• Data Access
  • Your Email  
  • Your Email  
Keep me signed in.
Forgot your password?
Close
  • Forgot Your Password?
  • Enter the email you signed up with and we'll email it to you.
  • Your Email  
Close
Back
MDO
Mining Data Solutions
  • Home
  • Database
  • Subscribe
  • Sign In
  • Sign In
Angola
Lulo Mine

This page is not tailored to
devices with screen width under 750 px.
 Location:
273 km E from Melanje, Angola

  Regional Office:
Rua Major Kanhangulo nº 100
Luanda
Angola
Phone  ...  Subscription required
EmailEmail
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in Angola
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Financials
  • Fleet
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StageProduction
Mine TypeOpen Pit
Commodities
  • Diamond
Mining Method
  • Truck & Shovel / Loader
Processing
  • Dense media separation
  • X-Ray sorting
Lulo is the highest US dollar per carat alluvial diamond operation in the world.

Commercial alluvial diamond mining operations commenced at Lulo in January 2015.
Latest NewsLucapa restarts Lulo operations with 50% of workforce     May 1, 2020


Owners & OPERATOR

Source: p. 7
CompanyInterestOwnership
Lucapa Diamond Company Ltd. (operator) 40 % Indirect
Sociedade Mineira do Lulo, Lda (operator) 100 % Direct
Lucapa Diamond Company Ltd. - operator (40%)
Angolan Goverment - Endiama E.P. (32%)
Local partner - Rosas & Pétalas S.A. (28%)

Sociedade Mineira Do Lulo, Lda - owner mining operation.

Deposit Type

  • Kimberlite
  • Alluvial / Placer


Summary:

Lulo hosts a major kimberlite province and extensive diamond-bearing alluvial gravels.

Lulo lies within the ideal tectonic and stratigraphic setting where the Lucapa Graben crosses Angola’s most diamond rich Cuango basin. The Lucapa Graben is the same geological belt hosting most of Angola’s producing kimberlite mines, including neighbouring Catoca, the world’s fourth largest diamond mine. [p.4]

Lulo hosts 296 kimberlite targets in two separate provinces, of which 96 have been classified as proven and probable kimberlites and four confirmed as diamond-bearing pipes.

Alluvial diamonds
Alluvial diamonds is the term used to describe diamonds that have been eroded from its primary source (ie from a kimberlite or lamproite intrusive host) and over time (millions of years) deposited in a new secondary environment such as gravels in a river bed, or off-shore. [p.5]

Three different aged gravel horizons within the project area:
• Calonda Formation: a fluvial sedimentary sequence of Late Cretaceous age, largely accumulated as fan deposits and braided stream washes which formed around the time of the kimberlite eruptions in the area. Poorly-sorted diamondbearing basal gravel (0.3 - 4m in thickness) overlain by gritty sands and silts.
• Kalahari Formation: a gravel horizon at or near the base of the Kalahari Formation, largely wind-blown sand unit with fluvial components near the base. The gravel units contain abundant kimberlitic indicator minerals and diamonds.
• Recent River Terraces: significant diamondiferous gravel deposits associated with the current river system. [p.5]

Alluvial mining and exploration activities at Lulo have until recently been focused primarily on the terrace deposits along a ~50km stretch of the Cacuilo River running through the ~3,000km2 concession, much of which remains untested. [https://www.lucapa.com.au/alluvial-diamond-mining]

However, through ongoing exploration programs, the Lulo partners recently discovered that in addition to the terraces, the previously-untested flood plains (leziria areas) along the Cacuilo River also host large and premium-quality diamonds. [https://www.lucapa.com.au/alluvial-diamond-mining]

These flood plains are extensive, highlighting the potential for a significant expansion of diamond resources and mine life at Lulo. [https://www.lucapa.com.au/alluvial-diamond-mining]


Mining Methods

  • Truck & Shovel / Loader


Summary:

Lucapa and its Angolan partners Endiama and Rosas & Petalas commenced commercial alluvial diamond mining operations at Lulo in January 2015.

Alluvial mining and exploration activities at Lulo have until recently been focused primarily on the terrace deposits along a ~50km stretch of the Cacuilo River running through the ~3,000km2 concession, much of which remains untested.

However, through ongoing exploration programs, the Lulo partners recently discovered that in addition to the terraces, the previously-untested flood plains (leziria areas) along the Cacuilo River also host large and premium-quality diamonds.

A new Volvo and Caterpillar fleet of earthmooving equpment was purchases and arrived on site during 2019, comprising six excavators, eight trucks, two tracked dozers and a wheel dozer. [2019, AR, p.7]

This additional fleet is part of an expansion program designer to deliver a ~50% increase annulisated in carat production in 2020. [2019, AR, p.7]


Crushing and Grinding


Processing

  • Dense media separation
  • X-Ray sorting

Source: Subscription required

Summary:

The 1.1 Mtpa Lulo diamond plant includes XRT large-diamond recovery technology capable of recovering individual diamonds of up to 1,100 carats.

The recovery process involves DMS separation, Xray sorting of the heavy concentrate and hand sorting of the X-ray concentrate. [03/27/2017 ASX Announcement, p.13]

Samples are processed through a DMS plant. The plant uses a 420mm diameter cyclone and has a nominal head feed treatment rate of 150 tonnes per hour. [03/27/2017 ASX Announcement, p.13]

The Lulo large diamond recovery circuit, including a TOMRA sorting unit, went into commercial operation in the December 2016 Quarter, processing oversize alluvial gravels at the Lulo Diamond Project in Angola. As part of the new coarse recovery stream at the 150 tonne per hour diamond plant, the XRT technology has provided to recover individual diamonds up to 1,100 carats. The XRT sorting technology is significantly more effective for the recovery of higher quality low ........

Recoveries & Grades:

CommodityParameter20192018201720162015
Diamond Head Grade, carats/cu.m 0.070.070.070.10.08

Production:

CommodityUnits20192018201720162015
Diamond carats  ......  Subscription required  ......  Subscription required18,70619,8328,394
All production numbers are expressed as mineral.
Subscription required - Subscription is required.

Operational Metrics:

Metrics20192018201720162015
Tonnes processed  ......  Subscription required  ......  Subscription required  ......  Subscription required189,334 cu. m112,586 cu. m
Annual processing capacity  ......  Subscription required  ......  Subscription required  ......  Subscription required
Subscription required - Subscription is required.

Reserves at December 31, 2019:
Lulo Alluvial Diamond Resource
- The resource is reported as a diluted resource.
- Diluted volumes have been estimated based on historical mining production data to better reflect recoverable volumes and grades.
- Bottom cut off screen size: effective 1.5mm.

CategoryTonnage CommodityGradeContained carats
Inferred 1,151,200 cu. m Diamond 0.0875 carats/cu.m 100,700 carats

Financials:

Units20192018201720162015
Revenue M USD  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required 9.45  
EBITDA M USD  ......  Subscription required  ......  Subscription required  ......  Subscription required
Subscription required - Subscription is required


Heavy Mobile Equipment:
HME TypeModelQuantityRef. Date
Dozer (crawler) 2 Dec 31, 2019
Dozer (rubber tire) 1 Dec 31, 2019
Excavator ....................... Subscription required 1 Oct 14, 2015
Excavator 6 Dec 31, 2019
Truck (haul) 8 Dec 31, 2019
Truck (haul) ....................... Subscription required 1 Oct 14, 2015
Subscription required - Subscription is required.

Mine Management:

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Sep 24, 2020
....................... Subscription required ....................... Subscription required Subscription required Sep 24, 2020
....................... Subscription required ....................... Subscription required Subscription required Sep 24, 2020
....................... Subscription required ....................... Subscription required Subscription required Sep 24, 2020
....................... Subscription required ....................... Subscription required Subscription required Sep 24, 2020
Subscription required - Subscription is required.


Corporate Filings & Presentations:

DocumentYear
................................... Subscription required 2019
................................... Subscription required 2019
................................... Subscription required 2018
Annual Report 2017
Press Release 2017
Press Release 2017
Annual Report 2016
Project Description 2015
Subscription required - Subscription is required.

News:

NewsDate
Lucapa restarts Lulo operations with 50% of workforce May 1, 2020

Aerial view:

Subscription required - Subscription is required.

Terms of Use Privacy Policy © 2020 MDO Data Online Inc.