• Data Access
  • Your Email  
  • Your Email  
Keep me signed in.
Forgot your password?
Close
  • Forgot Your Password?
  • Enter the email you signed up with and we'll email it to you.
  • Your Email  
Close
Back
MDO
Mining Data Solutions
  • Home
  • Database
  • Subscribe
  • Sign In
  • Sign In
Philippines
Taganito Mine

This page is not tailored to
devices with screen width under 750 px.
 Location:
39 km SE from Surigao, Philippines

  Address:
28th Floor NAC Tower, 32nd Street, Bonifacio Global Cit
Taguig
Philippines
1634
Phone  ...  Subscription required
Fax+63 2 892 5344
EmailEmail
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in Philippines
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Processing
  • Production
  • Reserves
  • Financials
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StageProduction
Mine TypeOpen Pit
Commodities
  • Nickel
  • Iron Ore
  • Saprolite
  • Limonite
Mining Method
  • Truck & Shovel / Loader
Production Start...
Mine Life2032
The Taganito mine produces direct shipping saprolite ore and limonite ore.


Owners

Source: p. 12,88,189,
CompanyInterestOwnership
Sojitz Corp. 1.5 % Indirect
Pacific Metals Co., Ltd. 33.5 % Indirect
Nickel Asia Corp. 65 % Indirect
Taganito Mining Corp. (operator) 100 % Direct
Company Structure: 65% Nickel Asia Corporation (Filipino) and 33.5% Pacific Metals Co. Ltd. and 1.5% Sojitz Corporation (Japanese)

Contractors

Subscription required - Subscription is required.


Deposit Type

  • Laterite


Summary:

Laterite nickel ores are a surface formation deposit which is found in hot and wet tropical areas which is enriched in iron and aluminum and develops by intensive and long lasting weathering of the underlying parent rock. Nearly all kinds of rocks can be disintegrated by the action of high rainfall and high temperatures. The dripping rain water causes suspension of primary rock minerals and decreases easily soluble elements as sodium, potassium, calcium, and silicon. This gives rise to a residual concentration of more insoluble elements predominantly iron, aluminum and nickel.


Mining Methods

  • Truck & Shovel / Loader


Summary:


Crushing and Grinding


Processing


Summary:

Taganito mine does not process mined ore. It sells the ore to customers in Japan and China. Low-grade ore is sold to Coral Bay HPAL facility and Taganito HPAL facility.


Production:

CommodityUnits2022202120202019201820172016
Saprolite wmt  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required4,567,2573,347,0933,251,780
Limonite wmt  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required
All production numbers are expressed as ore.
Subscription required - Subscription is required.

Operational Metrics:

Metrics202220212020201920182017
Ore tonnes mined  ......  Subscription required  ......  Subscription required7,656,036 wmt9,668,802 wmt8,362,951 wmt6,744,842 wmt
Subscription required - Subscription is required.

Reserves at December 31, 2022:
Cut-off grades used to estimate Ore Resources are as follows: Saprolite: > 1.22% Ni,< 20.00% Fe; Limonite: > 20.00% Fe

CategoryTonnage CommodityGradeContained Metal
Proven & Probable 81,421 kdmt Nickel 1.13 % 919 kt
Proven & Probable 81,421 kdmt Iron 34.1 %
Measured & Indicated 101,601 kdmt Nickel 1.19 % 1,211 kt
Measured & Indicated 101,601 kdmt Iron 33.33 %
Inferred 2,643 kdmt Nickel 1.4 % 37 kt
Inferred 2,643 kdmt Iron 18.73 %

Financials:

Units20222021202020192018
Capital expenditures M PHP  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required 0.4  
Revenue M PHP  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required 7.9  
Operating Income M PHP  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required 3.7  
After-tax Income M PHP  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required 3  
Subscription required - Subscription is required



Heavy Mobile Equipment:

Mine Management:

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Sep 11, 2023
....................... Subscription required ....................... Subscription required Subscription required Sep 11, 2023
....................... Subscription required ....................... Subscription required Subscription required Sep 11, 2023
....................... Subscription required ....................... Subscription required Subscription required Sep 11, 2023
Subscription required - Subscription is required.

Staff:

EmployeesContractorsTotal WorkforceYear
Subscription required 2022
Subscription required 2021
Subscription required 2020
Subscription required Subscription required Subscription required 2019

Corporate Filings & Presentations:

DocumentYear
Corporate Presentation 2023
Annual Report 2022
Annual Review 2022
Sustainability Report 2022
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2019
................................... Subscription required 2019
Annual Report 2018
Project Description 2018
Annual Report 2016
Subscription required - Subscription is required.

Subscription required - Subscription is required.

Terms of Use Privacy Policy © 2017-2023 MDO Data Online Inc.