Gudai-Darri (Koodaideri) Mine (Hamersley Iron Operation)

This page is not tailored to
devices with screen width under 750 px.
 Location:
97 km NW from Newman, Western Australia, Australia

  Regional Office:
Level 18, Central Park 152-158 St Georges Tce
Pert
Western Australia, Australia
6000
Phone  ...  Subscription required
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in Australia
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Fleet
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StageProduction
Mine TypeOpen Pit
Commodities
  • Iron Ore
Mining Method
  • Truck & Shovel / Loader
Processing
  • Dry Screening
  • Crush & Screen plant
Mine Life30 years (as of )
Latest NewsRio Tinto plc: Gudai-Darri iron ore heads to port     June 15, 2022


Owners

Source:
CompanyInterestOwnership
Rio Tinto plc 100 % Indirect

Deposit Type

  • Banded iron formation


Summary:

The Project area lies within the Hamersley Range which is principally comprised of rocks of the Brockman Iron Formation. Further north is the broad expanse of the Fortescue Valley,
which was formed by the preferential erosion of the Wittenoom Formation and includes deep layers of Cainozoic sediments.

The Koodaideri mine area contains martite-geothite mineralisation predominantly within the Dales Gorge Member of the Brockman Iron Formation, with lesser mineralisation in the Joffre Member. A variable thickness hydrated capping overlies the deposits, which is permeated with numerous cavities. The orebody is underlain by the Mount McRae Shale and Mount Sylvia Formations.


Mining Methods

  • Truck & Shovel / Loader


Summary:

Mining Operations
All of Hamersley Iron's mines are conventional open pits using track and shovel mining method with preliminary drilling and blasting. The drill holes are filled with an explosive, most often ANFO (Ammonium Nitrate/Fuel Oil) and then charged. The resulting blast breaks the material to a size required for digging.

The broken material is loaded for transport by face shovels, excavators or front-end loaders into haul trucks. Haul trucks at our operations are typically in the 190 tonne and 240 tonne class. Overland conveyors are used to transport partially crushed feed at sites where there are long distances between the pits and process plants.

Rail and port operations
Ore from processing facilities is railed up to 460 kilometres to the coast along a dedicated privately owned rail system. A typical train consist comprises 2 GE Dash 9 locomotives, 230 ore cars and is over 2.4 kilometres long. A single driver, supported by centralised track control, operates the train.

Once the train arrives at the port the ore cars go through the car-dumper. The ore cars are rotated and the ore flows out into bins and then is discharged onto conveyors.

The ore is stockpiled according to product type and the quality control plan. The travelling stackers create 250m long stockpiles. Rotary bucket-wheel reclaimers later reclaim the ore, which will be conveyed to the ship loader.

Vessels are loaded at the berths alongside the ore wharf. Lump ore is rescreened to remove undersize material. Reclaimed ore is conveyed along the wharf and the ore is loaded into the vessel’s holds by travelling, slewing and luffing shiploaders.


Crushing and Grinding
Flow Sheet: Source
Crusher / Mill TypeModelSizePowerQuantity
Gyratory crusher 1
Cone crusher 2

Summary:

Crushing facility will consists of primary gyratory crushing and secondary cone crushing.

The primary crushing facility comprises the following key equipment:
- ROM dump hopper;
- Maintenance crane;
- ROM Bin Rockbreaker;
- Primary gyratory crusher assembly;
- Primary crusher discharge surge bin
- Apron feeder;
- Crusher discharge conveyor;
- Conveyor weightometer, tramp metal detector and magnet;
- Ducted dust collection system;
- Primary crusher sump;
- Dust suppression, and fire protection system; and
- Compressed air system and water services.

The Secondary Crushing Facility receives oversize material from Product Screening Facility and re-crushes the material prior to it being conveyed back to the Product Screening Facility for re-screening. There will be two secondary cone crushers each with a design capacity of 3,300 t/h (wet).

The application also includes two mobile crushing and two mobile screening plants to be used during construction only.


Processing

  • Dry Screening
  • Crush & Screen plant

Flow Sheet: Subscription required

Summary:

The Koodaideri Iron Ore Mine will produce 43 million tonnes per annum (Mtpa) of Saleable Ore Product (SOP) as lump and fines from coarse ore feed.

In order to process coarse ore feed into saleable ore product, the Koodaideri processing plant will include facilities for crushing, screening, stockpiling and loading onto rail transport.

Mobile crushing and screening units will be required to support mine earthworks. When constructed,the Koodaideri processing plant willoperate 24 hours perday, 7 days per week.

Run of Mine (ROM) ore will be delivered by haul truck to a primary gyratory crusher located to the north west of the K58W pit. The high-grade (HG) primary crushed ore will be processed through a dry crushing and screening plant to produce HG lump and HG fines product.

Seven double-deck banana screens will provide the required production throughput and achieve the required product specifications, which will divide the ore into three strea ........


Combined production numbers are reported under Hamersley Iron Operation


Reserves at December 31, 2020:

CategoryTonnage CommodityGrade
Proven 286 Mt Iron 62.2 %
Probable 275 Mt Iron 61.3 %
Proven & Probable 561 Mt Iron 61.8 %


Heavy Mobile Equipment:
HME TypeModelQuantityRef. Date
Drill (blasthole) ....................... Subscription required ....................... Subscription required Jun 21, 2022
Truck (haul) ....................... Subscription required ....................... Subscription required Jun 21, 2022
Truck (water) ....................... Subscription required ....................... Subscription required Mar 17, 2022
Subscription required - Subscription is required.

Mine Management:

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required May 9, 2022
....................... Subscription required ....................... Subscription required Subscription required May 9, 2022
....................... Subscription required ....................... Subscription required Subscription required May 9, 2022
Subscription required - Subscription is required.

Staff:

Total WorkforceYear
Subscription required 2018

Corporate Filings & Presentations:

DocumentYear
Press Release 2022
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2019
................................... Subscription required 2019
Annual Report 2018
Press Release 2018
Technical Report 2018
Year-end Mineral Reserves 2018
Year-end Mineral Reserves 2016
Subscription required - Subscription is required.

News:

NewsDate
Rio Tinto plc: Gudai-Darri iron ore heads to port June 15, 2022
Gudai-Darri first ore postponed to 2022 October 15, 2021
Rio Tinto to trial Caterpillar haul trucks at Gudai-Darri September 15, 2021
Rio Tinto: NRW secures Gudai-Darri solar contract July 27, 2021
Rio Tinto to feature autonomous training solutions at Gudai-Darri June 22, 2021
Rio Tinto deploys world-first autonomous water trucks June 22, 2021
Rio Tinto hands $65m Koodaideri contract to SCEE November 23, 2020
Rio Tinto awards Koodaideri contract to Alltype Engineering September 21, 2020
Primero secures additional $20m contracts with Rio Tinto March 31, 2020
Primero wins major Koodaideri contract December 6, 2019
Rio Tinto and NRW boost relationship at Koodaideri May 21, 2019
Rio Tinto backs NRW for south Koodaideri railway contract May 17, 2019
Caterpillar partners with Rio Tinto to automate Koodaideri May 7, 2019
Rio Tinto to execute Koodaideri digitalisation with FLSmidth contract May 2, 2019
Rio Tinto: Clough inks deal with Rio Tinto for Koodaideri rail contract May 1, 2019
Rio Tinto awards key Koodaideri contract to WorleyParsons April 15, 2019
Rio Tinto awards $65m Koodaideri contract to NRW January 24, 2019
Rio Tinto inks $3.5 billion investment in Koodaideri November 29, 2018
Rio Tinto takes key step towards first ‘intelligent’ mine August 1, 2018