Burkina Faso
Wahgnion Mine

This page is not tailored to
devices with screen width under 750 px.
 Location:
73 SW from Banfora, Burkina Faso

  Address:
Avenue Gerard Kango Ouedraogo/Secteur 15
Ouagadougou
Burkina Faso
01 Bp 1334
Phone  ...  Subscription required
Fax+226-2537-4197
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in Burkina Faso
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Costs & Financials
  • Fleet
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StageProduction
Mine TypeOpen Pit
Commodities
  • Gold
Mining Method
  • Truck & Shovel / Loader
Processing
  • Carbon re-activation kiln
  • Hydrochloric acid (reagent)
  • Dewatering
  • Agitated tank (VAT) leaching
  • Carbon in leach (CIL)
  • AARL elution
  • Carbon adsorption-desorption-recovery (ADR)
  • Solvent Extraction & Electrowinning
  • Cyanide (reagent)
Mine Life10 years (as of Jan 1, 2021)
Since commercial production was achieved, Wahgnion’s processing plant has performed ~25% above nameplate capacity for throughput and gold recovery.
Latest NewsEndeavour Shareholders Vote Overwhelmingly in Favour of The Arrangement Agreement with Teranga     January 21, 2021


Owners

Source: p. 64
CompanyInterestOwnership
Government of Burkina Faso 10 % Indirect
Endeavour Mining plc 90 % Indirect
The Wahgnion Mining License is 90% owned through Endeavour’s Burkinabe subsidiary, Wahgnion Gold Operations SA (“WGO”) (Burkina Faso government owns the remaining 10%).

Deposit Type

  • Hydrothermal
  • Breccia pipe / Stockwork
  • Vein / narrow vein


Summary:

Mineralization at the Wahgnion Gold project is structurally controlled and is widely associated with hematite, iron carbonate, sericite, pyrite and locally, with albitic alteration. Higher gold grades are commonly associated with stylolitic laminated quartz veins or pyrite veinlets. Coarse- grained gold is found in fractures within pyrite veins or in quartz-carbonate vein selvages. Mineralization is predominantly of a lode-style gold type, associated with discrete structures. The mineralization is interpreted to have formed from the same mineralizing system, with variations in style reflecting the difference in local lithological and structural settings.

Nogbele Deposit
Basement exposure in the Nogbele area is generally poor, with outcrop information limited to occasional exposure in shallow creek beds, shallow mining pits, road cuts, and quartz vein outcrop. Surficial regolith varies from a shallow residual granitic profile to a competent laterite ferricrete ridge that traces the contact of the Nogbele pluton and the host rocks in the Nogbele North area.

The Nogbele area is underlain by a package of metamorphosed and variably deformed volcano- sedimentary units and three distinct suites of intrusive rocks. A foliation or lineation is well developed in the oldest of the granitoids and the sedimentary rocks but is absent from the two younger granitoids.

Extensive packages of variably deformed and metamorphosed volcano-sedimentary rocks are the oldest rocks in the Nogbele area and include: Massive fine-grained mafic volcanic flows, tuffs and volcanic siltstones with few remaining primary textures; finely bedded mafic volcanic siltstones, sandstones, and possible tuffs in which centimetre-scale bedding is still well preserved and a variety of plagioclase-porphyritic rocks of intermediate to siliceous composition, which are interlayered with the more mafic lithologies listed above.

A large pluton of massive, medium to coarse grained, equigranular, and relatively leucocratic biotite granite forms bedrock in the Nogbele Central area. A broad halo of pegmatite and aplite dykes surrounds the northwest side of the granite pluton, where the upper contact of the pluton dips the shallowest. The moderate to steeply dipping margins of the main granite pluton, as well as the dyke in the Nogbele Northwest area, are surrounded by narrower halos of pegmatite and aplite dykes. Dykes of biotite granite, pegmatite, and aplite cut across the foliation in the adjacent volcanosedimentary rocks, as well as the lineation in the deformed biotite granitoids.

An extensive pluton of massive, equigranular, medium-grained, hornblende-biotite-epidote bearing quartz diorite-tonalite forms bedrock in the Nangolo area.

Fourkoura Deposit
The Fourkoura deposit is located in the south-central Wahgnion Gold project area, six kilometres to the southeast of the Nogbele deposit. There is limited but useful outcrop at the Fourkoura deposit, however, good structural information is available from a series of shallow artisanal pits.

The Fourkoura deposit is located on a north-northeast trending shear zone within a quartz-gabbro unit that intrudes a volcano-sedimentary package. There are two distinct areas of mineralization observed at Fourkoura:

- Northern Zone: The northern zone of mineralization is essentially a lens shaped lode dipping approximately 40° to the west-northwest. The lens is moderately plunging to the northeast and remains open down plunge. Significant mineralization is formed on the sheared contact and within a narrow granitoid unit, with sheared volcanics on the footwall. Near the southern end of the northern lode, more diffuse mineralization is hosted within a quartz-gabbro body. There are two discrete hanging wall lodes present.
- Southern Zone: Mineralization hosted entirely within a quartz-gabbro unit is more northerly striking, with multiple lodes defining the deposit. Continuity on the structures is not as well defined and it is likely that mineralization is being controlled by crosscutting features that are poorly defined by current drilling. Mineralization is currently still open to the south.

Stinger Deposit
The Stinger deposit is hosted by dioritic, granitoid, and mafic metavolcanic rocks located within largely coincident swarms of diorite and granitoid dykes, both of which cut the older Birimian mafic volcanic country rocks. Diorite dykes and elongate plugs form the earlier swarm, whereas a more extensive and in-part coincident swarm of granitoid dykes form the later swarm. The intrusive margins of these dykes are the most widespread penetrative structure within the Stinger deposit, and one of three features that defined the structural grain of the rocks at Stinger prior to mineralization. Weak foliation and bedding within the Birimian mafic volcanic rocks also contribute to the structural grain of rocks at the Stinger deposit.

Intrusive contacts, foliation, and bedding in the southwest part of the deposit strike northeast and dip steeply, more commonly towards the northwest. Dykes in the central part of the deposit tend to strike north-northeast rather than northeast. A wider range of dips are also apparent, suggesting folding of the dykes about gently northeast or southwest plunging axes.

Samavogo Deposit
Samavogo is located in the northeast part of the Wahgnion Gold project area, approximately 18 km to the northeast of the Nogbele deposit. The Samavogo deposit is associated with a northeast trending shear zone that cuts volcanic rocks and occurs along the western contact of an early tonalite/quartz-diorite intrusion. It appears that the granitoid has been thrust into a hanging wall position and the current interpretation is that the contact is tectonic. A series of discrete structures are essentially parallel to the local amphibolite facies metamorphic fabric, and the mineralization is associated with movement on these faults.


Mining Methods

  • Truck & Shovel / Loader


Summary:

The Wahgnion Mine is a conventional open pit mine, with several pits of varying sizes. The operations consist of five main regions: Nogbele North, Nogbele South, Fourkoura, Stinger, and Samavogo. Gold mineralization occurs in the laterite, saprolite, transition, and primary weathering horizons. Laterite and saprolite are assumed to be free digging material, whereas transition and primary material will be mined via drill and blast cycles.

Mining is by way of conventional open pit mining techniques using drill and blast as required with material movement by hydraulic excavators and trucks. The mine scale suits 90 tonne class excavators in a backhoe configuration matched to 50 tonne payload class mining haul trucks and 40 tonne payload articulated haul trucks. An extensive RC drill program is conducted to supplement the production blast hole sampling as part of the grade control strategy. WGO own and operate a significant portion of the mining fleet, which has been supplemented by contractor mining utilizing SFTP for the satellite deposits, commencing with Foukoura. Due to the nature of the mineralisation, there are multiple small pits which require careful planning and consideration for aspects such as sequencing (of pits), staging (of cutbacks), waste dump location and potential for backfilling of depleted pits.


Crushing and Grinding
Flow Sheet: Source
Crusher / Mill TypeModelSizePowerQuantity
Jaw crusher 1
Pebble crusher 1
SAG mill 1
Ball mill 1

Summary:

CRUSHING CIRCUIT
RoM ore will be loaded into the RoM bin by direct tipping from the mining trucks or by FEL from the stockpiles. A grizzly will be fitted to the RoM bin to protect the downstream equipment from oversize material and will be inclined for easy removal of oversize to minimize stoppages. A rock breaker will be utilized to break oversize rocks on the grizzly or RoM pad.

RoM ore will be drawn from the RoM bin at a controlled rate by a variable speed apron feeder and will discharge onto a vibrating grizzly. The grizzly oversize will report to the jaw crusher. The crusher product and grizzly undersize will discharge onto the primary crusher discharge conveyor feeding directly to the crushed ore stockpile.

Under normal operating conditions, the crushing rate to the stockpile will exceed the rate of withdrawal of ore to the milling circuit. Crushed ore will be reclaimed from the stockpile by FEL into the emergency feed hopper to maintain mill feed when the reclaim apron feeders are off line.

Crushed mill feed will be withdrawn from the stockpile at a controlled rate by variable speed apron feeders and fed via the mill feed conveyor directly to the SAG mill. A weightometer will indicate the instantaneous and totalized mill feed tonnage.

Quicklime, used for pH control, will be added directly onto the mill feed conveyor. Quicklime will be stored in two lime silos and will be metered onto the belt using a variable speed rotary feeder. Quicklime will be delivered to site in bulk tankers and transferred to the lime silos using a pneumatic conveying system. The silos will be fitted with a dust collector.

Grinding media will be added directly onto the SAG mill feed belt via the emergency feed hopper as required to maintain the required SAG mill load.

Coarse spillage in the crusher area will be cleaned up by FEL and transported to the RoM pad for drying or fed directly to the primary crusher. Coarse spillage in the reclaim tunnel will be cleaned up by hand and then transferred by FEL and loaded into the circuit via the emergency feed hopper.

Water sprays and/or dust collectors will be installed for fugitive dust at the primary crusher, surge bin, and quicklime addition point.

The crushing circuit will be controlled from the local control station.

GRINDING AND CLASSIFICATION CIRCUIT
The grinding circuit will consist of a SAG mill in closed circuit with a pebble crusher and a ball mill in closed circuit with hydrocyclones. Crushed ore will be fed directly to the SAG mill. Pebble crusher product will also be deposited on the SAG mill feed conveyor. Process water will be added to the SAG mill to achieve the required milling pulp density.

The SAG mill will be equipped with a variable speed drive and will be capable of operating between 60% and 80% of critical speed. During start-up, the mill speed will be reduced and the ball load increased to meet the requirements for treating high proportions of low competency oxide ore. As the amount of competent primary ore in the mill feed increases, the mill speed will be increased and ball charge reduced.

The SAG mill will discharge via a discharge assembly over a vibrating wet screen. Screen oversize, consisting of pebbles and worn steel grinding media, will discharge onto the pebble transfer conveyor. If required, screen oversize can be diverted to the pebble bunker.

A magnet mounted above the pebble transfer conveyor will remove the tramp steel grinding media. Any tramp metal not removed will be detected by a metal detector located above the pebble transfer conveyor prior to the pebble crusher. The metal detector will activate a diverter gate to prevent steel from reporting to the pebble crusher. This diverter gate will also allow bypassing of the pebbles for recycle to the SAG mill or to enable maintenance to be carried out on the pebble crusher without the need to shut down the milling circuit. A weightometer on the pebble transfer conveyor will indicate the mass of pebbles being recycled.

Pebbles will be crushed in the pebble crusher, which will discharge directly to the emergency feed/pebble product conveyor. This conveyor then discharges to the SAG mill feed conveyor.

The SAG mill discharge screen undersize will gravitate to the mill discharge hopper, where it will be diluted with process water and pumped to the classifying hydrocyclone cluster.

The combined cyclone overflow stream, with a nominal pulp density of 42% w/w solids, will gravitate to the trash screen. The cyclone underflow will be collected in the underflow launder and report to the feed chute of the ball mill. The design has made allowance for a future gravity circuit fed from the cyclone underflow launder with gravity tails reporting to the ball mill feed.

The ball mill will be equipped with a variable speed drive (VSD) and squirrel cage motor for soft starting only. No speed variation will be available for the ball mill.

Cyclone underflow returning to the ball mill will undergo further size reduction and discharge from the ball mill will be combined with the pebble dewatering screen undersize in the mill discharge hopper and undergo reclassification in the hydrocyclone cluster.

Cyclone overflow will be screened on a vibrating trash screen to remove any misreporting of coarse ore particles, wood fragments, organic material and plastics that would otherwise become locked up with the circuit carbon and 'peg' the intertank screens. Trash material will report to the trash bunker.


Processing

  • Carbon re-activation kiln
  • Hydrochloric acid (reagent)
  • Dewatering
  • Agitated tank (VAT) leaching
  • Carbon in leach (CIL)
  • AARL elution
  • Carbon adsorption-desorption-recovery (ADR)
  • Solvent Extraction & Electrowinning
  • Cyanide (reagent)

Flow Sheet: Subscription required

Summary:

The process plant design incorporates the following unit process operations:
• Single stage primary crushing with a single toggle jaw crusher to produce a crushed product size of P80 ranging from 100 mm to 140 mm, based on differing weathering types.
• A crushed ore stockpile with a live nominal capacity of 2,000 t.
• SAG and ball milling in closed circuit with a pebble crusher and hydrocyclones (SABC) to produce a P80 grind size of 106 µm.
• Leach and CIL circuit incorporating eight stages, with one stage of leaching without carbon and seven stages with carbon for gold adsorption.
• Split Anglo American Research Laboratory (SAARL) elution circuit, electrowinning, and gold smelting to recover gold from the loaded carbon to produce doré.
• Carbon reactivation utilizing a rotary kiln.
• Tailings thickening to recover and recycle process water and precious metal values from the CIL tailings.
• Tailings pumping to the TSF.

LEACH AND CARBON ........

Recoveries & Grades:

CommodityParameter202120202019
Gold Recovery Rate, %  ......  Subscription required  ......  Subscription required  ......  Subscription required
Gold Head Grade, g/t  ......  Subscription required  ......  Subscription required  ......  Subscription required

Production:

CommodityUnits2022202120202019
Gold koz  ......  Subscription required ^  ......  Subscription required  ......  Subscription required  ......  Subscription required
All production numbers are expressed as metal in doré. ^ Guidance / Forecast.
Subscription required - Subscription is required.

Operational Metrics:

Metrics202120202019
Total tonnes mined  ......  Subscription required  ......  Subscription required12,151 kt
Ore tonnes mined  ......  Subscription required  ......  Subscription required1,532 kt
Waste  ......  Subscription required  ......  Subscription required10,619 kt
Stripping / waste ratio  ......  Subscription required  ......  Subscription required6.9
Tonnes processed  ......  Subscription required  ......  Subscription required958 kt
Subscription required - Subscription is required.

Reserves at December 31, 2021:
Cut-off grades for the resources are from 0.35g/t Au to 0.60g/t Au;

Cut-off grades for the reserves are oxide: 0.40g/t Au to 0.50g/t Au; transitional: 0.50g/t Au to 0.60g/t Au; fresh: 0.60g/t Au to 0.70g/t Au.

CategoryTonnage CommodityGradeContained Metal
Proven 2.1 Mt Gold 0.78 g/t 52 koz
Probable 19.5 Mt Gold 1.6 g/t 1,006 koz
Proven & Probable 21.6 Mt Gold 1.52 g/t 1,059 koz
Measured 2.3 Mt Gold 0.82 g/t 60 koz
Indicated 38.4 Mt Gold 1.52 g/t 1,879 koz
Measured & Indicated 40.7 Mt Gold 1.48 g/t 1,940 koz
Inferred 5 Mt Gold 1.53 g/t 247 koz

Commodity Production Costs:

CommodityUnits202120202019
Total cash costs (sold) Gold USD  ......  Subscription required  ......  Subscription required  ......  Subscription required
All-in sustaining costs (sold) Gold USD  ......  Subscription required  ......  Subscription required  ......  Subscription required
All-in sustaining costs (AISC) Gold USD  ......  Subscription required
^ Guidance / Forecast.
Subscription required - Subscription is required.

Operating Costs:

Units202120202019
OP mining costs ($/t mined) USD 2.722.42.17
Processing costs ($/t milled) USD  ......  Subscription required  ......  Subscription required  ......  Subscription required
G&A ($/t milled) USD  ......  Subscription required  ......  Subscription required
Subscription required - Subscription is required.

Financials:

Units20222021
Capital expenditures (planned) M USD  ......  Subscription required
Capital expenditures M USD  ......  Subscription required
Sustaining costs M USD  ......  Subscription required
Revenue M USD  ......  Subscription required
Operating Income M USD  ......  Subscription required
Subscription required - Subscription is required


Proposed Heavy Mobile Equipment as of July 31, 2019:
HME TypeSizeQuantity
Backhoe 5.7 cu. m ....................... Subscription required
....................... Subscription required ....................... Subscription required ....................... Subscription required
....................... Subscription required ....................... Subscription required
....................... Subscription required ....................... Subscription required
....................... Subscription required ....................... Subscription required ....................... Subscription required
....................... Subscription required ....................... Subscription required ....................... Subscription required
....................... Subscription required ....................... Subscription required ....................... Subscription required
....................... Subscription required ....................... Subscription required ....................... Subscription required
....................... Subscription required ....................... Subscription required ....................... Subscription required
....................... Subscription required ....................... Subscription required ....................... Subscription required
....................... Subscription required ....................... Subscription required
....................... Subscription required ....................... Subscription required
....................... Subscription required ....................... Subscription required ....................... Subscription required
....................... Subscription required ....................... Subscription required ....................... Subscription required
Subscription required - Subscription is required.

Mine Management:

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Apr 1, 2022
....................... Subscription required ....................... Subscription required Subscription required Apr 1, 2022
....................... Subscription required ....................... Subscription required Subscription required Apr 1, 2022
....................... Subscription required ....................... Subscription required Subscription required Apr 1, 2022
Subscription required - Subscription is required.

Staff:

EmployeesYear
Subscription required 2021
Subscription required 2020
Subscription required 2019

Corporate Filings & Presentations:

DocumentYear
Corporate Presentation 2022
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2019
................................... Subscription required 2019
................................... Subscription required 2019
................................... Subscription required 2019
................................... Subscription required 2019
Annual Information Form 2018
Management Discussion & Analysis 2018
Technical Report 2018
Feasibility Study Report 2017
Management Discussion & Analysis 2017
Subscription required - Subscription is required.

News:

NewsDate
Endeavour Shareholders Vote Overwhelmingly in Favour of The Arrangement Agreement with Teranga January 21, 2021
Endeavour and Teranga Announce Combination to Create New Senior Gold Producer November 16, 2020
Teranga Gold Update to Wahgnion Gold Operation Mine Plan Increases Average Annual Production by 25% August 6, 2020
Teranga Gold Declares Commercial Production at Wahgnion Gold Operations; Expected to Achieve Upper End of 2019 Production Guidance November 25, 2019
Teranga Gold Starts Production at Wahgnion Gold Operations Ahead of Original Schedule September 4, 2019
Teranga Gold Announces First Drawdown Under Facility For Construction of its Second Mine May 7, 2018

Aerial view:

Subscription required - Subscription is required.

Terms of Use Privacy Policy © 2017-2022 MDO Data Online Inc.