Mining Intelligence and News
Indonesia

Talang Santo Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusCare and Maintenance
Commodities
  • Gold
  • Silver
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
SnapshotGold and silver production at Talang Santo was active between 2014 and 2020 from both open-pit and underground mines. Mining operations have been placed on care and maintenance while further exploration is conducted.

During the 2023 financial year, Kingsrose Mining Limited completed the sale of its interest in the Way Linggo gold project to Capwill Global Limited by announcement on 16 December 2022. At completion of the sale, the Company received US$7,500,000 that will be used to further its strategy of responsible critical metals discovery. Additionally, the Kingsrose Mining will receive a 2% net smelter royalty in respect of the Way Linggo gold project.
Related AssetWay Linggo Operation

Owners

SourceSource
CompanyInterestOwnership
PT Perisai Mulia Nusantara (PTPMN) 15 % Indirect
Kingsrose Mining Ltd. 85 % Indirect
PT Natarang Mining (operator) 100 % Direct
PT Natarang Mining (PTNM), owner and operator of the Way Linggo Project. PTNM is 85% owned by Kingsrose Mining Limited.

During the 2023 financial year, Kingsrose Mining Limited completed the sale of its interest in the Way Linggo gold project to Capwill Global Limited by announcement on 16 December 2022.

Deposit type

  • Epithermal

Summary:

The Talang Santo deposit is a low-sulphidation epithermal gold-silver system, with the majority of Mineral Resources hosted in a vein and breccia zone that has been traced over 1.4 kilometres strike and up to 450 metres depth.

The Talang Santo deposit is centred on an extensive epithermal quartz vein system, which has been interpreted over a strike of approximately 1.4 kilometres, with the best mineralisation being exhibited over 550 metres of this strike.

Conceptually, the main interpreted domain for estimation is an individual continuous structural zone, modelled over the entire strike length. Within this zone, there are multiple mineralisation styles including banded epithermal veining, breccia, stockwork, clay alteration and fault gouge. For practical purposes, these related mineralised styles within the same structural corridor have been combined for estimation as a single package.

Subordinate mineralised zones, ‘splays’ to the main structure, have also been modelled. These are a similar mineralisation style to the main zone but generally trend northwest intersecting the main zone at an angle of approximately 30 degrees.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

CommodityUnits202020162015
Silver oz  ....  Subscribe39,81259,949
All production numbers are expressed as metal in doré.

Operational metrics

Metrics202020192018201720162015
Ore tonnes mined  ....  Subscribe25,457 t7,904 t32,776 t65,882 t67,487 t
Waste  ....  Subscribe655,459 bcm
Total tonnes mined  ....  Subscribe
Tonnes milled  ....  Subscribe67,387 t79,291 t

Production Costs

Commodity production costs have not been reported.

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Oct 31, 2023

Aerial view:

Lock

- subscription is required.