Overview

Mine TypeOpen Pit
StagePermitting
Commodities
  • Kaolin
Mining Method
  • Truck & Shovel / Loader
Mine Life... Lock
SnapshotThe Great White Project (TGWP) is high-grade kaolin asset delivering premium products over a 28-year mine life.

The Great White Project is construction ready with the required permits in place.

The plant construction has been segregated into a number of stages to ramp up capacity in line with projected demand.

With the finalisation of the Traxys offtake (17 July 2024), the Andromeda now has the required foundations to move towards making a final investment decision (FID) for Stage 1A+.
- Fully permitted
- Feasibility Studies complete
- Offtakes signed

Stage 1A+ will be funded through a combination of debt and equity.

Andromeda is engaging with potential lenders and government funding initiatives are also being investigated to support the project.

The timeframe to complete a greenfield development funding process can typically take between 4-5 months, after which a final investment decision can take place.

Owners

SourceSource
CompanyInterestOwnership
Andromeda Metals Ltd. 100 % Indirect
Great White project 100 % owns by Andromeda Metals Ltd.

Contractors

Lock

- subscription is required.

Deposit type

  • Sedimentary

Summary:

The Great White Project deposit is a naturally high purity, bright white kaolin with low levels of impurities, specifically Fe2O3.

The Project has highly valued kaolinite and halloysite mineral deposits with a world-class iron to alumina ratio2, outstanding mechanical strength, exceptional fired brightness, and distinctive rheological properties.

The orebody is predominantly quartz sands (~ 45 % - 55 %) and clay (~45 % - 55 % kaolinite and halloysite).

The kaolin is shallow lying and truncated at depth by a weathered granite.

Kaolin deposits, such as Great White, developed in situ by lateritic weathering of the feldspar-rich Hiltaba Granite.

The kaolin deposit at Great White is a sub-horizontal zone of kaolinised granite resting with a fairly sharp contact on unweathered granite. The kaolinised zone is overlain by loosely consolidated Tertiary and Quaternary sediments.

The deposit covers an area 1.7km east-west by 1.7km north-south and has an average depth below surface is 23.9m with a range of 10m in the west to 46m in the east. The deposit has an average thickness of 9.4m with a maximum thickness of 23.9m and with extremities modelled down to 1m.

The 34.6Mt of in-situ Bright White kaolinised granite yields 17.4Mt of minus 45 micron quality kaolin product.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

Kaolin Product: Great White CRM™P; Great White CRM™T; Great White KCM™90; Great White HRM™.
CommodityUnitsAvg. AnnualLOM
Kaolin kt 3007,355
All production numbers are expressed as total.

Operational metrics

Metrics
Annual production capacity  ....  Subscribe
Stripping / waste ratio  ....  Subscribe
* According to 2023 study.

Production Costs

CommodityUnitsAverage
All-in sustaining costs (AISC) Kaolin AUD  ....  Subscribe
* According to 2023 study / presentation.

Project Costs

MetricsUnitsLOM Total
Sustaining CapEx $M AUD  ......  Subscribe
Pre-tax NPV @ 8% $M AUD  ......  Subscribe
After-tax NPV @ 8% $M AUD  ......  Subscribe
Pre-tax IRR, %  ......  Subscribe
After-tax IRR, %  ......  Subscribe
After-tax payback period, years  ......  Subscribe

Required Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNamePhoneEmailProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Aug 23, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 23, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 23, 2024
....................... Subscription required ....................... Subscription required ........... Subscription required Subscription required Aug 24, 2023
....................... Subscription required ....................... Subscription required ........... Subscription required ........... Subscription required Subscription required Aug 27, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 23, 2024

Total WorkforceYear
...... Subscription required 2023

Aerial view: