Overview
Stage | Production |
Mine Type | Open Pit |
Commodities |
- Copper
- Gold
- Silver
- Molybdenum
|
Mining Method |
|
Production Start | ...  |
Mine Life | 40 years (as of Jan 1, 2021) |
Bozshakol is an open pit mine consisting of two pits. |
Source:
Company | Interest | Ownership |
Nova Resources B.V.
|
100 %
|
Indirect
|
KAZ Minerals Bozshakol LLC
(operator)
|
100 %
|
Direct
|
KAZ Minerals has been wholly acquired by Nova Resources BV to support the Company’s pursuit of a capital-intensive strategy focused on long-term growth.
KAZ Minerals Bozshakol LLC is a wholly-owned subsidiary of KAZ Minerals.
Contractors
- Subscription is required.
Summary:
Bozshakol is a porphyry copper deposit, typical of the calc-alkaline I-granite series associated with ancient island arcs common in Kazakhstan.
Summary:
Mining is a standard drill, blast, truck and shovel operation delivering.
Source:

- subscription is required.
Flow Sheet:
Summary:

- subscription is required.
Reserves at December 31, 2021:
Category | Tonnage | Commodity | Grade |
Proven & Probable
|
974 Mt
|
Copper
|
0.33 %
|
Proven & Probable
|
974 Mt
|
Gold
|
0.16 g/t
|
Proven & Probable
|
974 Mt
|
Silver
|
1 g/t
|
Proven & Probable
|
974 Mt
|
Molybdenum
|
0.007 %
|
Indicated
|
1,128 Mt
|
Copper
|
0.34 %
|
Indicated
|
1,128 Mt
|
Gold
|
0.16 g/t
|
Indicated
|
1,128 Mt
|
Silver
|
1.1 g/t
|
Indicated
|
1,128 Mt
|
Molybdenum
|
0.007 %
|
Inferred
|
75 Mt
|
Copper
|
0.34 %
|
Inferred
|
75 Mt
|
Gold
|
0.12 g/t
|
Inferred
|
75 Mt
|
Silver
|
1.1 g/t
|
Inferred
|
75 Mt
|
Molybdenum
|
0.01 %
|
Corporate Filings & Presentations:
- Subscription is required.
- Subscription is required.