Mining Intelligence and News
Malawi

Kangankunde (Stage 1) Project

Click for more information

Categories

Overview

Mine TypeOpen Pit
StagePermitting
Commodities
  • REE
  • Neodymium
  • Monazite
  • Praseodymium
Mining Method
  • Truck & Shovel / Loader
Project Timeline... Lock
Mine Life... Lock
SnapshotThe Kangankunde Rare Earths Project is one of the largest global deposits, with high-grade rare earths and low impurity levels.

Stage 1, which includes mining, a processing plant, and supporting infrastructure, carries low technical risk and lays the foundation for future expansions.

The project is fully permitted, with all major permits granted, and is construction-ready, supported by strong government and community backing.

Additionally, the site access road contract has been awarded, ensuring the seamless transportation of materials and the timely development of the processing plant.

Owners

SourceSource
CompanyInterestOwnership
Lindian Resources Ltd. 66 % Indirect
Lindian Resources Limited has 66% ownership of Malawian registered Rift Valley Resource Developments Limited that has 100% title to Exploration Licence EPL0514/18R and Mining Licence MML0290/22 for the Kangankunde Project.

It is the intent that Lindian will move to 100% ownership of RVR by making the final US$10M vendor payment at or before process plant commissioning commences.

Contractors

Lock

- subscription is required.

Deposit type

  • Carbonatite hosted
  • Breccia pipe / Stockwork

Summary:

The Kangankunde carbonatite complex is located in the Chilwa Alkaline Province of Southern Malawi. The carbonatite is aged between 117-129 million years and forms a distinctive low hill, rising approximately 200 metres above the surrounding plain.

The complex has a central carbonate core surrounded by zones transitioning from carbonatite-rich rock, composed primarily of dolomite, siderite and ankerite, to fenitised polymictic breccias and gneiss.

Rare earth mineralisation is dominated by monazite ((RE)PO4). Unlike many rare earth deposits, significant mineralisation is found in all rock types at Kangankunde, albeit primarily in carbonatite-rich rocks and breccias, and even extends into surrounding wall rocks in veins and stockworks.

Structural disruptions include NW/SE striking faults with sub-vertical dips, causing up to tens of metres of displacement and affecting carbonatite mineralisation contacts with surrounding brecciated wall rocks.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

Production figures for Nd2O3+Pr6O11 are shown from TREO oxide in concentrate.
CommodityProductUnitsAvg. AnnualLOM
Total Rare Earth Oxides Oxide in concentrate t 8,259369,601
Nd2O3+Pr6O11 Oxide in concentrate t 1,61372,203
Monazite Concentrate kt 15686

Operational metrics

Metrics
Daily processing capacity  ....  Subscribe
Hourly processing capacity  ....  Subscribe
Annual ore mining rate  ....  Subscribe
Annual mining rate  ....  Subscribe
Annual processing capacity  ....  Subscribe
Stripping ratio  ....  Subscribe
Waste tonnes, LOM  ....  Subscribe
Ore tonnes mined, LOM  ....  Subscribe
Tonnes processed, LOM  ....  Subscribe
* According to 2024 study.

Production Costs

CommodityUnitsAverage
All-in sustaining costs (AISC) Nd2O3+Pr6O11 USD  ....  Subscribe
All-in sustaining costs (AISC) Total Rare Earth Oxides USD  ....  Subscribe
Assumed price Nd2O3+Pr6O11 USD  ....  Subscribe
* According to 2024 study / presentation.

Project Costs

MetricsUnitsLOM Total
Pre-Production capital costs $M USD  ......  Subscribe
OP OpEx $M USD  ......  Subscribe
Processing OpEx $M USD 402
Transportation (haulage) costs $M USD 109
G&A costs $M USD 221
Royalty payments $M USD  ......  Subscribe
Gross revenue (LOM) $M USD  ......  Subscribe
EBITDA (LOM) $M USD  ......  Subscribe
Pre-tax NPV @ 8% $M USD  ......  Subscribe
After-tax NPV @ 8% $M USD  ......  Subscribe
Pre-tax IRR, %  ......  Subscribe
After-tax IRR, %  ......  Subscribe
Pre-tax payback period, years  ......  Subscribe
After-tax payback period, years  ......  Subscribe

Required Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Feb 14, 2025
....................... Subscription required ....................... Subscription required Subscription required Feb 14, 2025
....................... Subscription required ....................... Subscription required Subscription required Feb 14, 2025

EmployeesYear
...... Subscription required 2024

Aerial view:

Lock

- subscription is required.