Overview
Status | Care and Maintenance |
Mine Type | Open Pit |
Commodities |
- Coal (PCI)
- Coal (metallurgical)
|
Mining Method |
|
Coal Mountain mine in southeastern British Columbia has been closed since 2019 and remains on care and maintenance. |
Source:
p. 64
Contractors
- Subscription is required.
Summary:
All of Teck’s coal mines are conventional open pit operations and are designed to operate on a continuous basis, 24 hours per day, 365 days per year.
Source:
Summary:

- subscription is required.
Production:
Commodity | Units | 2017 |
Coal (PCI)
|
Mt
| 2.7 |
All production numbers are expressed as clean coal.
Operational Metrics:
Metrics | 2017 | 2016 | 2015 | 2014 |
Coal washing plant annual capacity
| 3.5 Mt of clean coal | 3.5 Mt of clean coal | 3.5 Mt of clean coal | 3.5 Mt of clean coal |
Annual mining capacity
| | 2.7 Mt of coal (pci) | 2.7 Mt of coal (pci) | 2.7 Mt of coal (pci) |
Reserves at December 31, 2021:
The Project Coal resources consist of Coal Mountain mine PCI coal and CMO Phase II project Metallurgical Coal.
Category | Tonnage | Commodity |
Measured
|
56.6 Mt
|
Coal (PCI)
|
Measured
|
102.2 Mt
|
Coal (metallurgical)
|
Indicated
|
22.9 Mt
|
Coal (PCI)
|
Indicated
|
71.7 Mt
|
Coal (metallurgical)
|
Inferred
|
4.8 Mt
|
Coal (PCI)
|
Inferred
|
7.9 Mt
|
Coal (metallurgical)
|
- Subscription is required.
Corporate Filings & Presentations:
- Subscription is required.
- Subscription is required.