Mining Intelligence and Sales Leads
Uganda

Orom-Cross Project

Click for more information

Categories

Summary

Mine TypeOpen Pit
Study CompletedFeasibility
Commodities
  • Graphite
Mining Method
  • Truck & Shovel / Loader
Project Timeline... Lock
Mine Life... Lock
SnapshotOrom-Cross is a potential world class graphite project both by size and end-product quality, with a high component of more valuable larger coarse flakes within the deposit.

A 21-year Mining Licence for the project was issued by the Ugandan Government in 2019 following extensive historical work on the deposit. Blencowe has now completed a successful Definitive Feasibility Study phase (2025) as the first major step towards initial production.

Resource has been defined from only ~2% of the total tenement area which presents considerable upside potential ahead, with two new deposits recently drilled at Beehive and Iyan set to add into the Resource in 2026. With all major infrastructure available at or near to site the capital costs will also be relatively low in comparison to most graphite peers.

Owners

SourceSource
CompanyInterestOwnership
Blencowe Resources Plc 100 % Indirect
The Orom-Cross project is 100% owned by Blencowe Resources Plc.

Deposit type

Summary:

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Fleet data has not been reported.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Commodity Production

CommodityProductUnitsAvg. Annual
Graphite USPG t 56,500 *
Graphite Concentrate kt 97 *
* According to 2025 study.

Production Costs

CommodityUnitsAverage
All-in sustaining costs (AISC) Graphite USD  ....  Subscribe
Assumed price Graphite USD  ....  Subscribe
* According to 2025 study / presentation.

Project Costs

MetricsUnitsLOM Total
Pre-Production capital costs $M USD  ......  Subscribe
After-tax Cash Flow (LOM) $M USD  ......  Subscribe
After-tax NPV @ 10% $M USD  ......  Subscribe
After-tax IRR, %  ......  Subscribe

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Jan 12, 2026

Workforce

Aerial view:

Lock

- subscription is required.