Blackwater Mine

Click for more information

Categories

Summary

Mine TypeOpen Pit
StatusActive
Commodities
  • Coal (metallurgical)
  • Coal (thermal)
  • Coal (coking)
Mining Method
  • Truck & Shovel / Loader
  • Dragline
Production Start1967
Mine Life2075
SnapshotThe Blackwater open-cut coal mine is one of the largest producing metallurgical coal mines in Queensland with a strike length of 80 kilometres.

Blackwater’s current operation has 8 separate pits with the largest dragline fleet in the southern hemisphere. The mine includes 2 active Train Load Out facilities with more than 16Mtpa capacity.

Blackwater produces predominantly low-ash, low-sulphur metallurgical coal products, as well as high-energy thermal coal. Coal products are exported to customers across Asia through the RG Tanna Terminal within the Port of Gladstone.

Blackwater has the capacity to pursue expansion options considered in the LOM plan.

Owners

SourceSource
CompanyInterestOwnership
JFE Steel Corp. 10 % Indirect
Nippon Steel Corporation 20 % Indirect
Whitehaven Coal Ltd. 70 % Indirect
On 31 March 2025, Whitehaven Coal Ltd. completed its sale of a 20% and 10% joint venture interest in the Blackwater coal mine to Nippon Steel Corporation and JFE Steel Corporation respectively.

Contractors

ContractorContractDescriptionRef. DateExpirySource
BUMA Australia Mining On April 17 2024, BUMA Australia signed a new contract with Whitehaven Coal, the new owner of the Blackwater mine. BUMA Australia will continue to provide pre-strip mining services at Blackwater Mine in Central Queensland until June 2026. Apr 17, 2024 2026

Deposit type

  • Sedimentary

Summary:

Bituminous coal is mined from the Permian Moranbah and Rangal Coal measures. Products range from premium quality, low volatile, high vitrinite, hard coking coal to medium volatile hard coking coal, to weak coking coal, some pulverised coal injection (PCI) coal and medium ash thermal coal as a secondary product.

Rangal Coal Measures of Late Permian age, dipping 3-5° to the east. Three major coal seams are present: Top (Aries) - 0.8-1.5m; Middle (Castor) - 2-3.5m; Main Lower (Taurus/Argo) - 5-7m. Complex seam splitting occurs along the 35km strike length of the mine.

Reserves at July 31, 2025



Mineral Resources are reported inclusive of Mineral Reserves.
CategoryOre TypeTonnage CommodityMarketable Coal
Proven Total 100 Mt Coal (metallurgical & thermal) 88 Mt
Probable Total 91 Mt Coal (metallurgical & thermal) 80 Mt
Proven & Probable Total 191 Mt Coal (metallurgical & thermal) 169 Mt
Measured In-Situ (OP) 288 Mt Coal (metallurgical & thermal)
Indicated In-Situ (OP) 528 Mt Coal (metallurgical & thermal)
Measured & Indicated In-Situ (OP) 816 Mt Coal (metallurgical & thermal)
Inferred In-Situ (OP) 779 Mt Coal (metallurgical & thermal)
Inferred In-Situ (UG) 222 Mt Coal (metallurgical & thermal)
Total Resource In-Situ (OP) 1,595 Mt Coal (metallurgical & thermal)

Mining Methods

  • Truck & Shovel / Loader
  • Dragline

Summary:

Mining at Blackwater is undertaken using a conventional multi-seam dragline strip methodology.

Blackwater includes 8 separate pits within its operation with the largest dragline fleet in the southern hemisphere.

Draglines are employed in multiple simultaneous pits along strike in conjunction with a large fleet of trucks, electric rope shovels, hydraulic excavators and dozers. A separate contract fleet supports pre-strip activities.

Whiteheaven is planning to open up additional mining areas in the south to provide greater flexibility and improve dragline performance.

Blackwater has capacity to pursue expansion options considered in LOM plan.

Blackwater asset improvement (2023) includes:
- Optimisation of existing dragline sequence and pre-strip to allow access to latent dragline capacity;
- Increasing of dozer push volumes.

In FY2025 following the rebuild of blasted inventory levels, the work to rebuild pre-strip inventories continues to progress.

Heavy Mobile Equipment

HME TypeModelQuantityLeased or
Contractor
Ref. DateSource
Dozer (crawler) Caterpillar D10 4 Leased Sep 26, 2025
Dozer (crawler) Caterpillar D11 5 Leased Sep 26, 2025
Dragline 7 Leased Oct 31, 2023
Excavator Hitachi EX8000 1 Leased Sep 26, 2025
Excavator Hitachi EX3600 1 Leased Sep 26, 2025
Excavator Caterpillar 6060 3 Leased Sep 26, 2025
Grader Caterpillar 16M 1 Leased Sep 26, 2025
Grader Caterpillar 18M 3 Leased Sep 26, 2025
Truck (haul) Komatsu 930E 13 Leased Sep 26, 2025
Truck (haul) Caterpillar 789 15 Leased Sep 26, 2025
Truck (water) Caterpillar 785 4 Leased Sep 26, 2025

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

  • CHPP
  • Wash plant

Summary:

Impurities are removed through washing and treatment at a coal handling and preparation plant. Coal is then transported by train to port, loaded onto ships and exported to customers.

Blackwater mine produces high quality metallurgical coal for the seaborne export market:
– low-ash (8.5-9.5%),
- low-sulphur (0.40-0.42%),
- metallurgical coal (HCC, SSCC),
– export quality thermal coal.

Water Supply

Summary:

At Blackwater, Whitehaven's water allocation licence is 2,281 ML.

Commodity Production

CommodityUnits20252024202320222021202020192018201720162015
Coal (thermal) t 550,892251,464
Coal (coking) t 10,463,7759,850,576
Coal (metallurgical & thermal) kt 10,11011,66812,44811,09013,20613,37614,59215,25213,988
All production numbers are expressed as clean coal.

Operational metrics

Metrics2025202420232022202120202019201820172016
Coal tonnes mined 14,179,661 t12,569,179 t12,510,615 t14,288,329 t15,216,273 t12,893,485 t15,261,759 t13,678,878 t16,581,448 t16,524,952 t
Tonnes processed 13,430,907 t12,657,363 t12,675,240 t13,574,663 t14,455,742 t12,744,977 t15,262,320 t14,598,569 t16,097,035 t16,277,870 t

Production Costs

Commodity production costs have not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
CHPP Maintenance Superintendent Grant Collins LinkedIn Sep 27, 2025
General Manager Tod Mathews LinkedIn Sep 27, 2025
Maintenance Manager Ed Cleary LinkedIn Sep 27, 2025
Mine Scheduling Superintendent Peter Rodrigues LinkedIn Sep 27, 2025
Regional General Manager Dan Iliffe LinkedIn Sep 27, 2025

Workforce

Total WorkforceYear
2,000 2025
2,000 2024
2,803 2023
1,554 2022
1,554 2021
1,554 2020
369 2017
910 2016

Aerial view: