Mining Intelligence and News
Zimbabwe

Shamva Mine

Click for more information

Categories

Overview

Mine TypeUnderground
StatusActive
Commodities
  • Gold
Mining Method
  • Sub-level open stoping (SLOS)
  • Longhole stoping
  • Underhand stoping
Production Start... Lock
Mine Life... Lock
SnapshotShamva Underground Gold Mine reopened in April 2020 since closure in January 2019.

Today (2023) Shamva is producing 45 000 tonnes of ore per month, a figure that was last achieved in 1910.

Shamva is expecting to invest a total US$126 million in peak funding for the Shamva Hill open pit project. This is quite a big project. That extensive capital input, a significant proportion of it is going into developing a 220 000 tonnes per month processing facility together with a tailing storage plant.

June, 2023 - The Shamva Hill open pit is expected to be fully functional in two years. The project itself has an expected life of 14 years, producing an annual gold production of 2,6 tonnes per year.

Owners

SourceSource
CompanyInterestOwnership
Kuvimba Mining House (Pvt) Ltd. 100 % Indirect
The government holds a 65% stake in Kuvimba Mining House (Pvt) Ltd., which bought Shamva mine from Metallon in 2020 as part of a rush of mine asset acquisitions.

Deposit type

  • Hydrothermal

Summary:

Shamva Mine is situated in the Shamva greenstone belt and exploits numerous orebodies which occur within a 300- to 400-m wide Riedel-type shear system. The sub-vertical orebodies are indistinguishable from the host rocks. Mineralisation within the orebodies consists predominantly of pyrite (>90%) with minor sphalerite, galena, chalcopyrite, pyrrhotite and arsenopyrite. Gold is found in contact with the sulphides, often in fractures, and varies significantly in grain size with visible gold commonly intersected in development and underground drilling. Silver occurs with the gold and represents some 50% of gold content.

Simplified Deposit Type - Hydrothermal.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

CommodityUnits20232022 *2021 *20162015
Gold koz  ....  Subscribe  ....  Subscribe  ....  Subscribe2125
* Average annual production reported in 2021 ^ Guidance / Forecast.

Operational metrics

Metrics2016
Ore tonnes mined
Annual milling capacity 396 kt

Production Costs

Commodity production costs have not been reported.

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Sep 27, 2023
....................... Subscription required ....................... Subscription required Subscription required Sep 27, 2023
....................... Subscription required ....................... Subscription required Subscription required Sep 27, 2023
....................... Subscription required ....................... Subscription required Subscription required Sep 27, 2023

EmployeesContractorsTotal WorkforceYear
...... Subscription required ...... Subscription required ...... Subscription required 2022
...... Subscription required 2021

Aerial view:

Lock

- subscription is required.