Slick Rock Project

This page is not tailored to
devices with screen width under 750 px.
 Location:
32 km N from Dove Creek, Colorado, United States

  Project Contacts:
500 North Shoreline
Ste. 800N
Corpus Christi
Texas, United States
78401
Phone  ...  Subscription required
Fax(361) 888-5041
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in United States
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Costs & Financials
  • Fleet
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StagePreliminary Economic Assessment
Mine TypeUnderground
Commodities
  • Uranium
  • Vanadium
Mining Method
  • Room-and-pillar
Mine Life20 years (as of Jan 1, 2014)


Owners

Source: p. 13
CompanyInterestOwnership
Uranium Energy Corp. 100 % Direct
Uranium Energy Corp. holds an undivided 100% interest in contiguous mineral lode claims in the Slick Rock Project, a 5,333 acre property located in San Miguel County, Colorado.

Contractors

Subscription required - Subscription is required.


Deposit Type

  • Sediment-hosted


Summary:

In the Slick Rock district, uranium/vanadium deposits of the Morrison are mainly tabular to lenticular and elongate parallel to sedimentary trends. Tabular trends are localized in massive sandstones where clay and mudstone are interstitial, in scattered and streaked gall and pebble accumulations, and are found in discontinuous lenses. Conversely, roll deposits are narrow, elongate, and curve sharply across bedding and appear to be confined to sandstone where clay and mudstone are well indurated within interconnected layers (Figure 8.1a). Mineralization in either case, tabular or roll deposits, averages about 0.25% U3O8 and 1.5% V205 within the impregnated sandstone. The mineralized bodies have an average thickness of 2 ft to 4 ft and range in size from a few feet wide to several hundred feet wide (Fischer and Hilbert, 1952). These deposits can contain a few tons of ore to several thousand tons in the larger ore bodies.

The uranium- and vanadium-bearing minerals occur as fine-grained coatings in detrital grains; they fill pore spaces between the sand grains and replace carbonaceous material and some detrital grains (Weeks et al., 1956).

The primary uranium minerals are uraninite (UO2) with minor amounts of coffinite (USiO4OH). Montroseite (VOOH) is the primary vanadium mineral, along with vanadium clays and hydromica. Metal sulfides occur in trace amounts. Mineralization occurs within tabular to lenticular bodies that are peneconcordant within sedimentar ........


Mining Methods

  • Room-and-pillar


Summary:

The Slick Rock Project includes the Burro Mine which was owned by Union Carbide Nuclear Corporation (now Umetco Minerals) from 1955 through 1971 producing 404,804 tons and an additional 60,956 tons intermittently up through 1983, based on reported pounds and average grade produced.

The PEA is based on a random room and pillar mining method as was previously employed within the project area and in general through the Colorado Plateau. The characteristics of the Slick Rock mineral deposits are compatible with this method in that mineralization is generally tabular with some moderate rolls, low to moderate dip, and exhibit good rock strength with respect to both roof and floor. The randomness of the room and pillar extraction is due to the variations in uranium grade and thicknesses encountered. Typically, mining will follow the mineralization through underground longhole drilling in advance of mining, face sampling, and mapping concurrent with mining. Pillars are left where the mineralization is weaker in terms of concentration and/or thickness; however, in some cases temporary roof support will be necessary. The nature of the mineralization lends itself to a high extraction rate. The base case assumed 90% mine extraction. The sensitivity analysis evaluated 80% mine extraction.


Crushing and Grinding


Processing


Summary:

Specific metallurgical testing is not available for the Slick Rock Project. However, mineralized material from the Slick Rock Project area, as well as similar deposits in the Uravan Mineral Belt has been processed successively for uranium and vanadium for more than 50 years. Further, the PEA is not based on the processing of the mineralized material, but rather the sale of the mineralized material to the White Mesa mill in Blanding, Utah.

On-site processing via vat or heap leaching could produce intermediate products including on-site concentrated product liquor (slurry or paste), or loaded resin, which could be shipped for final processing and drying to existing facilities. This approach would allow shipment of concentrate to a larger variety of existing facilities, whereas, the White Mesa mill is the only mill currently receiving raw mine feed. This approach could include shipment of concentrate to the UEC Hobson facility.

Recoveries & Grades:

CommodityParameterAvg. LOM
Uranium Head Grade, % 0.21
Vanadium Head Grade, % 1.27

Projected Production:

CommodityProductUnitsLOM
Uranium Contained U3O8 k lbs 7,384
Vanadium Contained V2O5 k lbs  ......  Subscription required

Operational Metrics:

Metrics
Stripping / waste ratio 1.58 *
Daily mining rate 500 tons *
Daily ore mining rate 320 tons of ore *
Annual mining capacity 105,600 tons of ore *
Waste tonnes, LOM 1,044,000 tons *
Ore tonnes mined, LOM 1,740,000 tons *
Total tonnes mined, LOM 2,784,000 tons *
* According to 2014 study.

Reserves at September 30, 2018:

CategoryTonnage CommodityGradeContained 
Commodity
Inferred 2,549 k tons Uranium (U3O8) 0.228 % 11,600 k lbs
Inferred 2,549 k tons Vanadium 1.37 % 69.6 M lbs

Commodity Production Costs:

CommodityUnits
Assumed price Vanadium USD 10 / lb *  USD
Assumed price Uranium (U3O8) USD 60 / lb *  USD
* According to 2014 study / presentation.
Subscription required - Subscription is required.

2014 Study Costs and Valuation Metrics :

MetricsUnitsLOM Total
Initial CapEx $M USD  ......  Subscription required
Sustaining CapEx $M USD  ......  Subscription required
Total CapEx $M USD  ......  Subscription required
UG OpEx $M USD  ......  Subscription required
Total OpEx $M USD  ......  Subscription required
Gross revenue (LOM) $M USD  ......  Subscription required
Pre-tax Cash Flow (LOM) $M USD  ......  Subscription required
Pre-tax NPV @ 5% $M USD  ......  Subscription required
Pre-tax NPV @ 10% $M USD  ......  Subscription required
Pre-tax NPV @ 7% $M USD  ......  Subscription required
After-tax NPV @ 5% $M USD  ......  Subscription required
After-tax NPV @ 10% $M USD  ......  Subscription required
After-tax NPV @ 7% $M USD  ......  Subscription required
Pre-tax IRR, %  ......  Subscription required
After-tax IRR, %  ......  Subscription required
Pre-tax payback period, years  ......  Subscription required
Subscription required - Subscription is required.


Proposed Heavy Mobile Equipment as of April 8, 2014:
HME TypeModelSizeQuantity
ANFO Loader ....................... Subscription required
....................... Subscription required ....................... Subscription required
....................... Subscription required ....................... Subscription required ....................... Subscription required
....................... Subscription required ....................... Subscription required ....................... Subscription required
....................... Subscription required ....................... Subscription required ....................... Subscription required
....................... Subscription required ....................... Subscription required ....................... Subscription required
Subscription required - Subscription is required.

Mine Management:

Job TitleNameRef. Date
....................... Subscription required ....................... Subscription required Jul 26, 2021
Subscription required - Subscription is required.


Corporate Filings & Presentations:

DocumentYear
................................... Subscription required 2020
Corporate Presentation 2018
Form 10-K 2018
Corporate Presentation 2017
Form 10-K 2017
Form 10-K 2016
Preliminary Economic Assessment 2014