Mining Intelligence and Sales Leads
Indonesia

Grasberg Mine

Click for more information

Categories

Summary

Mine TypeOpen Pit
StatusClosing / Closed
Commodities
  • Copper
  • Gold
  • Silver
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
SnapshotThe Grasberg open pit mine was a part of Grasberg minerals district.

the Grasberg mine has been operated by PT Freeport Indonesia since 1990 and was officially closed in April 2020.

PT Freeport Indonesia has developed a reclamation plan for the 920 hectares of Grasberg mine, which is expected to be completed by 2041.

As of 2024 year, Freeport has already completed reclamation on approximately 570 hectares.

The reclamation targets are submitted to the Ministry of Energy and Mineral Resources (ESDM) every five years.

Owners

SourceSource
CompanyInterestOwnership
Freeport-McMoRan Inc. 48.76 % Indirect
PT Indonesia Asahan Aluminium (Persero) 51.24 % Indirect
PT Freeport Indonesia (PT-FI) is a limited liability company organized under the laws of the Republic of Indonesia. PT-FI operates the mines in the Grasberg minerals district.

Freeport-McMoRan have a 48.76 percent share ownership in PT-FI and the remaining 51.24 percent share ownership is held by PT Indonesia Asahan Aluminium (an Indonesian state-owned enterprise).

Deposit type

  • Vein / narrow vein
  • Breccia pipe / Stockwork

Summary:

The igneous-hosted ore bodies (the Grasberg open pit and block cave, and portions of the DOZ block cave) occur as vein stockworks and disseminations of copper sulfides, dominated by chalcopyrite and, to a lesser extent, bornite.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Fleet data has not been reported.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Commodity Production

Combined production numbers are reported under Grasberg Complex

Operational metrics

Metrics202020192018201720162015
Daily milling rate  ....  Subscribe 60,100 t 133,300 t 101,800 t 119,700 t 115,900 t
Daily mining capacity  ....  Subscribe 275,000 t
Ore tonnes mined  ....  Subscribe 49 Mt 37 Mt 44 Mt 42 Mt
Daily mining rate  ....  Subscribe 180,500 t 250,400 t

Production Costs

Commodity production costs have not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Feb 13, 2026
....................... Subscription required ....................... Subscription required Subscription required Feb 13, 2026

Workforce

Aerial view:

Lock

- subscription is required.