Overview
Status | Care and Maintenance |
Mine Type | Underground |
Commodities |
|
Mining Method |
- Open stoping
- Paste backfill
|
Between 2005 and 2015, Lanfranchi produced a total of 3.85M tonnes of ore at an average grade of 2.45% Ni for 94,196t Ni. The mine has been on care and maintenance since 2015. Black Mountain Resources (formerly Black Mountain Metals) is in the process of returning the mine to production. |
Source:
p. 6
The Lanfranchi Nickel Mine (LNM), located within mineral lease ML15/346, ML15/347, ML15/377, ML 15/385, ML 15/386, ML 15/387, ML 15/388, ML 15/486, ML 15/487, ML 15/493 and mining lease M 15/473.
LNM tenements were previously held by BHP Billiton Nickel West (BHP Nickel West) and subleased to LNM. In October 2010, ownership of the tenements was transferred into the names of Cherish Metals Pty Ltd.
Black Mountain Metals Pty Ltd (BMM, now Black Mountain Resources) purchased Cherish Metals Pty Ltd from the previous owner, Panoramic Resources, in December 2018. Cherish Metals Pty Ltd, including LNM, is a 100% wholly owned subsidiary of BMM.
October 05, 2021 – Black Mountain Metals and the Tembo Capital Group are pleased to announce that the two groups have created a strategic partnership to jointly advance the Lanfranchi nickel sulphide mine in Western Australia.
As part of the transaction, Black Mountain sold a 50% ownership interest in Lanfranchi to Tembo Capital.
Contractors
- Subscription is required.
Summary:
High-grade nickel sulphide deposits at Lanfranchi occur as ribbon-like shoots at the base of high magnesium komatiite lava flows or channels. The shoots and high-magnesium lava flows occupy channel structures developed in the underlying Lunnon (footwall) basalt. Above the high-magnesium komatiite flows is a thick sequence of progressively less magnesium-rich komatiite flows. Ten channel structures are recognised at Lanfranchi of which six have been mined historically.
Mining Methods
- Open stoping
- Paste backfill
Summary:
Historically, the majority of the ore has been mined via long-hole open stoping, which is a highly mechanised and low cost method. Using this method, access to the top and bottom of the ore block is established with tunnels, a slot raise is created, and holes are then drilled to blast the ore block. Once the ore block has been blasted and extracted, the stopes are filled with paste (tailings and cement mix) to stabilise the void and allow extraction of adjoining ore blocks.
Summary:
The nickel ore is trucked and treated at BHP Billiton Nickel West's Kambalda nickel concentrator under an Ore Tolling and Concentrate Purchase Agreement.
Recoveries & Grades:
Commodity | Parameter | 2016 | 2015 |
Nickel
|
Head Grade, %
| 2.33 | 2.26 |
Production:
Commodity | Units | 2016 | 2015 |
Nickel
|
t
| 1,019 | 10,575 |
Copper
|
t
| ......  | ......  |
All production numbers are expressed as metal in concentrate.
Operational Metrics:
Metrics | 2016 | 2015 |
Ore tonnes mined
| 43,692 t | 468,491 t |
Reserves at June 30, 2016:
Category | Tonnage | Commodity | Contained Metal |
Probable
|
208,000 t
|
Nickel
|
4,300 t
|
Corporate Filings & Presentations:
- Subscription is required.
- Subscription is required.