Mining Intelligence and News
Australia

Hail Creek Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusActive
Commodities
  • Coal (thermal)
  • Coal (metallurgical)
Mining Method
  • Truck & Shovel / Loader
  • Dragline
  • Strip mining (roll-over)
Production Start... Lock
Mine Life... Lock
SnapshotHail Creek Open Cut extracts coking and thermal coal from a large-scale Permian coal basin.

Hail Creek Coal Holdings Pty Ltd., on behalf of Hail Creek Joint Venture, has proposed an amendment to its current approvals for developing the Hail Creek Eastern Margin Extension.

The Project is proposed to expand Hail Creek’s mine disturbance footprint though is not seeking to increase the mine’s existing annual tonnage limit nor extend mining operations (due to end 2040). The extent of the existing Kemmis Pit, Carrinyah Pit and Exevale Pit are proposed to be amended to reflect the new mine plan. In addition to these extensions, a new pit (Homevale) is also proposed. The Project will include the realignment of a haul road that is currently within the authorised disturbance area to a newly proposed area which will result in less disturbance.

Owners

SourceSource
CompanyInterestOwnership
Sumisho Coal Development Pty Ltd 3.33 % Indirect
Marubeni Coal Pty Ltd. 12 % Indirect
Glencore plc. 84.67 % Indirect
Hail Creek Coal Pty Ltd (operator) 100 % Direct
Glencore manages the Hail Creek mining operations on behalf of a Joint Venture between Marubeni (12%), Sumitomo (3.33%) and Glencore (84.67%).

Deposit type

  • Sedimentary

Summary:

The coal deposit is part of the Bowen Basin, a significant Permian coal basin stretching 600 kilometres long and 250 kilometres wide. Coal is mined from two seams; the Elphinstone Seam, with an average thickness of 6.4 metres and the Hynds Seam, averaging 8.3 metres in thickness.

The Project is located within the Hail Creek Syncline, consisting of Permian to Triassic age sediments, discontinuously overlain by Quaternary alluvial sediments associated with Hail Creek and its tributaries. The Hail Creek Syncline is aligned to the south-southeast and is approximately 30 km long and 7 km wide (AGE, in prep). The syncline is asymmetric, dipping up to 30° on the eastern limb and up to 15° on the western limb. An indicative schematic cross section of the Hail Creek Syncline.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

CommodityUnits2024202320222021202020192018201720162015
Coal (hard coking) Mt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe5.55.45.26.16.2
Coal (thermal) Mt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe3.64.243.53.2
All production numbers are expressed as clean coal.

Operational metrics

Metrics202420232022202120202019201820172016
Coal tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe7,660,496 t10,203,613 t9,195,752 t10,228,814 t
Tonnes processed  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe10,000,076 t9,166,559 t10,439,914 t

Production Costs

Commodity production costs have not been reported.

Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Oct 30, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 30, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 30, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 30, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 31, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 30, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 30, 2024

EmployeesTotal WorkforceYear
...... Subscription required 2023
...... Subscription required 2022
...... Subscription required 2021
...... Subscription required 2020
...... Subscription required 2019
...... Subscription required 2018
...... Subscription required 2015
...... Subscription required 2014
...... Subscription required 2013