Australia
Byerwen Mine

This page is not tailored to
devices with screen width under 750 px.
 Location:
20 km NW from Glenden, Queensland, Australia

  Address:
Level 15/40 Creek Street
PO Box 10630
Brisbane
Queensland, Australia
4000
Phone  ...  Subscription required
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in Australia
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Fleet
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StageProduction
Mine TypeOpen Pit
Commodities
  • Coal (thermal)
  • Coal (hard coking)
Mining Method
  • Truck & Shovel / Loader
  • Dragline
Production Start...
Mine Life46 years (as of Jan 1, 2018)


Owners

Source: p. 6
CompanyInterestOwnership
JFE Steel Corp. 15 % Indirect
QCoal Group 85 % Indirect
Byerwen Coal is a joint venture between QCoal Pty Ltd (QCoal) and JFE Steel. QCoal is a privately-owned Queensland company based in Brisbane and has been active in the Queensland coal exploration and mining industry since 1989. JFE Steel is a subsidiary of the JFE Group of Japan. The JFE Group is Queensland’s largest export customer and JFE Steel is one of the largest customers of Queensland-sourced coking coal.

Contractors

Subscription required - Subscription is required.


Deposit Type

  • Sedimentary


Summary:

The project is located within the Northern Bowen Basin which is characterised by typical basin fill fluvial (and some marine) sediments, comprising mudstones, siltstones, sandstones and coal seams. The regional geology is described in the 1:250,000 Mount Coolon Geology map sheet, published by the Queensland Department of Mines and Energy, 1997.

The Bowen Basin contains Early Permian rocks of the marginal marine Back Creek Group, Late Permian coal-bearing (non-marine) strata of the Blackwater Group, fluviatile sedimentary rocks of Triassic Rewan Group, and overlying Tertiary basalt and sediments of the Suttor Formation and Quaternary alluvium deposits.


Mining Methods

  • Truck & Shovel / Loader
  • Dragline


Summary:

Open Cut Mining
The open cuts will become deeper as mining progresses. The maximum depth of the open cut will be approximately 350 m below surface in South Pit 1.

The maximum extent of these open pits, the approximate maximum depth below surface at which coal seams are located and the year in which the maximum extent is reached.

The broad mining methodology for each open pit is:
- vegetation clearing (where required);
- soil stripping and storage or direct spreading;
- blasting of the waste rock (where required);
- removal of waste rock by truck, excavator and dragline in box-cuts, creating new mining strips and filling in old/previously mined voids;
- possible blasting of coal and the excavation of ROM coal by excavator and/or dragline;
- hauling of ROM coal to the ROM pad by off-road trucks and then to the CHPPs for washing and processing and train load out;
- final landform re-profiling, topsoiling and revegetation activities by earthmoving equipment.

The open cut mining process involves stripping surface soils, weathered and fresh waste rock and extracting coal quantities to meet coal production requirements. Other activities, including drilling and blasting, production dozing and ripping and pushing of thin coal seams, are scheduled to allow an orderly progression from one activity to the next to achieve a required ROM coal production.

The initial boxcut will be developed utilising ........


Crushing and Grinding
Source: Subscription required

- subscription is required.


Processing

Flow Sheet: Subscription required

Summary:

- subscription is required.


Production:

CommodityUnits20222021202020192018
Coal (thermal) t  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required1,602,628
Coal (hard coking) t  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required
All production numbers are expressed as clean coal.
Subscription required - Subscription is required.

Operational Metrics:

Metrics20222021202020192018
Coal tonnes mined  ......  Subscription required  ......  Subscription required  ......  Subscription required4,982,422 t of ROM coal2,217,160 t of ROM coal
Tonnes processed  ......  Subscription required  ......  Subscription required  ......  Subscription required3,688,456 t1,695,727 t
Annual production capacity  ......  Subscription required  ......  Subscription required  ......  Subscription required10 Mt of coal (metallurgical & thermal) clean coal
Raw coal annual capacity  ......  Subscription required  ......  Subscription required  ......  Subscription required15 Mt
Annual processing capacity  ......  Subscription required  ......  Subscription required  ......  Subscription required15 Mt of coal (metallurgical & thermal) clean coal
Subscription required - Subscription is required.

Reserves at January 25, 2018:

CategoryTonnage Commodity
Total Resource 690 Mt Coal (metallurgical & thermal)



Proposed Heavy Mobile Equipment as of January 25, 2018:
HME TypeModelSizeQuantityLeased or
Contractor
Dozer (crawler) ....................... Subscription required ....................... Subscription required Leased
....................... Subscription required ....................... Subscription required ....................... Subscription required Leased
....................... Subscription required ....................... Subscription required ....................... Subscription required Leased
....................... Subscription required ....................... Subscription required Leased
....................... Subscription required ....................... Subscription required ....................... Subscription required Leased
....................... Subscription required ....................... Subscription required ....................... Subscription required Leased
....................... Subscription required ....................... Subscription required ....................... Subscription required Leased
....................... Subscription required ....................... Subscription required ....................... Subscription required Leased
....................... Subscription required ....................... Subscription required ....................... Subscription required Leased
....................... Subscription required ....................... Subscription required ....................... Subscription required Leased
....................... Subscription required ....................... Subscription required Leased
....................... Subscription required ....................... Subscription required ....................... Subscription required Leased
Subscription required - Subscription is required.

Mine Management:

Job TitleNamePhoneProfileRef. Date
....................... Subscription required ....................... Subscription required ....................... Subscription required Subscription required Oct 20, 2022
....................... Subscription required ....................... Subscription required ....................... Subscription required Subscription required Oct 20, 2022
Subscription required - Subscription is required.

Staff:

EmployeesTotal WorkforceYear
Subscription required 2021
Subscription required 2020

Corporate Filings & Presentations:

DocumentYear
Other 2022
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2019
Environmental Impact Statement 2018
Environmental Impact Statement 2018