Overview
Stage | Production |
Mine Type | Open Pit |
Commodities |
|
Mining Method |
|
Production Start | ...  |
Mine Life | 40 years (as of Jan 1, 2022) |
The latest addition to the network of Hamersley Iron mines is Gudai-Darri, had first ore railed in December 2021, and commissioned its primary crusher in Q2 2022. |
Source:
p. 213,310
Gudai-Darri is an iron ore mine owned by Rio Tinto and operated by its fully-owned subsidiary Hamersley Iron Pty Ltd.
Contractors
- Subscription is required.
Summary:
Gudai-Darri, Tom Price, Paraburdoo and Western Turner Syncline: mineralisation is haematite/goethite mineralisation hosted within the banded iron formations of the Brockman Formation. Detrital deposits also occur at these sites.
The Project area lies within the Hamersley Range which is principally comprised of rocks of the Brockman Iron Formation. Further north is the broad expanse of the Fortescue Valley, which was formed by the preferential erosion of the Wittenoom Formation and includes deep layers of Cainozoic sediments.
The Gudai-Darri (formerly Koodaideri) mine area contains martite-geothite mineralisation predominantly within the Dales Gorge Member of the Brockman Iron Formation, with lesser mineralisation in the Joffre Member. A variable thickness hydrated capping overlies the deposits, which is permeated with numerous cavities. The orebody is underlain by the Mount McRae Shale and Mount Sylvia Formations.
Summary:
All of Hamersley Iron's mines are conventional open pits using track and shovel mining method with preliminary drilling and blasting. The drill holes are filled with an explosive, most often ANFO (Ammonium Nitrate/Fuel Oil) and then charged. The resulting blast breaks the material to a size required for digging.
The broken material is loaded for transport by face shovels, excavators or front-end loaders into haul trucks. Haul trucks at our operations are typically in the 190 tonne and 240 tonne class. Overland conveyors are used to transport partially crushed feed at sites where there are long distances between the pits and process plants.
Rail and port operations
Ore from processing facilities is railed up to 460 kilometres to the coast along a dedicated privately owned rail system. A typical train consist comprises 2 GE Dash 9 locomotives, 230 ore cars and is over 2.4 kilometres long. A single driver, supported by centralised track control, operates the train.
Once the train arrives at the port the ore cars go through the car-dumper. The ore cars are rotated and the ore flows out into bins and then is discharged onto conveyors.
The ore is stockpiled according to product type and the quality control plan. The travelling stackers create 250m long stockpiles. Rotary bucket-wheel reclaimers later reclaim the ore, which will be conveyed to the ship loader.
Vessels are loaded at the berths alongside the ore wharf. Lump ........

Source:

- subscription is required.
Flow Sheet:
Summary:

- subscription is required.
Combined production numbers are reported under
Hamersley Iron Operation
Operational Metrics:
Metrics | 2023 |
Annual production capacity
| ......  |
^ Guidance / Forecast.
- Subscription is required.
Reserves at December 31, 2020:
Category | Tonnage | Commodity | Grade |
Proven
|
286 Mt
|
Iron
|
62.2 %
|
Probable
|
275 Mt
|
Iron
|
61.3 %
|
Proven & Probable
|
561 Mt
|
Iron
|
61.8 %
|
Source:

- subscription is required.
HME Type | Model | Quantity | Ref. Date |
Drill (blasthole)
|
.......................
|
.......................
|
Jun 21, 2022
|
Truck (haul)
|
.......................
|
.......................
|
Jun 21, 2022
|
Truck (water)
|
.......................
|
.......................
|
Mar 17, 2022
|
- Subscription is required.
Corporate Filings & Presentations:
- Subscription is required.