Overview

Mine TypeOpen Pit
StagePreliminary Economic Assessment
Commodities
  • Zinc
  • Lead
  • Silver
Mining Method
  • Truck & Shovel / Loader
Mine Life... Lock
SnapshotThe Project includes the Nash Creek mineral deposit located approximately 50 km by road northwest of the town of Bathurst, NB and the Superjack mineral deposit located approximately 45 km by road southwest of Bathurst, NB.

Owners

SourceSource
CompanyInterestOwnership
Callinex Mines Inc. 100 % Indirect
The Nash Creek and Superjack Properties which comprise the Project, are 100% owned by Callinex.

Contractors

Lock

- subscription is required.

Deposit type

  • VMS
  • Breccia pipe / Stockwork
  • Stratabound
  • Vein / narrow vein

Summary:

The white smoker deposit model is proposed for the Nash Creek deposit, in contract to a traditional black smoker deposit. These deposits types are described below.

Sulphide mineralization at Nash Creek includes pyrite, sphalerite, galena and minor chalcopyrite. Silver consistently accompanies the sulphides, possibly the result of argentiferous galena or presence of a silver rich sulphosalt. Sulphide concentrations of potential economic interest occur as: 1) stratabound and/or laterally continuous zones of matrix filling or replacement style mineralization within coarse to fine grained pyroclastic deposits of both mafic and felsic affinity; 2) fracture filling, stringer or vein arrays mainly within competent flow units or flow breccia; and 3) discrete breccia zones (e.g., flow breccia, autobrecciation, etc.). Strong intraclast chlorite mineralization is associated with concentrations of zinc and lead in the brecciated mafic rocks.

Moderate to intense clay alteration and silicification are common in the mineralized zones and broader zones of strong carbonate, hematite and potassium alteration occur in footwall, and occasionally hangingwall, to mineralized host rocks. Mineralization occurs as multiple stacked zones of laterally extensive pyroclastic units and flow top rubble zones which are cross cut locally by north, northeast and northwest trending structures that may have acted as pathways for mineralized hydrothermal fluids (Cullen and Barr, 2005).

Four zones hosting stratabound mineralization have been identified on the Nash Creek Property by previous workers. These four zones are, roughly from north to south, the MacMillan, Hickey and Hayes zones and to the east, the Central Zone. Drilling completed by Callinex in 2017 has extended the Hickey Zone to the north.

Mineral resource estimates have been stated for the Hickey and Hayes zones. Walker, 2006 describes the Superjack A Zone as two subparallel, easterly thickening, massive sulphide lenses that strike approximately east-northeast and dip about 80°N. The larger, northern lens has a strike length of approximately 380 m and extends downdip for about 280 m, where intersections of 8.93% Zn over 9.75 m have been reported (McAllister 1960; Mitton 1994). Sulphide intersections in the western end of the deposit are between 0.3 m and 3 m in thickness. Massive sulphides in the deposit are dominated by pyrite but include subordinate pyrrhotite, sphalerite, galena, and chalcopyrite. In the western part of the Superjack A Zone, massive sulphides are immediately overlain by basalt and are underlain by an approximate 20 m thick sericite- or chlorite-altered zone of tuffaceous sedimentary rocks cute by quartz-sulphide veins.

In drill logs, the massive sulphides at the A Zone are described as fine-grained, containing predominantly pyrite with intermittent bands of sphalerite and galena throughout, as well as intermittent disseminated sphalerite and galena throughout. The massive zones occasionally contain quartz-chloritic flooding (<1%). Medium-grained blebby chalcopyrite can frequently be observed at both the upper and lower contacts of the massive zones. The sulphides are locally magnetic due to disseminated pyrrhotite. Stringer sulphides, interpreted as stockwork zones, occur mainly on the footwall, but occasionally on the hanging wall as well; this repeating is likely due to local fold patterns. They are hosted by banded argillite and/or sericite schist. Mineralization at the B and C zones is described very similarly to that in the A Zone. Both contain pyrite-dominated massive sulphides with intermittent sphalerite-galena banding/disseminations. The B Zone contains fewer and thinner stringer sulphide zones than both the A and C zones.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

CommodityProductUnitsAvg. AnnualLOM
Zinc Metal in concentrate M lbs 77768
Zinc Concentrate kt 647
Lead Metal in concentrate M lbs 15146
Lead Concentrate kt 132
Silver Metal in concentrate M oz 0.44.4

Operational metrics

Metrics
Daily mining rate 29,000 t *
Daily ore mining rate 3,900 t *
Daily processing capacity 3,900 t *
Annual processing capacity 1,425,000 t *
Stripping / waste ratio 6.7 *
Waste tonnes, LOM 92,925 kt *
Ore tonnes mined, LOM 14,427 kt *
Total tonnes mined, LOM 107,352 kt *
Tonnes processed, LOM 14,427 kt *
* According to 2018 study.

Production Costs

CommodityAverage
Total cash costs Zinc 0.3 / lb * **  CAD
All-in sustaining costs (AISC) Zinc 0.37 / lb * **  CAD
Assumed price Lead 1.1 / lb *  USD
Assumed price Zinc 1.25 / lb *  USD
Assumed price Silver 17 / oz *  USD
* According to 2018 study / presentation.
** Net of By-Product.

Operating Costs

Currency2018
OP mining costs ($/t mined) CAD  ....  Subscribe
OP mining costs ($/t milled) CAD  ....  Subscribe
Total operating costs ($/t milled) CAD  ....  Subscribe
* According to 2018 study.

Project Costs

MetricsUnitsLOM Total
Initial CapEx $M CAD  ......  Subscribe
Sustaining CapEx $M CAD  ......  Subscribe
Closure costs $M CAD  ......  Subscribe
Total CapEx $M CAD  ......  Subscribe
OP OpEx $M CAD  ......  Subscribe
Processing OpEx $M CAD 98.1
G&A costs $M CAD 25.8
Total OpEx $M CAD  ......  Subscribe
Mining Taxes $M CAD  ......  Subscribe
Income Taxes $M CAD  ......  Subscribe
Total Taxes $M CAD  ......  Subscribe
Royalty payments $M CAD  ......  Subscribe
Gross revenue (LOM) $M CAD  ......  Subscribe
EBITDA (LOM) $M CAD  ......  Subscribe
Net Income (LOM) $M CAD  ......  Subscribe
Pre-tax Cash Flow (LOM) $M CAD  ......  Subscribe
After-tax Cash Flow (LOM) $M CAD  ......  Subscribe
Pre-tax NPV @ 5% $M CAD  ......  Subscribe
Pre-tax NPV @ 8% $M CAD  ......  Subscribe
After-tax NPV @ 5% $M CAD  ......  Subscribe
After-tax NPV @ 8% $M CAD  ......  Subscribe
Pre-tax IRR, %  ......  Subscribe
After-tax IRR, %  ......  Subscribe
Pre-tax payback period, years  ......  Subscribe
After-tax payback period, years  ......  Subscribe

Required Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNamePhoneEmailProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Jun 29, 2018
....................... Subscription required ....................... Subscription required ........... Subscription required ........... Subscription required Jun 29, 2018
....................... Subscription required ....................... Subscription required ........... Subscription required Jun 29, 2018
....................... Subscription required ....................... Subscription required Subscription required Dec 30, 2023

Total WorkforceYear
...... Subscription required 2018

Aerial view:

Lock

- subscription is required.