Mining Intelligence and Sales Leads
Uganda

Orom-Cross Project

Click for more information

Categories

Summary

Mine TypeOpen Pit
Study CompletedFeasibility
Commodities
  • Graphite
Mining Method
  • Truck & Shovel / Loader
Project Timeline... Lock
Mine Life... Lock
SnapshotOrom-Cross is a graphite development project that has progressed from early-stage development through definitive studies in just five years.

Development has been supported by a non-dilutive U.S. Government funding package via the U.S. International Development Finance Corporation (DFC), including a US$5M Technical Assistance Grant, preserving project equity and helping de-risk the pathway to production through a tier-one funding partner.

The project is positioned as a potentially world-class graphite asset based on its scale and end-product quality, with a strong proportion of higher-value coarse flake material, and is underpinned by a 21-year Mining Licence issued in 2019.

Owners

SourceSource
CompanyInterestOwnership
Blencowe Resources Plc 100 % Indirect
The Orom-Cross Graphite Project is owned indirectly 100% by Blencowe Resources plc via its wholly owned subsidiary, Consolidated African Resources (Uganda) Ltd., which is the project operator.

Contractors

Lock

- subscription is required.

Deposit type

  • Metamorphic

Summary:

Orom-Cross presents as a large, shallow open-pitable deposit, and geology at the new Iyan and Beehive deposits closely mirrors the Northern Syncline and Camp Lode deposits respectively, signalling potential to double the resource once incorporated.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Required Heavy Mobile Equipment

Lock

- subscription is required.

EV - Electric

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Commodity Production

CommodityProductUnitsAvg. Annual
Graphite USPG t 56,500 *
Graphite Concentrate kt 97 *
* According to 2025 study.

Production Costs

CommodityUnitsAverage
All-in sustaining costs (AISC) Graphite USD  ....  Subscribe
Assumed price Graphite USD  ....  Subscribe
* According to 2025 study / presentation.

Project Costs

MetricsUnitsLOM Total
Initial CapEx $M USD  ......  Subscribe
Expansion CapEx $M USD  ......  Subscribe
After-tax Cash Flow (LOM) $M USD  ......  Subscribe
After-tax NPV @ 10% $M USD  ......  Subscribe
After-tax IRR, %  ......  Subscribe

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Jan 12, 2026

Workforce

Aerial view:

Lock

- subscription is required.