Hunter Valley Operations (HVO) Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusActive
Commodities
  • Coal (thermal)
Mining Method
  • Dragline
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotHunter Valley Operations (HVO) is a large-scale open cut operation that produces some of the highest quality thermal and semi-soft metallurgical coal in the world.

The HVO continuation project involves extending the life of the HVO North mine from 2025 to 2050 and HVO South mine from 2030 to 2045.

HVO is seeking approval for the continuation project from both the NSW and Federal Governments. As part of this process, HVO has deferred its Environmental Protection and Biodiversity Conservation (EPBC) application to the Australian Government.

Meanwhile, HVO is seeking a short-term extension from the NSW Government to continue mining within its currently approved area.

Owners

SourceSource
CompanyInterestOwnership
Glencore plc. 49 % Indirect
Yancoal Australia, Ltd. 51 % Indirect
Hunter Valley Operations Pty Ltd. (operator) 100 % Direct
Hunter Valley Operations (HVO) is a jointly controlled operation through a Joint Venture (JV) between Glencore (49%) and Yancoal (51%).

Contractors

Lock

- subscription is required.

Deposit type

  • Sedimentary

Summary:

The surface geology of the HVO, MTW and Ashton coal leases is dominated by outcrops of the Jerry’s Plains and Vane Subgroups which form the Whittingham Coal Measures. The main rock types of this subgroup include sandstone, siltstone and conglomerate, which occur with subordinate coal and tuffaceous claystone.

HVO is located on the asymmetric southerly plunging Bayswater Syncline. The Auckland area is located on the western flank of the Camberwell Anticline and dips more steeply than the western limb of the Bayswater Syncline. The West Pit is located on the eastern flank of the Muswellbrook Anticline. The Barrett seam outcrops in the east of the Auckland area on the Camberwell Anticline.

The sedimentary pile in the Sydney Basin has asymmetrical thickness distribution. The thickest accumulations are along the easterly-dipping Hunter-Mooki Thrust Fault System suggesting that subsidence was greatest along that fault. The sedimentary sequence thins to the west due to the sediments onlapping into the basement rocks in the west. The Hunter Coalfield is a district- scale north-eastern subdivision of the Sydney Basin. The Permian coal bearing stratigraphic section occurs within the Whittingham Coal Measures.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

CommodityUnits2024202320222021202020192018201720162015
Coal (metallurgical & thermal) Mt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe14 13 
Coal (thermal) kt 8,5029,92510,048
Coal (semi-soft coking) kt 1,5293,7202,966
All production numbers are expressed as clean coal. ^ Guidance / Forecast.

Operational metrics

Metrics2024202320222021202020192018201720162015
Coal tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe19.2 Mt19 Mt19.5 Mt18 Mt17.2 Mt
Waste  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe102.3 Mbcm100.4 Mbcm97.3 Mbcm106.46 Mbcm104.34 Mbcm
Reject  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe4.46 Mt4.8 Mt4.8 Mt
Tonnes processed  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe18.1 Mt18 Mt19.6 Mt
Stripping / waste ratio  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe5.4 bcm/t
^ Guidance / Forecast.

Production Costs

Commodity production costs have not been reported.

Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNamePhoneEmailProfileRef. Date
....................... Subscription required ....................... Subscription required ........... Subscription required Subscription required Aug 12, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 12, 2024
....................... Subscription required ....................... Subscription required ........... Subscription required Subscription required Aug 12, 2024
....................... Subscription required ....................... Subscription required ........... Subscription required ........... Subscription required Subscription required Aug 12, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 12, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 12, 2024
....................... Subscription required ....................... Subscription required ........... Subscription required ........... Subscription required Subscription required Aug 12, 2024

EmployeesTotal WorkforceYear
...... Subscription required 2023
...... Subscription required 2022
...... Subscription required 2021
...... Subscription required 2020
...... Subscription required 2015
...... Subscription required 2014
...... Subscription required 2013

Aerial view:

Lock

- subscription is required.