Overview
Stage | Production |
Mine Type | Open Pit |
Commodities |
|
Mining Method |
- Truck & Shovel / Loader
- Dragline
|
Production Start | ...  |
Mine Life | 24 years (as of Jan 1, 2022) |
Source:
p. 26,201
BHP Mitsubishi Alliance (BMA) is owned 50:50 by BHP and Mitsubishi Development. BMA operates coal mine Goonyella Riverside and Broadmeadow.
Contractors
- Subscription is required.
Summary:
Bituminous coal is mined from the Permian Moranbah and Rangal Coal measures. Products range from premium quality, low volatile, high vitrinite, hard coking coal to medium volatile hard coking coal, to weak coking coal, some pulverised coal injection (PCI) coal and medium ash thermal coal as a secondary product.
Rangal Coal Measures of Late Permian age, dipping 3-5° to the east. Three major coal seams are present: Top (Aries) - 0.8-1.5m; Middle (Castor) - 2-3.5m; Main Lower (Taurus/Argo) - 5-7m. Complex seam splitting occurs along the 35km strike length of the mine.
Mining Methods
- Truck & Shovel / Loader
- Dragline
Summary:
Blackwater is open-cut, using dragline and truck and shovel fleets for overburden removal.
Source:
Summary:

- subscription is required.
Production:
Commodity | Units | 2022 | 2021 | 2020 | 2019 | 2018 | 2017 | 2016 |
Coal (metallurgical)
|
kt
| ......  | ......  | ......  | ......  | 13,376 | 14,592 | 15,252 |
All production numbers are expressed as clean coal.
- Subscription is required.
Reserves at June 30, 2022:
Cut-off criteria:
Coal Resources: OC - 0.3m seam thickness, core yield =50% and <40% raw ash.
Coal Resources: UG - 2.0m seam thickness, core yield =50% and <40% raw ash.
Coal Reserves: OC - 0.3m seam thickness.
Coal Reserves: UG - 2.0m seam thickness.
Category | OreType | Tonnage | Commodity | Marketable Coal |
Proven
|
In-Situ (OP)
|
147 Mt
|
Coal (metallurgical & thermal)
|
128 Mt
|
Probable
|
In-Situ (OP)
|
225 Mt
|
Coal (metallurgical & thermal)
|
191 Mt
|
Proven & Probable
|
In-Situ (OP)
|
372 Mt
|
Coal (metallurgical & thermal)
|
319 Mt
|
Measured
|
In-Situ (OP)
|
322 Mt
|
Coal (metallurgical & thermal)
|
|
Indicated
|
In-Situ (OP)
|
528 Mt
|
Coal (metallurgical & thermal)
|
|
Inferred
|
In-Situ (OP)
|
779 Mt
|
Coal (metallurgical & thermal)
|
|
Inferred
|
In-Situ (UG)
|
222 Mt
|
Coal (metallurgical & thermal)
|
|
Total Resource
|
In-Situ (OP)
|
1,628 Mt
|
Coal (metallurgical & thermal)
|
|
Total Resource
|
In-Situ (UG)
|
222 Mt
|
Coal (metallurgical & thermal)
|
|
HME Type | Model | Quantity | Leased or Contractor | Ref. Date |
Bulldozer
|
.......................
|
.......................
|
|
Mar 2, 2020
|
Excavator
|
.......................
|
|
|
Dec 31, 2021
|
Excavator
|
.......................
|
|
|
Dec 31, 2021
|
Excavator
|
.......................
|
|
|
Dec 31, 2021
|
Truck (haul)
|
.......................
|
|
|
Dec 31, 2021
|
Truck (haul)
|
.......................
|
|
|
Dec 31, 2021
|
- Subscription is required.
Corporate Filings & Presentations:
- Subscription is required.
- Subscription is required.