Overview
Stage | Permitting |
Mine Type | Open Pit |
Commodities |
|
Mining Method |
|
Mine Life | 37 years (as of Jan 1, 2019) |
Mount Peake Vanadium-Titanium-Iron Project will be a long-life project producing a suite of high-quality, high-purity strategic products for global markets including vanadium pentoxide, titanium dioxide pigment and iron ore fines. The project, which is expected to be a top-10 global producer, has received Major Project Status from the Northern Territory and Federal Governments. |
Source:
p. 13,60
Company | Interest | Ownership |
TNG Ltd.
|
100 %
|
Indirect
|
The Mount Peake Project operated by Enigma Mining Ltd (Enigma), a wholly owned subsidiary of TNG Ltd.
Contractors
- Subscription is required.
Summary:
The licence areas are generally flat with some broad low ridges of silcrete or ferruginous rock formations. Broad flood plains associated with the Murray Creek which runs through the licence area are also a feature.
The project area lies within the north-central portion of the Paleoproterozoic Arunta Province. The stratigraphy of the Arunta province comprises relics of 2500 Ma Archaean basement overlain by >1800 Ma Palaeoproterozoic, turbiditic sequences of greywacke, quartz, sandstone, siltstone and shale along with mafic rocks and their highgrade metamorphic equivalents. The Arunta also has minor calc-silicates and meta-felsic volcanic units. During the Barramundi Orogeny, the sedimentary units were intruded by mafic rocks which have been deformed and in places metamorphosed to amphibolite facies. During the closing stages of the Barramundi Orogeny (~1830 Ma) granite plutons intruded rocks of the Arunta Province.
In the tenement area, rocks of the Palaeoproterozoic Lower Hatches Group/ Reynolds Range Group occur, comprising undifferentiated granite/granite gneiss and gabbro-dolerite. Neoproterozoic to Palaeozoic rocks of the Georgina Basin cover the Palaeoprotoeozoic rocks in the south to southeast. Cainozoic sediments also cover parts of the tenements. Quaternary and Tertiary cover sequences of variable depth (ranging from a few metres to in excess of 100m) conceal the basement rocks. Mafic/ ultramafic units have been recorded from previous drilling w ........

Summary:
The mining method will be an open pit with conventional drill and blast and load and haul with excavators and large mining equipment. Ore and waste will be trucked to the concentrator and waste dump respectively.
The open pit strip ratio is 1.1:1 (waste: ore). The large size of the orebody (ca. 2000m x 350m x 100m) and gradual grade boundaries allows a low 2% dilution factor to be applied, with ore loss being correspondingly low.
Source:
Flow Sheet:
Summary:

- subscription is required.
Projected Production:
Commodity | Product | Units | Avg. Annual | LOM |
V2O5
|
Flake
|
kt
| 6 | 231 |
Titanium dioxide
|
Concentrate
|
kt
| ......  | ......  |
Iron (magnetite)
|
Metal in concentrate
|
Mt
| ......  | ......  |
Iron (magnetite)
|
Concentrate
|
kt
| | ......  |
Operational Metrics:
Metrics | |
Stripping / waste ratio
| 1.1 * |
Ore tonnes mined, LOM
| 69 Mt * |
Tonnes processed, LOM
| 69 Mt * |
Annual ore mining rate
| 2 Mt * |
* According to 2019 study.
Reserves at August 11, 2019:
Ore Resource is reported using a 0.1% V2O5 cut-off.
Ore Reserve is reported using a 15% Fe cut-off.
Category | Tonnage | Commodity | Grade |
Probable
|
41.1 Mt
|
V2O5
|
0.42 %
|
Probable
|
41.1 Mt
|
Titanium dioxide
|
7.99 %
|
Probable
|
41.1 Mt
|
Iron (magnetite)
|
28 %
|
Measured
|
120 Mt
|
V2O5
|
0.29 %
|
Measured
|
120 Mt
|
Titanium dioxide
|
5.5 %
|
Measured
|
120 Mt
|
Iron (magnetite)
|
24 %
|
Indicated
|
20 Mt
|
V2O5
|
0.28 %
|
Indicated
|
20 Mt
|
Titanium dioxide
|
5.3 %
|
Indicated
|
20 Mt
|
Iron (magnetite)
|
22 %
|
Inferred
|
22 Mt
|
V2O5
|
0.22 %
|
Inferred
|
22 Mt
|
Titanium dioxide
|
4.4 %
|
Inferred
|
22 Mt
|
Iron (magnetite)
|
19 %
|
Total Resource
|
160 Mt
|
V2O5
|
0.28 %
|
Total Resource
|
160 Mt
|
Titanium dioxide
|
5.3 %
|
Total Resource
|
160 Mt
|
Iron (magnetite)
|
23 %
|
Commodity Production Costs:
| Commodity | Units | Average |
Assumed price
|
V2O5
|
USD
|
...... &nbs
|
Assumed price
|
Titanium dioxide
|
USD
|
...... &nbs
|
Assumed price
|
Iron (magnetite)
|
USD
|
...... &nbs
|
* According to 2019 study / presentation.
Operating Costs:
| Units | 2019 |
Total operating costs ($/t milled)
|
AUD
| 210 * |
* According to 2019 study.
2019 Study Costs and Valuation Metrics :
Metrics | Units | LOM Total |
Pre-Production capital costs
|
$M AUD
|
......
|
Pre-tax Cash Flow (LOM)
|
$M AUD
|
......
|
Pre-tax NPV @ 8%
|
$M AUD
|
......
|
Pre-tax IRR, %
|
|
......
|
Pre-tax payback period, years
|
|
......
|
- Subscription is required.
Mine Management:
Job Title | Name | Profile | Ref. Date |
.......................
|
.......................
|
|
Feb 23, 2023
|
- Subscription is required.
Staff:
Total Workforce | Year |
|
2019
|
Corporate Filings & Presentations:
- Subscription is required.
- Subscription is required.