Overview
Status | Closing / Closed |
Mine Type | Underground |
Commodities |
|
Mining Method |
- Sub-level open stoping (SLOS)
- Backfill
|
Production Start | ...  |
The Matagami mine closed in June 2022. |
Source:
p. 20
Contractors
- Subscription is required.
Summary:
The Bracemac-McLeod deposits comprise a cluster of polymetallic VMS lenses. All shallower deposits are mined-out and only the McLeod Deep lens remains.
The PD-1, Caber / Caber Nord deposits are part of the Matagami camp. Deposits are a polymetallic VMS of the same age and derived from the same ore forming hydrothermal system as the rest of the Matagami camp deposits.
Mineralization - Bracemac Deposits
The Bracemac deposit comprises three distinct lenses, Bracemac KT (BKT), Bracemac Main (BRC) and Upper Bracemac (uBRC), forming a stacked sequence interpreted as resulting from reactivation of an hydrothermal system along a synvolcanic structure following deposition of the Wabassee Group hanging wall basalts.
Upper Bracemac Zone
The uBRC is a small tabular lens oriented approximately N130° and dipping at -62°. The upper part of the lens is probably coming to surface under 30 to 35 m of overburden. The longest axis of this orebody is about 150 m long, plunging to N275° / -45°, and the shortest about 75 m long plunging to N150° / -45°. The uBRC lens is roughly located 80 m over the BRC zone.
The sulphides of this zone are semi-massive and count for 35 to 50% of the rock, the rest being mostly basalt, tuffite, magnetite, black chlorite (Chl), quartz (Qz) and calcite (Cal) veins. Typically, the zone is composed of 20-25% sphalerite, 15-20% pyrite, 15-20% pyrrhotite and 2-3% of chalcopyrite.
Bracemac Main Zone
The Bracemac Main zone (the designation has later been shortened to ........

Mining Methods
- Sub-level open stoping (SLOS)
- Backfill
Summary:
The Matagami mine closed in June 2022.
A first section of underground ramp 2.4 km long provides access to the Bracemac deposit. This then extends for 1.2 km to reach the McLeod deposit. By the end of the McLeod Deep lens operation, the ramp will have reached a length of approximately 10 km. The ramp portal is located in the mining pit of the Bell-Allard South site. A network of ramps allows the exploitation of the Bracemac and McLeod deposits which extend respectively from 70 m to 600 m and from 360 m to 1490 m in depth from the ground surface.
Ore mined from the Bracemac-McLeod mine is processed at the MLM site's concentrator to produce zinc and copper concentrates. Tailings are sent to the tailings site. Waste rock is used underground as a rock fill, whether cemented or not.
The extraction method at Bracemac-McLeod is sublevel open stoping.
Source:
Summary:

- subscription is required.
Reserves at December 31, 2022:
Category | Tonnage | Commodity | Grade |
Measured & Indicated
|
3 Mt
|
Zinc
|
5.25 %
|
Measured & Indicated
|
3 Mt
|
Copper
|
1.11 %
|
Measured & Indicated
|
3 Mt
|
Silver
|
14.8 g/t
|
Measured & Indicated
|
1.5 Mt
|
Gold
|
0.28 g/t
|
Inferred
|
6 Mt
|
Zinc
|
2.56 %
|
Inferred
|
6 Mt
|
Copper
|
1.2 %
|
Inferred
|
6 Mt
|
Silver
|
11 g/t
|
Inferred
|
6 Mt
|
Gold
|
0.12 g/t
|
Mine Management:
Job Title | Name | Profile | Ref. Date |
.......................
|
.......................
|
|
Apr 27, 2023
|
- Subscription is required.
Staff:
Employees | Year |
|
2020
|
|
2019
|
Corporate Filings & Presentations:
- Subscription is required.
- Subscription is required.