Overview
Stage | Production |
Mine Type | Open Pit |
Commodities |
- Coal (M/T)
- Coal (metallurgical)
|
Mining Method |
- Truck & Shovel / Loader
- Dragline
|
Processing |
|
Mine Life | 25 years (as of Jan 1, 2021) |
Latest News | Downer awards contract to SRG Global at BMA mine October 18, 2018 |
Source:
p. 25,233
BMA is owned 50:50 by BHP and Mitsubishi Development. BMA operates coal mine Blackwater.
Summary:
Bituminous coal is mined from the Permian Moranbah and Rangal Coal measures. Products range from premium quality, low volatile, high vitrinite, hard coking coal to medium volatile hard coking coal, to weak coking coal, some pulverised coal injection (PCI) coal and medium ash thermal coal as a secondary product.
Rangal Coal Measures of Late Permian age, dipping 3-5° to the east. Three major coal seams are present: Top (Aries) - 0.8-1.5m; Middle (Castor) - 2-3.5m; Main Lower (Taurus/Argo) - 5-7m. Complex seam splitting occurs along the 35km strike length of the mine.
Mining Methods
- Truck & Shovel / Loader
- Dragline
Summary:
Blackwater is open-cut, using dragline and truck and shovel fleets for overburden removal.
Source:
Summary:
Impurities are removed through washing and treatment at a coal handling and preparation plant. Coal is then transported by train to port, loaded onto ships and exported to customers.
Production:
Commodity | Units | 2021 | 2020 | 2019 | 2018 | 2017 | 2016 | 2015 |
Coal (metallurgical)
|
kt
| ......  | ......  | ......  | 13,376 | 14,592 | 15,252 | 13,988 |
All production numbers are expressed as clean coal.
- Subscription is required.
Reserves at June 30, 2021:
Cut-off criteria:
Coal Resources: OC - 0.3m seam thickness, core yield =50% and <40% raw ash.
Coal Reserves: OC - 0.3m seam thickness.
Category | OreType | Tonnage | Commodity | Marketable Coal |
Proven
|
In-Situ (OP)
|
161 Mt
|
Coal (M/T)
|
140 Mt
|
Probable
|
In-Situ (OP)
|
225 Mt
|
Coal (M/T)
|
191 Mt
|
Proven & Probable
|
In-Situ (OP)
|
386 Mt
|
Coal (M/T)
|
331 Mt
|
Measured
|
In-Situ (OP)
|
335 Mt
|
Coal (M/T)
|
|
Indicated
|
In-Situ (OP)
|
528 Mt
|
Coal (M/T)
|
|
Inferred
|
In-Situ (OP)
|
779 Mt
|
Coal (M/T)
|
|
Inferred
|
In-Situ (UG)
|
222 Mt
|
Coal (M/T)
|
|
Total Resource
|
In-Situ (OP)
|
1,642 Mt
|
Coal (M/T)
|
|
Total Resource
|
In-Situ (UG)
|
222 Mt
|
Coal (M/T)
|
|
Corporate Filings & Presentations:
Document | Year |
...................................
|
2021
|
...................................
|
2020
|
...................................
|
2020
|
...................................
|
2019
|
...................................
|
2019
|
Annual Report
|
2018
|
Annual Report
|
2017
|
Annual Report
|
2016
|
Annual Report
|
2015
|
Other
|
2003
|