Serbia
Timok Upper Zone Project

This page is not tailored to
devices with screen width under 750 px.
 Location:
5 km SW from Jasikovo, Serbia

  Project Contacts:
Suvaja Street 185A
Bor
Serbia
Phone  ...  Subscription required
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in Serbia
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Costs & Financials
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StageConstruction
Mine TypeUnderground
Commodities
  • Copper
  • Gold
Mining Method
  • Sub-level caving
Processing
  • Flotation
Mine Life15 years (as of Jan 1, 2017)
Latest NewsNevsun Resources Files Technical Report for the Timok Lower Zone Deposit     August 8, 2018


Owners

 
CompanyInterestOwnership
Zijin Mining Group Co., Ltd 100 % Indirect

Deposit Type

  • Epithermal
  • Breccia pipe / Stockwork


Summary:

The Timok project is located within the central zone of the Timok Magmatic Complex (TMC), in the Serbian section of the East European Carpathian Balkan Arc. The TMC has one of the highest concentrations of copper enrichment in the Tethyan Belt.

The high sulphidation epithermal (“HSE”) mineralization in the Upper Zone comprises massive sulphide, semi-massive, and also vein, stockwork, dissemination and hydrothermal breccia matrix sulphide hosted by strongly altered (advanced argillic and argillic) andesite. The HSE mineralization forms a single coherent zone at depths ranging from 400 to over 800 metres below surface. Pyrite is the dominant sulphide mineral, and the principal copper mineral is covellite with lesser enargite, bornite and chalcocite occurring in veins, hydrothermal breccias, disseminations and replacement. Gold is associated primarily with the copper sulphides.


Mining Methods

  • Sub-level caving


Summary:

This PEA is based on a Sub Level Caving (“SLC”) mining method. SLC is applicable through a wide range of geotechnical conditions and is typically used in massive, steeply-dipping orebodies with considerable strike length as at the Timok Project.

The underground mine will be developed in three phases:

1. The Exploration Decline consists of twin 5 meter x 5 meter ramps which will be driven straight for approximately 2,800 meters to 400 meters below the surface. This Exploration Decline will serve as the main access, egress and material haulage ramp for the mine. Exploration Decline construction is expected to take up to two years to complete. Once at depth, the upper portion of the orebody will be drilled perpendicular to the current drilling. This drilling will increase geotechnical knowledge and tighten up the existing mineral resources drill density.

2. Mine infrastructure and development including the first underground primary jaw crusher about half way down the orebody which will support production for the first 7.5 years. This Phase will begin upon receipt of the Exploitation License from the bottom of the Exploration Decline.

3. Sustaining mine infrastructure development which provides access to lower production levels and a second jaw crusher at the bottom of the orebody which will be utilized for the final 7.5 years of the mine life.

LOM material will be transported to surface by a staged underground conveyor system connecting to an overland conveyor to the process plant.

Primary ventilation consists of a push/pull system with a fresh air raise and a return air raise (RAR). Both raises will be installed using raise bore techniques from access off the Exploration Decline.


Crushing and Grinding


Processing

  • Flotation

Source: Subscription required

Summary:

The process plant has been designed to treat an average of 8,900 tonnes per day, equivalent to 3.25M tonnes per annum. The plant will produce a single bulk concentrate and a gold bearing pyrite rougher concentrate (“Rougher Pyrite”) which will be stored in a dedicated pyritic tailings storage facility, a separate compartmentalized subset of the larger Tailings Storage Facility.

The processing flowsheet is considered conventional and consists of primary underground crushing; underground conveyors; overland conveying to the processing plant; coarse material storage bins; SAG and ball mill comminution circuit; copper flotation comprising of rougher flotation, regrind, and three stages of cleaning; copper concentrate thickening and filtration; and pyrite rougher flotation. Other supporting systems to the process plant and site are included and generally consist of reagents storage and distribution; effluent treatment; water services which include fresh, fire, service, and proces ........

Recoveries & Grades:

CommodityParameterAvg. LOM
Copper Recovery Rate, %  ......  Subscription required
Copper Head Grade, % 2.6
Gold Recovery Rate, %  ......  Subscription required
Gold Head Grade, g/t 1.7
Subscription required - Subscription is required.

Projected Production:

CommodityUnitsLOM
Copper M lbs 2,105
Gold oz  ......  Subscription required
All production numbers are expressed as payable metal.

Operational Metrics:

Metrics
Waste tonnes, LOM  ......  Subscription required
Ore tonnes mined, LOM  ......  Subscription required
Total tonnes mined, LOM  ......  Subscription required
Daily processing capacity  ......  Subscription required
Annual processing capacity  ......  Subscription required
* According to 2017 study.

Reserves at December 31, 2017:

CategoryTonnage CommodityGradeContained Metal
Measured 2.2 Mt Copper 8.6 % 0.19 Mt
Measured 2.2 Mt Gold 5.7 g/t 0.4 M oz
Indicated 26.6 Mt Copper 3.3 % 0.87 Mt
Indicated 26.6 Mt Gold 2.1 g/t 1.8 M oz
Measured & Indicated 28.7 Mt Copper 3.7 % 1.05 Mt
Measured & Indicated 28.7 Mt Gold 2.4 g/t 2.2 M oz
Inferred 13.9 Mt Copper 1.6 % 0.23 Mt
Inferred 13.9 Mt Gold 0.9 g/t 0.42 M oz

Commodity Production Costs:

CommodityUnitsAverage
C1 cash costs Copper USD 1.02 / lb *
C3 fully allocated costs Copper USD 1.59 / lb *
Assumed price Copper USD 3 / lb *
Assumed price Gold USD 1,300 / oz *
* According to 2017 study / presentation.

Operating Costs:

Units2017
UG mining costs ($/t milled) USD 18.6 *
Processing costs ($/t milled) USD  ......  Subscription required
Total operating costs ($/t milled) USD  ......  Subscription required
* According to 2017 study.
Subscription required - Subscription is required.

2017 Study Costs and Valuation Metrics :

MetricsUnitsLOM Total
Initial CapEx $M USD  ......  Subscription required
Sustaining CapEx $M USD  ......  Subscription required
Closure costs $M USD  ......  Subscription required
UG OpEx $M USD  ......  Subscription required
Processing OpEx $M USD 424
Total OpEx $M USD  ......  Subscription required
Gross revenue (LOM) $M USD  ......  Subscription required
Pre-tax Cash Flow (LOM) $M USD  ......  Subscription required
After-tax NPV @ 8% $M USD  ......  Subscription required
After-tax IRR, %  ......  Subscription required
After-tax payback period, years  ......  Subscription required
Subscription required - Subscription is required.

Heavy Mobile Equipment:

Subscription required - Subscription is required.


Corporate Filings & Presentations:

DocumentYear
................................... Subscription required 2018
Preliminary Economic Assessment 2017
Preliminary Economic Assessment 2017
Subscription required - Subscription is required.

News:

NewsDate
Nevsun Resources Files Technical Report for the Timok Lower Zone Deposit August 8, 2018
Nevsun Resources Realeses PFS for Timok Upper Zone Project March 29, 2018

Subscription required - Subscription is required.

Terms of Use Privacy Policy © 2020 MDO Data Online Inc.