South Africa

Mogale Project

Click for more information

Categories

Overview

Mine TypeTailings
StageConstruction
Commodities
  • Gold
Mining Method
  • Hydraulic mining
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotThe Mogale Tailings Retreatment project (MTR project) consists of the Mogale Cluster tailings storage facilities (TSFs) and the Soweto Cluster TSFs(MSC).

The Company completed a definitive feasibility study on the Mogale Gold TSFs and announced the results of this study on 30 June 2022 (the study). The study demonstrated compelling economics and the potential to significantly increase the Group’s gold production (an increase in excess of 25% compared to current Group annual production) over an initial life-of-mine of 13 years. Remining of the MSC TSFs has the potential to add further production upside and extend the life-of-mine to 21 years.

Owners

SourceSource
CompanyInterestOwnership
Pan African Resources plc 100 % Indirect
As announced on SENS on 6 October 2022, the Company closed the transaction whereby Mogale Tailings Retreatment Proprietary Limited (MTR), a wholly owned subsidiary of the Company, would acquire the total share capital and claims of Mogale Gold and MSC, (collectively, the sale transaction).

Contractors

Lock

- subscription is required.

Deposit type

  • Tailings

Summary:

The ore that will be treated at the MTR plant originated from the previously mined and metallurgically treated Kimberley, Bird, Livingstone, South and Main Reefs from historical gold mining operations of WRCM, Luipaardsvlei Gold Mine, Rand Leases and DRD Gold. The reefs are arenaceous conglomeratic sedimentary rocks of the Archaean age and are generally considered as ancient river placers. These reefs are frequently less than a metre thick and characterised by abundant pyrite, which may comprise up to 5% of the reef, as well as flyspeck and/or seam carbon/kerogen. These three components display a strong spatial correlation with the gold mineralisation, which is rarely visible, in the 10 to 20 micron range.

The tailings of the treated material were deposited onto various TSFs on surface that will be reclaimed over the modelled life of the operation. Once re-treated, the final tailings emanating from these TSFs will be consolidated into a modern tailings facility, through the filling of legacy opencast mines and the construction of an enlarged modern facility on the 1L23-25 footprint. This will reduce the MTR plant’s environmental footprint and associated environmental impact.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

CommodityUnitsAvg. Annual
Gold koz 50

Operational metrics

Metrics
Annual processing capacity  ....  Subscribe
Ore tonnes mined, LOM  ....  Subscribe
* According to 2022 study.

Production Costs

CommodityUnitsAverage
All-in sustaining costs (AISC) Gold USD  ....  Subscribe
Assumed price Gold USD  ....  Subscribe
* According to 2022 study / presentation.

Operating Costs

Currency2022
Total operating costs ($/t milled) USD 5 *  
* According to 2022 study.

Project Costs

MetricsUnitsLOM Total
Initial CapEx $M USD  ......  Subscribe
Pre-tax NPV @ 9.5% $M USD  ......  Subscribe
Pre-tax IRR, %  ......  Subscribe
Pre-tax payback period, years  ......  Subscribe

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Oct 23, 2023
....................... Subscription required ....................... Subscription required Subscription required Oct 23, 2023

Aerial view:

Lock

- subscription is required.