Overview
Status | Temporary Suspension |
Mine Type | Open Pit |
Commodities |
|
Mining Method |
|
Production Start | ...  |
Mine Life | 2205 |
Sonshi Mine is a part of the Goa iron ore operations.
At Goa, mining was brought to a halt pursuant to the Supreme Court judgement dated 7 February 2018 directing all companies in Goa to stop mining operations with effect from 16 March 2018. |
Source:
p. 13,105,277
Contractors
- Subscription is required.
Summary:
The area surrounding the Sonshi mine is covered with laterite capping underlain by lumpy ore zone. The ore deposit at the Sonshi mine forms the northern limb of the northwest-southeast trending syncline. The formations dip 50 degrees to 60 degrees northeast. The principal deposit of the Sonshi mine comprises three distinct ore bodies that are folded into a syncline. The youngest ore body has a width of 50 metres, while the other ore bodies dip steeply to the northeast and have widths of approximately 20 metres to 25 metres. The intervening parting between the ore bodies comprised 50 metres of manganiferous clay and a 30 metre wide limonitic zone separating one ore body from the footwall phyllite. The depth extent of these bands has been outlined with deep drilling. Hematite is the major economic mineral in each of the bands.
Summary:
The open-pit mining operations at the Sonshi mine are fully mechanised. The hard laterite capping is loosened either by drilling, blasting or ripping/dozing. The soft sub-lateritic zone is excavated and transported to respective laterite, clay and ore stacks.
Source:
Summary:

- subscription is required.
Production:
Commodity | Units | 2018 | 2017 | 2016 |
Iron
|
M wmt
| 0.2 | 1.4 | 0.2 |
All production numbers are expressed as ore.
- Subscription is required.
Operational Metrics:
Metrics | 2018 | 2017 | 2016 |
Annual processing capacity
| 8.4 Mt | 8.4 Mt | 7.9 Mt |
Reserves at March 31, 2017:
Category | Tonnage | Commodity | Grade |
Proven
|
14.7 Mt
|
Iron
|
59.8 %
|
Probable
|
21.4 Mt
|
Iron
|
59.2 %
|
Proven & Probable
|
36.2 Mt
|
Iron
|
59.5 %
|
Measured
|
8.4 Mt
|
Iron
|
56.6 %
|
Indicated
|
12.1 Mt
|
Iron
|
55.8 %
|
Inferred
|
3.1 Mt
|
Iron
|
57.8 %
|
Mine Management:
Job Title | Name | Phone | Email | Profile | Ref. Date |
.......................
|
.......................
|
.......................
|
.......................
|
|
Nov 27, 2023
|
- Subscription is required.
Corporate Filings & Presentations:
- Subscription is required.
- Subscription is required.