Overview
Stage | Production |
Mine Type | Underground |
Commodities |
|
Mining Method |
|
Production Start | ... |
The Mettiki Complex comprises the Mountain View mine located in Tucker County and a preparation plant located near the city of Oakland in Garrett County.
The Mountain View mine produces low/medium-sulfur coal, which is transported by truck either to the Mettiki (MD) preparation plant for processing for shipment into the metallurgical coal market or otherwise, or directly to the coal blending facility at the Virginia Electric and Power Company Mt.Storm Power Station. Coal processed at the preparation plant can be trucked to the blending facility at Mt.Storm or shipped via the CSX railroad, which provides the opportunity to ship into the domestic and international thermal and metallurgical coal markets. |
Source:
p. 8,22,388
Mettiki Coal (WV), LLC. owns and operates the Mountain View Mine. Mettiki Coal (WV), LLC. is a wholly-owned indirect subsidiary of Alliance Resource Partners L.P.
Contractors
- Subscription is required.
Summary:
The Mountain View is an underground mine, a part of The Mettiki Complex ("Mettiki") which comprises the Mountain View mine and the Mettiki Coal preparation plant located near the city of Oakland in Garrett County, Maryland.
Mountain View mine is intersected by one shaft opening, three slope openings, and one elevator located in the intake shaft. Total seam height averages 8 to 9 feet with an entry width of 16 feet. The mine utilizes an exhaust ventilation system utilizing two main fans and a longwall bleeder fan.
The Mountain View Mine has one longwall and three longwall developing sections utilizing three continuous mining machines with shuttle car haulage. The mine works on three shift per day (two shifts of production and one maintenance shift), 5 to 6 production days per week. The mine produces an average of 16,000 tons of raw material daily. No detectable amount of methane is liberated from this mine on a daily basis. The Mountain View Mine has not had any reportable face ignitions.
Source:
Summary:
- subscription is required.
Reserves at December 31, 2023:
Category | Tonnage | Commodity |
Proven
|
9.1 M tons
|
Coal (thermal)
|
Probable
|
0.4 M tons
|
Coal (thermal)
|
Proven & Probable
|
9.5 M tons
|
Coal (thermal)
|
Measured
|
4.1 M tons
|
Coal (thermal)
|
Indicated
|
4.4 M tons
|
Coal (thermal)
|
Measured & Indicated
|
8.5 M tons
|
Coal (thermal)
|
Inferred
|
0.2 M tons
|
Coal (thermal)
|
Total Resource
|
8.7 M tons
|
Coal (thermal)
|
HME Type | Model | Quantity | Ref. Date | Source |
Continuous Miner
|
|
.......................
|
Jan 13, 2017
|
|
Longwall mining unit
|
|
.......................
|
Jan 13, 2017
|
|
Shearer
|
.......................
|
|
Dec 31, 2023
|
p.29
|