnostic red- pink UV fluorescence. The pegmatite is not strongly zoned, apart from a thin (1-2m) quartz-mica-albitewall facies and some barren internal quartz veins.

The geological interpretation is considered robust due to the nature of the mineralisation. The mineralisation is hosted within the pegmatite. The locations of the hangingwall and footwall of the pegmatite intrusion are well understood with drilling which penetrates both contacts.

The Finniss pegmatites have intruded early Proterozoic shales, siltstones and schists of the Burrell Creek Formation which lies on the northwest margin of the Pine Creek Geosyncline. To the south and west are the granitoid plutons and pegmatitic granite stocks of the Litchfield Complex. The source of the fluids that have formed the intruding pegmatites is generally accepted as being the Two Sisters Granite to the west of the belt, and which probably underlies the entire area at depths of 5-10 km.

The pegmatite is considered to be continuous over the length of the deposit. It thins and pinches out to the north and south. The mineralisation terminates approximately 40 m from the northern extent of the modelled pegmatite. A non-mineralised wall rock phase of 1-2m thickness is often present. A single grade domain has been identified and estimated using a hard boundary.

The lithium is hosted within a 170m long section of mineralised pegmatite which strikes NE and averages 20-30m in true width.

The pegmatite is sub-vertical to steeply east dipping and has been intersected at a depth of approximately 240m below surface.

Whilst continuous, the pegmatite body does appear to narrow to the north but remains open to the south. The pegmatite is deeply weathered to depths of approximately 50m below surface.


Mining Methods

  • Truck & Shovel / Loader


Summary:

Contract mining services are proposed for the mining operation. Mining is expected to be straightforward conventional open pit mining utilising standard drill and blast and conventional excavator and truck fleet. There is very little groundwater and geotechnical conditions are not problematic.

Mining will be focused on delivering sustainable ore quantities to the ROM pad. Crushing and screening or processing of the delivered ROM ore will produce product ready for haulage to the Port of Darwin.


Crushing and Grinding


Processing

  • Gravity separation
  • Flotation
  • Dense media separation

Flow Sheet: Subscription required

Summary:

As a result of the test work conducted to date, the following flowsheet is proposed:
- Feed preparation by conventional tertiary crushing circuit followed by fines removal.
- Coarse spodumene concentrate generated by Dense Medium Separation (DMS) with middlings stream stockpiled for possible future recovery through other methods and throwaway tail.
- Because of the low mica content of the spodumene ore (<23%), the use of a reflux classifier has demonstrated limited mica removal benefit.
- Thickening of tailings for disposal.

Recoveries & Grades:

CommodityParameterAvg. LOM
Li2O Recovery Rate, %  ......  Subscription required
Li2O Head Grade, % 1.48
Li2O Concentrate Grade, %  ......  Subscription required
Subscription required - Subscription is required.

Projected Production:

CommodityUnitsLOM
Li2O t 400,083
All production numbers are expressed as concentrate.

Operational Metrics:

Metrics
Stripping / waste ratio  ......  Subscription required
Waste tonnes, LOM  ......  Subscription required
Ore tonnes mined, LOM  ......  Subscription required
Total tonnes mined, LOM  ......  Subscription required
Tonnes processed, LOM  ......  Subscription required
* According to 2018 study.
Subscription required - Subscription is required.

Reserves at May 23, 2018:

CategoryTonnage CommodityGradeContained Metal
Indicated 1,130,000 t Li2O 1.5 % 17,000 t
Inferred 2,320,000 t Li2O 1.4 % 33,000 t
Total Resource 3,450,000 t Li2O 1.4 % 50,000 t

Commodity Production Costs:

CommodityUnitsAverage
Total cash costs Spodumene USD  ......  Subscription required *
* According to 2018 study / presentation.
Subscription required - Subscription is required.

2018 Study Costs and Valuation Metrics :

MetricsUnitsLOM Total
Pre-Production capital costs $M AUD  ......  Subscription required
Sustaining CapEx $M AUD  ......  Subscription required
Total CapEx $M AUD  ......  Subscription required
Royalty payments $M AUD  ......  Subscription required
Gross revenue (LOM) $M AUD  ......  Subscription required
EBITDA (LOM) $M AUD  ......  Subscription required
Pre-tax Cash Flow (LOM) $M AUD  ......  Subscription required
Pre-tax NPV @ 10% $M AUD  ......  Subscription required
Pre-tax IRR, %  ......  Subscription required
Pre-tax payback period, years  ......  Subscription required
Subscription required - Subscription is required.

Heavy Mobile Equipment:

Mine Management:

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Jan 27, 2021
Subscription required - Subscription is required.


Corporate Filings & Presentations:

DocumentYear
Corporate Presentation 2021
................................... Subscription required 2019
................................... Subscription required 2019
................................... Subscription required 2018
................................... Subscription required 2018
................................... Subscription required 2018
Subscription required - Subscription is required.

News:

NewsDate
Core receives key government approval for Finniss January 13, 2021
Core gains final government approval for NT’s first lithium mine April 3, 2020
Core Lithium unearths ‘world-class’ lithium discovery January 16, 2020
Core Lithium: Primero rides high on $100m lithium contract July 25, 2019
Core Lithium scores positive response to NT lithium project June 18, 2019
NT lithium project gets Core contractor team January 25, 2019