Data Access
Keep me signed in.
Forgot your password?
Forgot Your Password?
Enter the email you signed up with and we'll email it to you.
Back
Mining Data Solutions
Home
Database
Subscribe
Sign In
Sign In
Coal Mountain Mine
This page is not tailored to
devices with screen width under 750 px.
Location:
30 km SE from Sparwood, British Columbia, Canada
Address:
P.O. Box 3000
Sparwood
British Columbia, Canada
V0B 2G0
...
250-425-7373
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in Canada
A list of country's mines and projects.
Full profiles of select mines and projects.
Overview
Owners
Mining
Processing
Production
Reserves
Personnel
Filings & News
Thank you for browsing through mine profiles compiled by the Mining Data Online team.
Would you like to subcribe or schedule a Demo?
Name:
Company:
Position:
Phone:
Email:
Message:
Overview
Status
Closing / Closed
Mine Type
Open Pit
Commodities
Coal (PCI)
Coal (metallurgical)
Mining Method
Truck & Shovel / Loader
Coal Mountain mine undertook ongoing reclamation works throughout the site, and also advanced closure planning with submission of an updated closure plan to the regulator at the end of 2022.
Owners
Source:
p. 13
Company
Interest
Ownership
Teck Resources Ltd.
100 %
Indirect
Contractors
- Subscription is required.
Deposit Type
Sedimentary
Summary:
Mining Methods
Truck & Shovel / Loader
Summary:
All of Teck’s coal mines are conventional open pit operations and are designed to operate on a continuous basis, 24 hours per day, 365 days per year.
Crushing and Grinding
Processing
Source:
Summary:
- subscription is required.
Production
:
Commodity
Units
2017
Coal (PCI)
Mt
2.7
All production numbers are expressed as clean coal.
Operational Metrics:
Metrics
2017
2016
2015
2014
Coal washing plant annual capacity
3.5 Mt of clean coal
3.5 Mt of clean coal
3.5 Mt of clean coal
3.5 Mt of clean coal
Annual mining capacity
2.7 Mt of coal (pci)
2.7 Mt of coal (pci)
2.7 Mt of coal (pci)
Reserves at December 31, 2022:
Category
Tonnage
Commodity
Measured
40,400 kt
Coal (PCI)
Indicated
13,800 kt
Coal (PCI)
Inferred
300 kt
Coal (PCI)
Heavy Mobile Equipment:
Mine Management:
Job Title
Name
Profile
Ref. Date
.......................
.......................
Apr 24, 2023
.......................
.......................
Apr 24, 2023
- Subscription is required.
Corporate Filings & Presentations:
Document
Year
Annual Information Form
2022
...................................
2021
...................................
2020
...................................
2019
Annual Information Form
2017
Annual Information Form
2016
Annual Report
2016
Annual Information Form
2015
Annual Information Form
2014
- Subscription is required.
- Subscription is required.