• Data Access
  • Your Email  
  • Your Email  
Keep me signed in.
Forgot your password?
Close
  • Forgot Your Password?
  • Enter the email you signed up with and we'll email it to you.
  • Your Email  
Close
Back
MDO
Mining Data Solutions
  • Home
  • Database
  • Subscribe
  • Sign In
  • Sign In
Australia
Jellinbah Mine

This page is not tailored to
devices with screen width under 750 px.
 Location:
81 km E from Emerald, Queensland, Australia

  Regional Office:
Level 7, 12 Creek Street
Brisbane
Queensland, Australia
4000
Phone  ...  Subscription required
Fax+61-7-3221-7119
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in Australia
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StageProduction
Mine TypeOpen Pit
Commodities
  • Coal (metallurgical)
  • Coal (thermal)
Mining Method
  • Truck & Shovel / Loader
  • Backfill
Production Start...
Latest NewsNRW’s Golding picks up Jellinbah East mining services contract     December 22, 2022


Owners

Source: p. 1
CompanyInterestOwnership
Sojitz Coal Resources Pty Ltd. 15 % Indirect
Marubeni Coal Pty Ltd. 15 % Indirect
Jellinbah Group 70 % Indirect
Jellinbah Mine is held by the participants of the Jellinbah East Joint Venture (Jellinbah Group 70%, Marubeni Coal 15% and Sojitz Development 15%).

Contractors

Subscription required - Subscription is required.


Deposit Type

  • Sedimentary


Summary:

The Jellinbah coal deposit is approximately 30 km in length. The major seam of the deposit is the Pollux Seam which is approximately 8 metres thick. The seam dips gently to the east and further down dip splits into the Pollux Upper & Pollux Lower seams.


Mining Methods

  • Truck & Shovel / Loader
  • Backfill


Summary:

Overburden drilling and blasting is followed by conventional removal with truck and shovel and dozer push. Coal is then mined using the truck and excavator method and is crushed in a 1,200 tonnes per hour crushing and screening plant. Sampling and on-line ash analysis takes place during the crushing process. After crushing, the coal can either be directed to the coal preparation plant or to crushed coal stockpiles.

Overburden is drilled and blasted to provide access to the high-grade, low-ash, low-sulphur coal resource, which is extracted using conventional open-cut truck and excavator methods. Strip mining is used in areas where coal seam dip is less than 10 degrees (Central) and terrace mining in more steeply dipping areas (Plains). Coal seams are mined separately with partings selectively removed down to 150 millimetres (mm). Vegetation is cleared prior to mining and topsoil is selectively stripped for immediate reuse, or stockpiled for future use in rehabilitation. Overburden is initially used to form bunds, haul roads and hardstands or is transported to an outof-pit spoil dump located clear of the coal resource. Most overburden is placed in-pit to backfill mined-out areas.

After mining, careful reshaping and rehabilitation of the spoil dumps is conducted and the site is recovered with top soil and seeded. The mine operates in full compliance with the Queensland Government environmental procedures which control levels of noise, dust, water qual ........


Crushing and Grinding


Processing

Source: Subscription required

Summary:

- subscription is required.


Production:

CommodityUnits2022202120202019201820172016
Coal (metallurgical) t  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required4,827,3754,605,0794,743,857
Coal (thermal) t  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required
All production numbers are expressed as clean coal.
Subscription required - Subscription is required.

Operational Metrics:

Metrics202220212020201920182017
Coal tonnes mined  ......  Subscription required  ......  Subscription required  ......  Subscription required5,285,186 t of ROM coal4,495,773 t of ROM coal5,610,171 t of ROM coal
Tonnes processed  ......  Subscription required  ......  Subscription required  ......  Subscription required4,692,610 t5,235,631 t5,276,450 t
Annual production capacity  ......  Subscription required  ......  Subscription required  ......  Subscription required
Subscription required - Subscription is required.

Reserves at December 31, 2021:

CategoryTonnage Commodity
Total Resource 500 Mt Coal (metallurgical & thermal)



Heavy Mobile Equipment:

Mine Management:

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Sep 13, 2022
....................... Subscription required ....................... Subscription required Subscription required Sep 13, 2022
....................... Subscription required ....................... Subscription required Subscription required Sep 13, 2022
....................... Subscription required ....................... Subscription required Subscription required Sep 13, 2022
Subscription required - Subscription is required.

Staff:

EmployeesYear
Subscription required 2021
Subscription required 2020
Subscription required 2019
Subscription required 2018
Subscription required 2017
Subscription required 2016

Corporate Filings & Presentations:

DocumentYear
Other 2022
Other 2022
................................... Subscription required 2019
................................... Subscription required 2019
Other 2018
Other 2018
Subscription required - Subscription is required.

News:

NewsDate
NRW’s Golding picks up Jellinbah East mining services contract December 22, 2022

Subscription required - Subscription is required.

Terms of Use Privacy Policy © 2017-2023 MDO Data Online Inc.