Mining Intelligence and News
Australia

Jellinbah Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusActive
Commodities
  • Coal (metallurgical)
  • Coal (thermal)
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotThe Jellinbah Mine comprises the following approved areas: Jellinbah Central, Jellinbah Plains, Jellinbah Plains South, Mackenzie North, Central North and the Central North Extension; and Jellinbah South (not currently operational).

The Jellinbah Central North Extension is a proposed expansion of the existing Jellinbah Central North open-cut coal mine. The proposal will extend the operational life of the mine by 20 years and increase production by 1 Mt per annum (Mtpa) run-of-mine (ROM) coal.

As of 2023, Jellinbah has commenced the Central North mine extension.

Owners

SourceSource
CompanyInterestOwnership
Sojitz Coal Resources Pty Ltd. 15 % Indirect
Marubeni Coal Pty Ltd. 15 % Indirect
Jellinbah Group 70 % Indirect
Jellinbah Mining Pty Ltd. (operator) 100 % Direct
Jellinbah Mine is held by the participants of the Jellinbah East Joint Venture (Jellinbah Group 70%, Marubeni Coal 15% and Sojitz Development 15%).

Project is operated by Jellinbah Mining Pty Ltd on behalf of the Jellinbah East Joint Venture.

Contractors

Lock

- subscription is required.

Deposit type

  • Sedimentary

Summary:

The Jellinbah coal deposit is approximately 30 km in length.

Jellinbah Mine falls on the eastern flank of the Comet Ridge of the Bowen Basin, at the north-western end of the Jellinbah Zone. The coal seams at Jellinbah Mine dip to the east.

The coal is at least 10 m deep at its shallowest location and increases as the seam dips by between 2 degrees and 20 degrees.

The major seam of the deposit is the Pollux Seam which is approximately 8 metres thick. The seam dips gently to the east and further down dip splits into the Pollux Upper & Pollux Lower seams.

The initial overburden layers are made up of clays and sands before reaching siltstones and mudstones that are above the coal layers. The overburden material has been classified as non-acid forming.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

CommodityUnits20232022202120202019201820172016
Coal (metallurgical) t  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe4,536,9214,827,3754,605,0794,743,857
Coal (thermal) t  ....  Subscribe  ....  Subscribe  ....  Subscribe243,545406,833220,711498,451
All production numbers are expressed as clean coal.

Operational metrics

Metrics20232022202120202019201820172016
Coal tonnes mined  ....  Subscribe
Hourly processing capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe
Annual production capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Tonnes processed  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe4,692,610 t5,235,631 t5,276,450 t5,578,113 t
Coal tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe5,285,186 t of ROM coal4,495,773 t of ROM coal5,610,171 t of ROM coal5,153,641 t of ROM coal

Production Costs

Commodity production costs have not been reported.

Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Dec 17, 2023
....................... Subscription required ....................... Subscription required Subscription required Dec 17, 2023
....................... Subscription required ....................... Subscription required Subscription required Dec 17, 2023
....................... Subscription required ....................... Subscription required Subscription required Dec 17, 2023
....................... Subscription required ....................... Subscription required Subscription required Dec 17, 2023
....................... Subscription required ....................... Subscription required Subscription required Dec 17, 2023

EmployeesYear
...... Subscription required 2022
...... Subscription required 2021
...... Subscription required 2020
...... Subscription required 2019
...... Subscription required 2018
...... Subscription required 2017
...... Subscription required 2016

Aerial view:

Lock

- subscription is required.