Overview
Stage | Production |
Mine Type | Open Pit |
Commodities |
|
Mining Method |
|
Production Start | ...  |
The Satui Site is one of the first sites operating since the establishment of PT Arutmin Indonesia. |
Source:
p. 90, 131
Contractors
- Subscription is required.
Summary:
The mining operations are segregated into three mining areas; Bukit, Kintap and Mulia. The mining areas of Bukit and Kintap cover a bituminous coal formation across 35km of strike with the southern area of Mulia in sub-bituminous coal formations.
Summary:
Satui mine has been operating since the early 1980’s and as a result there are several old open cast mining areas across their large mining lease.
Source:
Summary:

- subscription is required.
Reserves at December 31, 2021:
Category | Tonnage | Commodity |
Proven
|
1.9 Mt
|
Coal (thermal)
|
Probable
|
28.1 Mt
|
Coal (thermal)
|
Proven & Probable
|
30 Mt
|
Coal (thermal)
|
Measured
|
107.9 Mt
|
Coal (thermal)
|
Indicated
|
49 Mt
|
Coal (thermal)
|
Inferred
|
22.6 Mt
|
Coal (thermal)
|
Total Resource
|
179.5 Mt
|
Coal (thermal)
|
Mine Management:
Job Title | Name | Profile | Ref. Date |
.......................
|
.......................
|
|
Jul 26, 2022
|
- Subscription is required.
Corporate Filings & Presentations:
- Subscription is required.
- Subscription is required.