Mexico
Santana Mine

This page is not tailored to
devices with screen width under 750 px.
 Location:
126 km NE from Ciudad Obregon, Sonora, Mexico

  Regional Office:
Calle Pedro Moreno #24, Int. Segundo Piso
Hermosillo
Sonora, Mexico
83000
Phone  ...  Subscription required
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in Mexico
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Mining
  • Processing
  • Production
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StageProduction
Mine TypeOpen Pit
Commodities
  • Gold
Mining Method
  • Truck & Shovel / Loader
Processing
  • Crush-and-stack plant
  • Heap leach
  • Carbon in column (CIC)
Mine Life8 years (as of Jan 1, 2020)
The Company made its production decision and has started the development and production of the Santana gold mine without having completed a feasibility study demonstrating economic and technical viability. As such, there may be increased uncertainty of achieving planned production levels, estimated recovery of gold, the costs associated with such recovery, including increased risks associated with developing a commercially mineable deposit. Historically, such projects have a much higher risk of economic and technical failure.
Latest NewsMinera Alamos Announces Santana Gold Project Operations Update     May 31, 2022


Owners

Source: p. 10
CompanyInterestOwnership
Minera Alamos Inc. 100 % Indirect
Minera Alamos Inc. holds a 100% interest in the Santana project through its subsidiary Corex Gold Corporation.

Deposit Type

  • Breccia pipe / Stockwork


Summary:


Mining Methods

  • Truck & Shovel / Loader


Summary:

Santana mine is conventional open pit mining.

Mining activities commenced in June 2021 but were constrained initially due to access limitations based on the topography of the Nicho Norte starter pit location. These limitations continue to decrease as additional benches are extracted and mining production levels expand accordingly.

Mineralized material from the early phases (June/July) was placed on the leach pad and utilized as test material for the final commissioning/optimization of the project processing equipment.

The primary focus of the early ramp-up operations at Nicho Norte is to move the mine into commercial production while efficiently minimizing the upfront capital requirements. The scale of mining operations will continue to increase as the available working area for equipment in the starter pit expands with depth. In addition, the amount of mineralized material available for gold extraction (as a % of the total material stacked on the leach pad) will also continue to increase. Currently a significant portion of this material (and the contained gold) is unavailable for recovery as it is located in areas being utilized as working surfaces for equipment to stack new material on the leach pad. This situation will continue to improve as the ramp-up continues.


Crushing and Grinding
Crusher / Mill TypeModelSizePowerQuantity
Jaw crusher ....................... Subscription required 1
Cone crusher ....................... Subscription required 2


Processing

  • Crush-and-stack plant
  • Heap leach
  • Carbon in column (CIC)

Source: Subscription required

Summary:

Crushing operations are currently active with the crushing equipment relocated to adjacent to the leach pad for efficient transfer of crushed material for stacking. Mineralized material containing in excess of 0.5 g/t Au is currently being crushed to <3/4” in size while lower grade material is being stacked on the leach pad as run-of-mine (“ROM”) following significant fragmentation from blasting.

All three sets of gold recovery (“carbon”) columns at the Santana process plant have been thoroughly tested and are functional at design capacity. Reagent mixing systems have been successfully commissioned and are currently in use.

Gold extraction continues from initial mineralized material stacked on the leach pad. Following a period to allow gold concentrations to increase in the pregnant solution pond, gold recovery to carbon is underway.

CommodityParameter

Production:

CommodityUnits2022Avg. Annual (Projected)LOM (Projected)
Gold koz  ......  Subscription required ^37296
All production numbers are expressed as metal in doré. ^ Guidance / Forecast.


Reserves at :



Heavy Mobile Equipment:

Mine Management:

Job TitleNamePhoneEmailProfileRef. Date
....................... Subscription required ....................... Subscription required ....................... Subscription required ....................... Subscription required Subscription required Nov 25, 2021
....................... Subscription required ....................... Subscription required Subscription required Nov 25, 2021
....................... Subscription required ....................... Subscription required Subscription required Nov 25, 2021
Subscription required - Subscription is required.


Corporate Filings & Presentations:

DocumentYear
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2019
................................... Subscription required 2019
................................... Subscription required 2019
Subscription required - Subscription is required.

News:

NewsDate
Minera Alamos Announces Santana Gold Project Operations Update May 31, 2022
Minera Alamos Announces Santana Project Achieves First Gold Production November 4, 2021
Minera Alamos Announces Santana Project Operations Update July 21, 2021
Minera Alamos First Blast Completed at Santana Gold Mine as Mining Operations Commence; Fortuna Update May 20, 2021
Minera Alamos Selects Mining Contractor in Preparation for Start of Mining Operations March 31, 2021
Minera Alamos Provides Mid-Year Construction Update at the Santana Gold Project, Sonora, Mexico... July 15, 2020
Minera Alamos Continues to Expand Mineralization at Santana Gold Project, Sonora, Mexico June 10, 2020
Minera Alamos Intersects 248 Metres of 0.60 G/t Gold Ending in Mineralization from Ongoing Drilling at the Santana Gold Project, Sonora, Mexico April 30, 2020
Minera Alamos Drilling Provides Further Confirmation of Significant Disseminated Mineralization at the Divisadero Discovery and... February 6, 2020
Minera Alamos Commences Construction of Santana Gold Mine, Sonora, Mexico; Other Updates January 16, 2020
Minera Alamos Receives Federal Environmental Permit Approvals for the Santana Gold Project, Sonora, Mexico August 8, 2019
Minera Alamos Expands Santana Gold Project Permits to Accommodate Commercial Scale Operations July 26, 2018
Corex Gold Reports First Gold Sales from Santana Project October 31, 2017